SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 40-F
(Check One)
o | Registration statement pursuant to Section 12 of the Securities Exchange Act of 1934 | ||
or | |||
ý | Annual report pursuant to Section 13(a) or 15(d) of the Securities Exchange Act of 1934 |
For fiscal year ended: Commission File Number: |
December 31, 2011 No. 1-12384 |
SUNCOR ENERGY INC.
(Exact name of registrant as specified in its charter)
Canada (Province or other jurisdiction of incorporation or organization) |
1311,1321,2911, 4613,5171,5172 (Primary standard industrial classification code number, if applicable) |
98-0343201 (I.R.S. employer identification number, if applicable) |
150 - 6th Avenue S.W.
Box 2844
Calgary, Alberta, Canada T2P 3E3
(403) 296-8000
(Address and telephone number of registrant's principal executive office)
CT Corporation System
111 Eighth Avenue
New York, New York, U.S.A. 10011
(212) 894-8940
(Name, address and telephone number of agent for service in the United States)
Securities registered pursuant to Section 12(b) of the Act:
Title of each class: | Name of each exchange on which registered: |
||
Common shares |
New York Stock Exchange |
Securities registered or to be registered pursuant to Section 12(g) of the Act:
None
Securities for which there is a reporting obligation pursuant to Section 15(d) of the Act:
None
For annual reports, indicate by check mark the information filed with this form:
ý | Annual Information Form | ý | Annual Audited Financial Statements |
Indicate the number of outstanding shares of each of the issuer's classes of capital or common stock as of the close of the period covered by the annual report:
Common Shares | As of December 31, 2011 there were 1,558,636,368 Common Shares issued and outstanding |
||
Preferred Shares, Series A |
None |
Indicate by check mark whether the registrant: (1) has filed all reports required to be filed by Section 13 or 15(d) of the Exchange Act during the proceeding 12 months (or for such shorter period that the registrant was required to file such reports); and (2) has been subject to such filing requirements in the past 90 days.
Yes | ý | No | o |
Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files).
Yes | o | No | o |
ANNUAL INFORMATION FORM DATED MARCH 1, 2012
ANNUAL INFORMATION FORM DATED MARCH 1, 2012
TABLE OF CONTENTS
ADVISORIES | 1 | ||
GLOSSARY OF TERMS AND ABBREVIATIONS | 1 | ||
Common Industry Terms | 1 | ||
Common Abbreviations | 3 | ||
Conversion Table | 4 | ||
CORPORATE STRUCTURE | 4 | ||
Name and Incorporation | 4 | ||
Intercorporate Relationships | 4 | ||
GENERAL DEVELOPMENT OF THE BUSINESS | 6 | ||
Overview | 6 | ||
Three-Year History | 7 | ||
NARRATIVE DESCRIPTION OF SUNCOR'S BUSINESSES | 9 | ||
Oil Sands | 9 | ||
Exploration and Production | 15 | ||
Refining and Marketing | 21 | ||
Other Suncor Businesses | 24 | ||
SUNCOR EMPLOYEES | 24 | ||
SIGNIFICANT POLICIES | 25 | ||
STATEMENT OF RESERVES DATA AND OTHER OIL AND GAS INFORMATION | 25 | ||
Oil and Gas Reserves Tables and Notes | 27 | ||
Future Net Revenues Tables and Notes | 34 | ||
Additional Information Relating to Reserves Data | 41 | ||
INDUSTRY CONDITIONS | 51 | ||
RISK FACTORS | 57 | ||
DIVIDENDS | 67 | ||
DESCRIPTION OF CAPITAL STRUCTURE | 68 | ||
MARKET FOR SECURITIES | 70 | ||
DIRECTORS AND EXECUTIVE OFFICERS | 71 | ||
AUDIT COMMITTEE INFORMATION | 74 | ||
LEGAL PROCEEDINGS AND REGULATORY ACTIONS | 76 | ||
INTEREST OF MANAGEMENT AND OTHERS IN MATERIAL TRANSACTIONS | 76 | ||
TRANSFER AGENT AND REGISTRAR | 76 | ||
MATERIAL CONTRACTS | 76 | ||
INTERESTS OF EXPERTS | 76 | ||
DISCLOSURE PURSUANT TO THE REQUIREMENTS OF THE NEW YORK STOCK EXCHANGE | 76 | ||
ADDITIONAL INFORMATION | 77 | ||
ADVISORY FORWARD-LOOKING INFORMATION | 77 | ||
SCHEDULES | |||
Schedule "A" Audit Committee Mandate | A-1 | ||
Schedule "B" Suncor Energy Inc. Policy and Procedures for Pre-Approval of Audit and Non-Audit Services | B-1 | ||
Schedule "C" Form 51-101F2 Report on Reserves Data by Independent Qualified Reserves Evaluator or Auditor | C-1 | ||
Schedule "D" Form 51-101F2 Report on Reserves Data by Independent Qualified Reserves Evaluator or Auditor | D-1 | ||
Schedule "E" Form 51-101F3 Report of Management and Directors on Reserves Data and Other Information | E-1 |
i SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
In this Annual Information Form (AIF), references to "we", "our", "us", "Suncor" or "the company" mean Suncor Energy Inc., its subsidiaries, partnerships and joint venture investments, unless the context otherwise requires. On August 1, 2009, Suncor completed its merger with Petro-Canada, referred to in this document as the "merger". References to the "Board of Directors" or the "Board" mean the Board of Directors of Suncor Energy Inc., unless the context otherwise requires.
