Sign In  |  Register  |  About Daly City  |  Contact Us

Daly City, CA
September 01, 2020 1:20pm
7-Day Forecast | Traffic
  • Search Hotels in Daly City

  • CHECK-IN:
  • CHECK-OUT:
  • ROOMS:

Vertiv Expands North American Production Capacity with New Infrastructure Solutions Manufacturing Facility

New South Carolina facility to support growing demand for integrated critical digital infrastructure solutions

Vertiv (NYSE: VRT), a global provider of critical digital infrastructure and continuity solutions, today announced a major expansion of its North American manufacturing operations with a new facility in Pelzer, South Carolina. The Vertiv Pelzer facility adds 215,000 square feet (about 20,000 square meters) of manufacturing space and is projected to create up to 300 additional skilled job opportunities at this location.

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20240924669043/en/

CEO Giordano Albertazzi at the opening of Vertiv's new infrastructure solutions manufacturing facility in Pelzer, South Carolina. (Photo: Business Wire)

CEO Giordano Albertazzi at the opening of Vertiv's new infrastructure solutions manufacturing facility in Pelzer, South Carolina. (Photo: Business Wire)

The Vertiv Pelzer facility will produce a variety of infrastructure solutions, including integrated modular solutions, modular power systems, and other integrated systems leveraging Vertiv’s portfolio of power, cooling, and IT infrastructure technologies for data centers. These prefabricated and pre-engineered solutions are fully factory pre-tested as a system, significantly reducing site labor requirements and overall data center time to market. Vertiv integrated modular solutions also provide a path for customers to confidently expand their operations in the future.

“Our global infrastructure solutions business is strong and growing, as the demand for AI accelerates and our customers see the value of an integrated approach to support faster compute deployment,�� said Vertiv CEO Giordano (Gio) Albertazzi. Increasing manufacturing capacity is critical to meeting the needs of our customers, and the Vertiv Pelzer operations are central to that mission for our Americas and global operations.”

In addition to the new Pelzer facility, Vertiv also has a switchgear and busbar manufacturing facility in nearby Anderson, South Carolina. Vertiv has increased capacity of its infrastructure solutions, switchgear and busbar businesses through increased utilization and footprint expansion in the United States, Mexico, Slovakia, United Arab Emirates, Ireland, and Northern Ireland.

For more information about Vertiv solutions, visit Vertiv.com.

About Vertiv

Vertiv (NYSE: VRT) brings together hardware, software, analytics and ongoing services to enable its customers’ vital applications to run continuously, perform optimally and grow with their business needs. Vertiv solves the most important challenges facing today’s data centers, communication networks and commercial and industrial facilities with a portfolio of power, cooling and IT infrastructure solutions and services that extends from the cloud to the edge of the network. Headquartered in Westerville, Ohio, USA, Vertiv does business in more than 130 countries. For more information, and for the latest news and content from Vertiv, visit Vertiv.com.

Forward-Looking Statements

This release contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, Section 27 of the Securities Act, and Section 21E of the Securities Exchange Act. These statements are only a prediction. Actual events or results may differ materially from those in the forward-looking statements set forth herein. Readers are referred to Vertiv’s filings with the Securities and Exchange Commission, including its most recent Annual Report on Form 10-K and any subsequent Quarterly Reports on Form 10-Q for a discussion of these and other important risk factors concerning Vertiv and its operations. Vertiv is under no obligation to, and expressly disclaims any obligation to, update or alter its forward-looking statements, whether as a result of new information, future events or otherwise.

Contacts

Data & News supplied by www.cloudquote.io
Stock quotes supplied by Barchart
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.
 
 
Copyright © 2010-2020 DalyCity.com & California Media Partners, LLC. All rights reserved.