Sign In  |  Register  |  About Daly City  |  Contact Us

Daly City, CA
September 01, 2020 1:20pm
7-Day Forecast | Traffic
  • Search Hotels in Daly City

  • CHECK-IN:
  • CHECK-OUT:
  • ROOMS:

First Phosphate Corp ends Drill Program plans Upcoming Resource Estimate at Bégin-Lamarche Project

--News Direct--

First Phosphate Corp CEO John Passalacqua Chief Geologist Gilles Laverdiere joined Steve Darling from Proactive to announce that all results from the drilling program at its Bégin-Lamarche project are now available. The 99-hole drill program, totaling 25,929 meters, has uncovered a significant high-quality igneous phosphate deposit. The drilling has shown continuous phosphate mineralization over a length of 2,400 meters, spread across three mineralized zones.

Laverdiere explained that a NI 43-101 resource estimate is currently underway and will be immediately followed by a Preliminary Economic Assessment. A total of 23 drill holes were completed in the Mountain Zone, totaling 5,023 meters. The Mountain Zone exhibits grades of more than 10% P2O5 over widths ranging from 7 meters to 99 meters. In the Southern Zone, drilling was conducted at 100-meter spaced sections over a length of 1,700 meters, with 57 drill holes totaling 15,219 meters.

Passalacqua says the company anticipates having the resource estimate completed in the coming months, marking a significant milestone in the project's development.

Contact Details

Proactive Investors

+1 604-688-8158

na-editorial@proactiveinvestors.com

View source version on newsdirect.com: https://newsdirect.com/news/first-phosphate-corp-ends-drill-program-plans-upcoming-resource-estimate-at-begin-lamarche-project-152116095

Data & News supplied by www.cloudquote.io
Stock quotes supplied by Barchart
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.
 
 
Copyright © 2010-2020 DalyCity.com & California Media Partners, LLC. All rights reserved.