All financial information is reported in Canadian dollars, unless otherwise noted. Production volumes are presented on a working-interest basis, before royalties, unless otherwise noted. Certain amounts in prior years may have been reclassified to conform to the current year's presentation.
References to our 2011 audited Consolidated Financial Statements mean Suncor's audited Consolidated Financial Statements prepared in accordance with Canadian generally accepted accounting principles (GAAP), the notes and the auditors' report, as at and for each year in the two-year period ended December 31, 2011. References to our MD&A mean Suncor's Management's Discussion and Analysis, dated February 23, 2012.
Unless otherwise noted, all financial information has been prepared in accordance with Canadian GAAP, which is within the framework of International Financial Reporting Standards (IFRS).
This AIF contains forward-looking information based on Suncor's current expectations, estimates, projections and assumptions. This information is subject to a number of risks and uncertainties, including those discussed in this document in the Risk Factors section, many of which are beyond the company's control. Users of this information are cautioned that actual results may differ materially. Refer to the Advisory Forward-Looking Information section of this AIF for information on other risk factors and the material assumptions underlying our forward-looking information.
Information contained in or otherwise accessible through Suncor's website www.suncor.com does not form a part of this AIF, and is not incorporated into the AIF by reference.
GLOSSARY OF TERMS AND ABBREVIATIONS
Common Industry Terms
Products
Hydrocarbons are solids, liquids or gas made up of compounds of carbon and hydrogen, in varying proportions.
Crude oil is a mixture of pentanes (lighter hydrocarbons) and heavier hydrocarbons that exists in the liquid phase in reservoirs and remains liquid at atmospheric pressure and temperature. Crude oil may contain small amounts of sulphur and other non-hydrocarbons, but does not include liquids obtained in the processing of natural gas.
Bitumen or heavy crude oil is a naturally occurring viscous mixture, consisting mainly of pentanes and heavier hydrocarbons, which may not be recoverable at a commercial rate in its naturally occurring viscous state through a well without using enhanced recovery methods. After it is extracted, bitumen or heavy crude oil may be upgraded into crude oil and other petroleum products.
Conventional crude oil is crude oil produced through wells by standard industry recovery methods.
Oil sands are naturally occurring deposits of sand or sandstone, or other sedimentary rocks that contain bitumen.
Synthetic crude oil (SCO) is a mixture of hydrocarbons derived by upgrading bitumen from oil sands. SCO may contain sulphur or other non-hydrocarbon compounds and has many similarities to crude oil. SCO with lower sulphur content is referred to as sweet synthetic crude oil, while SCO with higher sulphur content is referred to as sour synthetic crude oil.
West Texas Intermediate is a type of crude oil used as a benchmark in oil pricing, and is the underlying commodity of futures contracts on the New York Mercantile Exchange (NYMEX).
Natural gas is a mixture of lighter hydrocarbons, which at atmospheric conditions of temperature and pressure is in a gaseous state.
Conventional natural gas is natural gas produced from all geological strata, including associated, non-associated and solution gas, but excluding coal bed methane and shale gas.
Non-associated gas is an accumulation of natural gas in a reservoir where there is no crude oil. Associated gas is the gas cap overlying a crude oil accumulation in a reservoir.
