Sign In  |  Register  |  About Daly City  |  Contact Us

Daly City, CA
September 01, 2020 1:20pm
7-Day Forecast | Traffic
  • Search Hotels in Daly City

  • CHECK-IN:
  • CHECK-OUT:
  • ROOMS:

EnviroGold Announces Commencement of Pilot Program on Hellyer Tailings with ALS Perth, and Shares for Debt Transaction

TORONTO, Jan. 03, 2023 (GLOBE NEWSWIRE) -- EnviroGold Global Limited (CSE: NVRO | OTCQB: ESGLF |FSE: YGK) (“EnviroGold Global” or the “Company”), a Clean Technology Company accelerating the world’s transition to a circular-resource economy, is commencing a pilot program (the “Program”) to optimize its patent-pending process’ application to the Hellyer Tailings Reprocessing Project (the “Process”). Results of Phase 1 are expected in early Q1 2023 and will be a key milestone to deploying a full-scale pilot program as a precursor to plant engineering and construction at Hellyer. More details and economics on the Hellyer Project can be found here: Link to Press Release. More details on the Company’s proprietary process and patent filing can be found here: Link to Press Release.

The Program is intended to optimize the Process’ effectiveness and efficiency through bench scale and larger-scale pilot plant optimization. The Program will establish the maximum metal extraction achievable from tailings, producing precious metals doré, copper and zinc products, and confirm baseline reagent requirements. The Program will also elicit data necessary for economic validation and engineering design, as well as demonstrate the neutralization of the waste product (from acid-forming pyrites to inert goethite and scorodite precipitation), thereby demonstrating the significant environmental benefits.

Separately, the Company’s board of directors has approved the settlement of US$231,835 in debt (the “Debt Settlement”) through the issuance of 1,448,970 common shares (“Shares”) of the Company to Anderson Creagh Lai (the “Creditor”) for general legal fees. The Creditor is a "Non-Arm's Length Party” of the Company, a legal firm for which Phil Creagh (a director of the Company) is a partner and a shareholder.

The Shares have been issued at a deemed price of $0.21 per Share and the Company has relied upon section 2.24 of National Instrument 45-106 for the Issuance of the Shares without a statutory hold period. The Company agreed to satisfy this outstanding indebtedness with Shares to preserve the Company’s cash. None of the securities issued in connection with the private placement have been registered under the United States Securities Act of 1933, as amended (the "1933 Act"), and none of them have been offered or sold in the United States absent registration or an applicable exemption from the registration requirements of the 1933 Act. This news release shall not constitute an offer to sell or a solicitation of an offer to buy nor shall there be any sale of the securities in any state where such offer, solicitation, or sale would be unlawful.

The Debt Settlement is exempt from the valuation and minority shareholder approval requirements of Multilateral Instrument 61-101 (“MI 61-101”) by virtue of the exemptions contained in sections 5.5(a) and 5.7(1)(a) of MI 61-101 in that the fair market value of the consideration for the securities of the Company to be issued to the Creditor does not exceed 25% of its market capitalization.

About EnviroGold Global

EnviroGold Global (CSE: NVRO) (OTCQB: ESGLF) (FSE: YGK), is a CleanTech company dedicated to creating shareholder value while establishing ESG & circular economy leadership by profitably reprocessing & remediating mine waste (tailings) to recover precious, critical & strategic metals – including gold, silver, copper & nickel. Led by CEO Dr. Mark Thorpe, the Company is strategically positioned to earn and maintain social license while capitalizing the estimated US$ 3.4 trillion of in situ metal value in global tailings. Dr. Thorpe is also the Chairman of the Canadian Mining Innovation Council.

EnviroGold Global’s commercial strategy involves applying proprietary and advanced technologies to resolve some of the world’s most challenging waste related issues, while generating profits from the reclamation of resources. EnviroGold Global’s commercial strategy is being developed in three distinct strategic horizons, with the Company’s near-term focus on applying proprietary precious and critical metal liberation technology to the recovery of valuable materials from refractory mine tailings, where the Company has identified an accelerated route to generating high free cash flow beginning with the Company’s Hellyer Tailings Reprocessing Project in 2023. There are over 280 billion metric tonnes of mine tailings on the earth’s surface with a contained metal value that exceeds US$3.4T. Leveraging a detailed, proprietary screening process, the Company’s extensive market analysis has identified potential tailings targets with a contained value exceeding US$10B, and has identified refractory, polymetallic, VMS tailings as a tailings sub-segment representing substantial and scalable economic opportunity. As EnviroGold Global successfully commercializes its metal liberation technology, the Company will expand its commercialization initiatives to include other, high-value waste reclamation and environmental remediation opportunities.