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 1
Solution gas is natural gas dissolved in crude oil in a reservoir.
Natural gas liquids (NGLs) are hydrocarbon components that can be recovered from natural gas as liquids, including, but not limited to, ethane, propane, butanes, pentanes, plus condensate and small quantities of non-hydrocarbons.
Oil and gas exploration and development processes
Development costs are costs incurred to obtain access to reserves and to provide facilities for extracting, treating, gathering and storing the oil and gas from reserves.
Exploration costs are costs incurred in identifying areas that may warrant examination and in examining specific areas that are considered to have prospects that may contain oil and gas reserves.
Field is a defined geographical area consisting of one or more pools containing hydrocarbons.
Glory hole is an excavation into the sea floor designed to protect wellhead equipment from icebergs, and which typically contains multiple wellheads.
Reservoir is a porous and permeable subsurface rock formation that contains a separate accumulation of petroleum that is confined by impermeable rock or water barriers and is characterized by a single pressure system.
Wells:
Development wells are drilled inside the established limits of an oil or gas reservoir, or in close proximity to the edge of the reservoir, to the depth of a stratigraphic horizon known to be productive.
Dry wells are exploratory or development wells found to be incapable of producing either oil or gas in sufficient quantities to justify the completion as an oil or gas well.
Exploratory wells are drilled in a territory without existing proved reserves, with the intention to discover commercial reservoirs or deposits of crude oil and/or natural gas. Exploratory wells include appraisal wells, which are drilled to measure the commercial potential (i.e. size and quality) of a hydrocarbon discovery. Before development, an offshore discovery is likely to need several appraisal wells.
Service wells are drilled or completed for the purpose of supporting production in an existing field, such as wells drilled for observation or wells drilled for the injection of gas or water.
Stratigraphic wells are drilling efforts, geologically directed, to obtain information pertaining to a specific geologic condition, such as core hole drilling on oil sands leases, and are usually drilled without the intention of being completed for production.
Production processes
Capacity is the annual average output that may be achieved from a processing facility, such as an upgrader, refinery or natural gas processing plant, under ideal operating conditions and in accordance with current design specifications.
Downstream refers to the refining of crude oil or synthetic crude oil and the selling and distribution of refined products in retail and wholesale channels.
Feedstock generally refers either to i) the bitumen required in the production of synthetic crude oil for the company's oil sands operations; or ii) crude oil and/or other components required in the production of refined products for the company's downstream operations.
In situ or "in place" refers to methods of extracting bitumen or heavy crude oil from deep deposits of oil sands by means other than surface mining.
Overburden is the material overlying oil sands that must be removed before mining, which consists of muskeg, glacial deposits and sand.
Production Sharing Contracts (PSC) are a common type of contract signed between a government and a resource extraction company that states how much of the resource produced each party will receive and which parties are responsible for the development and operation of the resource. An Exploration and Production Sharing Agreement (EPSA) is a form of Production Sharing Contract, which also states which parties are responsible for exploration activities.
Steam-assisted gravity drainage (SAGD) is an enhanced oil recovery technology for producing heavy crude oil and bitumen. It is an advanced form of steam stimulation in which a pair of horizontal wells are drilled into the oil reservoir, one a
2 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
few metres above the other. Low pressure steam is continuously injected into the upper wellbore to heat the oil and reduce its viscosity, causing the heated oil to drain into the lower wellbore, from which it is pumped out.
Steam-to-oil ratio (SOR) is a metric used to quantify the efficiency of an in situ oil recovery process, which measures the cubic metres of steam required to produce one cubic metre of oil. The lower the ratio, the higher the efficiency of the use of steam.
Utilization is the average use of capacity, and includes the impact of planned and unplanned facility outages and maintenance. More specifically, refinery utilization is the amount of crude oil and natural gas plant liquids run through crude distillation units, expressed as a percentage of the capacity of these units.
Upgrading is the two-stage process by which bitumen or heavy crude oil is converted into synthetic crude oil.
Primary upgrading, also referred to as coking or thermal cracking, heats the bitumen in coke drums to remove excess carbon. The superheated hydrocarbon vapours are sent to fractionators where they condense into naphtha, kerosene and gas oil. Carbon residue, or coke, is removed from the coke drums on short intervals and later sold as a byproduct.
Secondary upgrading, a purification process also referred to as hydrotreating, adds hydrogen to, and reduces the sulphur of, primary upgrading output to create sweet synthetic crude oil and diesel.
Upstream refers to the exploration, development and production of conventional crude oil, bitumen or natural gas.
Reserves and resources
Please refer to the Definitions for Reserves Data Tables section of the Statement of Reserves Data and Other Oil and Gas Information in this AIF.
Common Abbreviations
The following is a list of abbreviations that may be used in this AIF:
Measurement |
Places and Currencies |
|||||
bbl(s) | barrel(s) | U.S. | United States | |||
bbls/d | barrels per day | U.K. | United Kingdom | |||
mbbls/d | thousands of barrels per day | B.C. | British Columbia | |||
mmbbls | millions of barrels | |||||
$ or Cdn$ | Canadian dollars | |||||
boe | barrels of oil equivalent | US$ | United States dollars | |||
boe/d | barrels of oil equivalent per day | £ | Pounds sterling | |||
mboe | thousands of barrels of oil equivalent | € | Euros | |||
mboe/d | thousands of barrels of oil equivalent per day | |||||
mmboe | millions of barrels of oil equivalent | |||||
mcf | thousands of cubic feet of natural gas | Products, Markets and Processes | ||||
mcf/d | thousands of cubic feet of natural gas per day | |||||
mcfe | thousands of cubic feet of natural gas equivalent | WTI | West Texas Intermediate | |||
mmcf | millions of cubic feet of natural gas | WCS | Western Canadian Select | |||
mmcf/d | millions of cubic feet of natural gas per day | NGL(s) | natural gas liquid(s) | |||
mmcfe | millions of cubic feet of natural gas equivalent | LPG | liquefied petroleum gas | |||
mmcfe/d | millions of cubic feet of natural gas equivalent per day | SCO | synthetic crude oil | |||
bcf | billions of cubic feet of natural gas | NYMEX | New York Mercantile Exchange | |||
GJ | gigajoule | TSX | Toronto Stock Exchange | |||
mmbtu | millions of British thermal units | NYSE | New York Stock Exchange | |||
m3 | cubic metres | SAGD | steam-assisted gravity drainage | |||
m3/d | cubic metres per day | PSC | production sharing contract | |||
km | kilometres | EPSA | exploration and production sharing agreement | |||
MW | megawatts |
Suncor converts certain crude oil and NGL volumes to mmcfe or mmcfe/d on the basis of one bbl to six mcf, and certain natural gas volumes to boe, mboe, mmboe or mboe/d on the same basis. Any figure presented in mcfe, mmcfe, mmcfe/d, boe, boe/d, mboe, mmboe or mboe/d may be misleading, particularly if used in isolation. A conversion ratio of one bbl of crude oil or NGL to six mcf of natural gas is based on an energy equivalency conversion method primarily applicable at the burner tip and does not necessarily represent value equivalency at the wellhead. Given that the value ratio based on the current price of crude oil as compared to natural gas is significantly different from the energy equivalency of 6:1, utilizing a conversion on a 6:1 basis may be misleading as an indication of value.
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 3
Conversion Table (1)(2)
1 m3 liquids = 6.29 barrels | 1 tonne = 0.984 tons (long) | |
1 m3 natural gas = 35.49 cubic feet | 1 tonne = 1.102 tons (short) | |
1 m3 overburden = 1.31 cubic yards | 1 kilometre = 0.62 miles | |
1 hectare = 2.5 acres |
CORPORATE STRUCTURE
Name and Incorporation
Suncor Energy Inc. (formerly Suncor Inc.) was originally formed by the amalgamation under the Canada Business Corporations Act on August 22, 1979, of Sun Oil Company Limited, incorporated in 1923, and Great Canadian Oil Sands Limited, incorporated in 1953. On January 1, 1989, we further amalgamated with a wholly owned subsidiary under the Canada Business Corporations Act. We amended our articles in 1995 to move our registered office from Toronto, Ontario, to Calgary, Alberta, and again in April 1997 to adopt our current name, "Suncor Energy Inc.". In April 1997, May 2000, May 2002, and May 2008, we amended our articles to divide the issued and outstanding shares on a two-for-one basis.