EnviroGold Global acquires the metal recovery rights to tailings sites by leveraging a profit share business model to create an attractive value proposition for site owners. The Company’s business model is designed to generate high free-cash flow & high target IRR while eliminating the risks of traditional exploration and extraction. The Company expects to produce metals with a carbon footprint up to 96% lower than conventional metal producers while reducing the environmental footprint of legacy mining.

As of November 2022, the Company has eight major projects in its global project pipeline including two major projects under definitive contracts and six additional major projects at various stages of commercial negotiation and detailed technical/economic review.

The Company expects to commence production of precious metals (gold and silver), clean energy metals and battery metals (copper, lead, zinc) at its Australia project in 2023.

Further Information

Dr. Mark B. Thorpe

Chief Executive Officer

Telephone: +1 416 777 6720

Email: mark.thorpe@envirogoldglobal.com

Juan Carlos Giron Jr.

Sr. Vice President

Telephone: +1 416 777 6720

Email: juan.giron@envirogoldglobal.com

Website: www.EnviroGoldGlobal.com

Neither the Canadian Securities Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Forward Looking Statements

This news release contains “forward-looking statements” within the meaning of applicable securities laws, including, without limitation, earnings guidance, economic guidance, operational guidance and future capital spending amounts. All statements contained herein that are not clearly historical in nature may constitute forward-looking statements.

Graphical representations included in this news release are approximate representations which may vary from defined regulatory boundaries.

Generally, such forward-looking information or forward-looking statements can be identified by the use of forward-looking terminology such as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases or may contain statements that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “will continue”, “will occur” or “will be achieved”. The forward-looking information and forward-looking statements contained herein include, but are not limited to, statements regarding the expected terms of the Hellyer Tailings Reprocessing Project and its completion, the Company’s working relationship with the owner(s) of the Hellyer Tailings, the economic viability of the Hellyer Tailings Reprocessing Project and statements regarding any residual precious metals as a by-product of the remediation, the Company’s expansion of its reprocessing pipeline, and the Company’s ability to accelerate the world’s transition to a circular resource economy. Forward-looking information in this news release are based on certain assumptions and expected future events, namely: the Company’s ability to continue as a going concern; the continued commercial viability and growth in the clean technology and mining waste reprocessing industry; continued approval of the Company’s activities by the relevant governmental and/or regulatory authorities; the continued development of clean technology and mining waste reprocessing technology; and the continued growth of the Company. These statements involve known and unknown risks, uncertainties and other factors, which may cause actual results, performance or achievements to differ materially from those expressed or implied by such statements, including but not limited to: the potential inability of the Company to continue as a going concern; the Company’s inability to accelerate the world’s transition to a circular resource economy, the risks associated with assessing metallurgical recovery rates from mine tailings and waste and related volumetric assessments, the risks associated with the mining and mining waste recycling industry in general; increased competition in the clean technology and waste reprocessing market; the potential unviability of the clean technology and mining waste reprocessing market; incorrect assessment of the value and potential benefits of various transactions; risks associated with potential governmental and/or regulatory action with respect to clean technology and mining waste reprocessing; risks associated with a potential collapse in the value of clean technology and waste reprocessing; and risks relating to the Company’s potential inability to expand its reprocessing pipeline.

Readers are cautioned that the foregoing list is not exhaustive. Readers are further cautioned not to place undue reliance on forward-looking statements, as there can be no assurance that the plans, intentions or expectations upon which they are placed will occur. Such information, although considered reasonable by management at the time of preparation, may prove to be incorrect and actual results may differ materially from those anticipated. Forward-looking statements contained in this news release are expressly qualified by this cautionary statement and reflect the Company’s expectations as of the date hereof and are subject to change thereafter. The Company undertakes no obligation to update or revise any forward-looking statements, whether as a result of new information, estimates or opinions, future events or results or otherwise or to explain any material difference between subsequent actual events and such forward-looking information, except as required by applicable law.


Primary Logo

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.
 
 
Copyright © 2010-2020 DalyCity.com & California Media Partners, LLC. All rights reserved.