Pursuant to an arrangement (the Arrangement), which was completed effective August 1, 2009, Suncor amalgamated with Petro-Canada to form a single corporation continuing under the name "Suncor Energy Inc.". The Arrangement was effected pursuant to section 192 of the Canada Business Corporations Act through an arrangement agreement dated March 22, 2009 and accompanying plan of arrangement, as amended. Under the terms of the Arrangement, Petro-Canada shareholders received 1.28 common shares of the continuing Suncor entity for each Petro-Canada common share held and Suncor shareholders received one common share of the continuing Suncor entity for each common share held.
Our registered and head office is located at 150 - 6th Avenue, S.W., Calgary, Alberta, T2P 3E3.
Intercorporate Relationships
Material subsidiaries, each of which was owned 100%, directly or indirectly, by the company as at December 31, 2011 are as follows:
Name |
Jurisdiction where organized |
Description |
||
---|---|---|---|---|
Canadian operations | ||||
Suncor Energy Oil Sands Limited Partnership |
Canada |
This partnership holds most of the company's oil sands assets. |
||
Suncor Energy Ventures Partnership |
Canada |
This partnership was created in 2011 and holds the company's interest in the Syncrude joint venture. |
||
Suncor Energy Products Partnership |
Canada |
This partnership holds substantially all of the company's Canadian refining and marketing assets. |
||
Suncor Energy Oil & Gas Partnership |
Canada |
This partnership holds certain upstream Canadian oil and gas assets. |
||
Suncor Energy Joslyn Partnership |
Canada |
This partnership holds our working interest in the Joslyn joint venture. |
||
Suncor Energy Products Inc. |
Canada |
A subsidiary of Suncor Energy Inc. that holds interests in the company's energy marketing and renewable energy businesses, and which is a partner of Suncor Energy Products Partnership. |
||
Suncor Energy Marketing Inc. |
Canada |
A subsidiary of Suncor Energy Products Inc. through which the products produced by our upstream North American businesses are marketed. Through this subsidiary, we also administer Suncor's energy trading activities, market certain third-party products, procure crude oil feedstocks and natural gas for our downstream business, and procure and market NGLs and LPG for our downstream business. |
||
4 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
Name |
Jurisdiction where organized |
Description |
||
---|---|---|---|---|
U.S. operations | ||||
Petro-Canada U.S. Holdings Ltd. |
U.S. |
A subsidiary of Suncor Energy Inc. that holds the majority of our U.S. interests. |
||
Suncor Energy (U.S.A.) Inc. |
U.S. |
A subsidiary of Suncor Energy Inc. through which our U.S. refining and marketing operations are conducted. |
||
International operations |
||||
3908968 Canada Inc. |
Canada |
A subsidiary of Suncor Energy Inc. that holds certain of our international interests. |
||
Suncor Energy UK Holdings Ltd. |
U.K. |
A subsidiary of 3908968 Canada Inc. that holds certain of our U.K. interests. Formerly Petro-Canada U.K. Holdings Limited. |
||
Suncor Energy UK Limited |
U.K. |
A subsidiary of Suncor Energy UK Holdings Ltd. through which certain of our operations are conducted in the U.K. Formerly Petro-Canada U.K. Limited. |
||
Petro-Canada Cooperative Holding U.A. |
The Netherlands |
A subsidiary of 3908968 Canada Inc. that holds certain of our international interests. |
||
Petro-Canada (International) Holdings B.V. |
The Netherlands |
A subsidiary of Petro-Canada Cooperative Holding UA that holds certain of our international interests. |
||
Petro-Canada Palmyra B.V. |
The Netherlands |
A subsidiary of Petro-Canada (International) Holdings BV that holds the majority of our interests in Syria. |
||
Petro-Canada Germany GmbH (1) |
Germany |
A subsidiary of Petro-Canada (International) Holdings BV that holds the majority of our interests in Libya. |
||
Petro-Canada Oil (North Africa) GmbH (2) |
Germany |
A subsidiary of Petro-Canada Germany GmbH through which the majority of our Libya operations are conducted. |
||
Individually, the company's remaining subsidiaries accounted for (i) less than 10% of the company's consolidated assets as at December 31, 2011, and (ii) less than 10% of the company's consolidated sales and operating revenues for the fiscal year ended December 31, 2011. In aggregate, the remaining subsidiaries accounted for less than 20% of each of (i) and (ii) described above.
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 5
GENERAL DEVELOPMENT OF THE BUSINESS
Overview
Suncor is an integrated energy company, with corporate headquarters in Calgary, Alberta, Canada. We are strategically focused on developing one of the world's largest petroleum resource basins Canada's Athabasca oil sands. In addition, we explore for, acquire, develop, produce and market crude oil and natural gas in Canada and internationally, and we transport and refine crude oil, and market petroleum and petrochemical products primarily in Canada. Periodically, we market third-party petroleum products. We also carry on energy trading activities focused principally on the marketing and trading of crude oil, natural gas, refined products and byproducts.
Suncor has classified its operations into the following segments:
OIL SANDS
Suncor's Oil Sands segment, with assets located in northeast Alberta, recovers bitumen from mining and in situ operations and upgrades the majority of this production into refinery feedstock, diesel fuel and byproducts. The Oil Sands segment includes:
EXPLORATION AND PRODUCTION
In January 2011, Suncor combined its International and Offshore and Natural Gas segments into the Exploration and Production segment, which consists of offshore operations off the east coast of Canada and in the North Sea, and onshore operations in North America, Libya and Syria.
Due to recent unrest in both countries, the company has declared force majeure under its contractual obligations in Libya and Syria. Operations in Libya are in the process of restarting, while operations in Syria have been suspended indefinitely.
REFINING AND MARKETING
Suncor's Refining and Marketing segment consists of two primary operations:
6 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
business located in Mississauga, Ontario that manufactures, blends and markets products worldwide. Western North America operations include refineries located in Edmonton, Alberta and Commerce City, Colorado. Other assets include interests in a petrochemical plant, pipelines and product terminals in Canada and the U.S.
CORPORATE, ENERGY TRADING AND ELIMINATIONS
The grouping Corporate, Energy Trading and Eliminations includes the company's investments in renewable energy projects, results related to energy supply and trading activities, and other activities not directly attributable to any other operating segment.
Three-Year History
2009
2010
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 7
North Sea, Trinidad and Tobago, the Scott, Telford and Guillemot areas in the U.K. portion of the North Sea, and numerous natural gas packages in Western Canada. Some of these disposals closed in 2011. Additional disposals of non-core North America Onshore assets representing approximately 5.9 mboe/d of 2010 production occurred in 2011.
2011
8 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
2012
NARRATIVE DESCRIPTION OF SUNCOR'S BUSINESSES
Oil Sands
For a discussion of environmental and other regulatory conditions, and competitive conditions and seasonal impacts affecting our Oil Sands segment, refer to the Industry Conditions and Risk Factors sections of this AIF.
Oil Sands Base Operations
Our integrated Oil Sands Base operations, located near Fort McMurray, Alberta, involve numerous activities:
After overburden is removed, open-pit mining operations use shovels to excavate the oil sands bitumen ore, which is trucked to sizers and breaker units that reduce the size of the ore, then create a slurry of hot water, rock, sand and bitumen. The slurry is delivered via a hydrotransport pipeline to extraction plants. The raw bitumen is separated from the slurry using a hot water process that creates a bitumen froth. Naphtha is added to the bitumen froth to form a diluted bitumen, which is subsequently sent to a centrifuge plant that removes most of the remaining impurities and minerals.
After the diluted bitumen is transferred to upgrading facilities, the naphtha is removed and recycled to be used again as diluent. Bitumen is upgraded through a coking and distillation process. The upgraded product, referred to as sour SCO, is either sold directly to customers or upgraded further into sweet SCO by removing sulphur and nitrogen using a hydrotreating process. In addition to sweet and sour SCO, upgrading processes also produce diesel, naphtha, kerosene and gas oil.
Process water is used in extraction processes and then recycled. Steam and electricity are generated through facilities on site. Steam required for operations is generated by a cogeneration unit or coke-fired boilers. Electricity is generated by turbine generators, some of which are part of the cogeneration unit. Excess energy produced is sold back to the power grid; however, during peak periods, Suncor purchases additional electricity from the grid.
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 9
In the normal course of our operations, we regularly conduct planned maintenance events at our facilities. Large planned maintenance events, which require units to be taken offline to be completed, are often referred to as turnarounds. Turnaround maintenance provides opportunities for both preventive maintenance and capital replacement, which are expected to improve reliability and operational efficiency. Planned maintenance events generally occur on routine cycles, determined by historical operating performance, recommended usage factors or regulatory requirements. A turnaround typically involves shutting down the unit, inspecting it for wear or other damage, repairing or replacing components, and then restarting the unit.
Mining processes disturb areas of land that must be reclaimed. Land reclamation activities involve monitoring soil salvage and replacement, wetlands research, fish, waterfowl and other wildlife protection, and re-vegetation.
The extraction process produces tailings that are a mixture of water, clay, sand and residual bitumen. Suncor has developed a new tailings management approach, known as TROTM, which involves converting tailings more rapidly into a solid landscape suitable for reclamation. In this process, mature fine tailings are mixed with a polymer flocculent and then deposited in thin layers on shallow slopes. The resulting product is a dry material that is capable of being reclaimed in place or moved to another location for final reclamation. The new process is expected to eliminate the need for new tailings ponds at existing mining operations, improve tailings management going forward and, in the years ahead, reduce the number of tailings ponds presently in operation.
Oil Sands Base Assets
Mining and Extraction
Suncor pioneered the commercial development of the Athabasca oil sands beginning in 1962. The original mining area is essentially depleted, and, for several years, bitumen has been mined almost exclusively from the Millennium area, which began production in 2001. During 2011, the company mined approximately 160 million tonnes from Millennium, and started mining ore from the NSE.
Suncor currently operates two extraction plants, the second of which was brought into service during 2009. The original extraction plant on the west side of the Athabasca River is operated only as required to support reclamation activities. During 2011, Suncor averaged processing 289,000 bbls/d of mined bitumen ore in its extraction facilities.
Upgrading
Suncor's upgrading facilities consist of two upgraders Upgrader 1, which has a primary upgrading capacity of 110,000 bbls/d of SCO, and Upgrader 2, which has a primary upgrading capacity of 240,000 bbls/d of SCO. When the MNU is fully commissioned, Suncor's secondary upgrading facilities will consist of three hydrogen plants, three naphtha hydrotreaters, two gas oil hydrotreaters and two diesel hydrotreaters.
During 2011, Suncor averaged 279,700 bbls/d of upgraded bitumen (SCO) production and an additional 25,000 bbls/d of non-upgraded bitumen production (2010 251,400 bbls/d upgraded, 31,600 bbls/d non-upgraded).
Other Mining Leases
Suncor owns several other oil sands leases, including those known as Voyageur South and Audet, which it believes can be developed using mining techniques and on which it undertakes modest exploratory drilling programs on a year-to-year basis.
In Situ Operations
Suncor's In Situ operations, Firebag and MacKay River, use SAGD technology to separate bitumen from oil sands deposits that are too deep to be mined economically and primarily provide additional bitumen to Oil Sands Base upgrading facilities.
The SAGD process drills pairs of horizontal wells with one located above the other. To help reduce land disturbance and improve cost efficiency, well pairs are drilled from central multi-well pads. Steam is injected into the upper well to create a high-temperature steam chamber underground. This process reduces the viscosity of the thick bitumen, allowing heated bitumen and condensed steam to drain into the bottom well and flow up to the surface aided by subsurface pumps or circulating gas. Typically, it takes 18 to 24 months for the steam chamber to reach conditions that support peak production levels.
10 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
The bitumen and water mixture is pumped to separation units at central processing facilities, where the water is removed from the bitumen, treated and recycled for use in steam generation. To facilitate transportation of viscous bitumen, In Situ operations add diluent (naphtha) or use an insulated (referred to as "hot") bitumen pipeline.
Gas vapours recovered at central processing facilities are treated and used as fuel to power Once Through Steam Generators. Cogeneration units are energy efficient systems, which use natural gas combustion to power turbines that generate electricity and steam.
Central processing facilities, steam generation units and well pads are all subject to routine inspection and maintenance cycles.
SAGD production volumes are impacted by reservoir quality and the capacity of central processing facilities and steam generation units to process liquids and generate steam. As with conventional oil and gas properties, SAGD wells will experience natural production declines after several years. Suncor strives to maintain bitumen supply by drilling new wells from existing well pads or by developing new well pads.
Suncor is involved in numerous pilot projects, both operated and non-operated. These pilot projects evaluate potential enhancements to existing SAGD operations or potential new technologies targeted at improving capital efficiency and lowering SORs.
In Situ Assets
Firebag
Initial development of Suncor's Firebag operations included two well pads, each with ten well pairs, and central processing facilities for each of Firebag Stage 1 and Stage 2, with production commencing in 2004 and 2006, respectively. A cogeneration unit was added in 2007. The combined processing capacity of these initial Firebag operations was approximately 95,000 bbls/d of bitumen at design SORs of 2.0 to 2.5; however, actual SORs for Firebag have been higher than the design specifications, largely due to geological heterogeneity (inconsistent quality throughout the reservoir). Prior to first oil from the Stage 3 expansion, production averaged between 50,000 to 60,000 bbls/d for 2010 and 2011. As at December 31, 2011, the cumulative SOR at Firebag was 3.3. As production from the Stage 3 expansion increases, the Firebag SOR is expected to decrease.
During 2011, the company completed its Firebag Stage 3 expansion, which added three well pads, two cogeneration units and a central processing facility. Commissioning of the cogeneration units is expected to be completed in the first quarter of 2012. The Firebag Stage 4 expansion, scheduled for completion during 2013, includes two well pads, an additional central processing facility and two more cogeneration units. The design capacity for both of the Stage 3 and Stage 4 expansions is 62,500 bbls/d of bitumen. Actual production may vary from this capacity based on steaming and ramp-up periods, scheduled and unscheduled maintenance, reservoir conditions and other factors. Suncor designed the Stage 3 and Stage 4 expansions with the goal of integrating the entire Firebag operation. Steam and electricity generated at one facility or unit can be used at any well pad. Central processing facilities have been designed to be flexible as to which well pads supply bitumen.
Suncor has received regulatory approval for further expansion of Firebag beyond Stage 4 for an aggregate of 368,000 bbls/d of bitumen.
During 2011, Firebag operations averaged production of 59,500 bbls/d of bitumen (2010 53,600 bbls/d), approximately 90% of which was upgraded by Oil Sands Base operations.
MacKay River
Production from MacKay River commenced in 2002 from two well pads with 25 well pairs, and subsequent expansion phases added four more well pads with 31 producing well pairs. Starting in June 2011, a new phase of 22 well pairs was initiated, with production coming on-stream in the fourth quarter of 2011 and continuing to build throughout 2012. Central processing facilities have a nameplate capacity of approximately 30,000 bbls/d of bitumen. A third party owns and operates the on-site cogeneration unit in return for a fee and natural gas fuel being purchased by Suncor. As at December 31, 2011, the cumulative SOR at MacKay River was 2.5.
Suncor has regulatory approval for 73,000 bbls/d of bitumen production from MacKay River and is currently evaluating an expansion to add a second central processing facility. Suncor has approval to include its Dover properties in the MacKay River project area, and has submitted an application to develop a portion of these lands.
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 11
During 2011, MacKay River operations averaged production of 30,000 bbls/d of bitumen (2010 31,500 bbls/d), approximately 30% of which was upgraded by Oil Sands Base operations.
Other In Situ Leases
Suncor owns several other oil sands leases, including those known as Meadow Creek, Lewis, Chard and Kirby, which it believes can be developed using in situ techniques, and on which it may undertake modest exploratory drilling programs on a year-to-year basis.
Oil Sands Ventures Assets and Operations
Syncrude
Suncor holds a 12% interest in the Syncrude joint venture, also located near Fort McMurray, which includes operations at the Mildred Lake North and Aurora North oil sands mines. Syncrude also has regulatory approval to develop the Aurora South oil sands mining leases.
Syncrude began producing in 1978 and is operated by Syncrude Canada Ltd. (SCL). In 2006, SCL entered into a comprehensive management services agreement with Imperial Oil Resources (Imperial Oil) to provide operational, technical and business management services. This agreement has an initial term of ten years and includes renewal provisions.
Syncrude mining operations use truck, shovel and hydrotransport systems, similar to those at Oil Sands Base. Extraction and upgrading technologies at Syncrude are also similar to those used at Oil Sands Base, except that Syncrude uses a fluid coking process that involves the continuous thermal cracking of the heaviest hydrocarbons, as opposed to a delayed coking process. At Mildred Lake, electricity is provided by a utility plant fuelled by off-gas from upgrading operations and natural gas. At Aurora North, Syncrude operates two 80-MW gas turbine power plants. The gross design capacity for Syncrude facilities is approximately 375,000 bbls/d, but when allowances are made for scheduled and unscheduled downtime the gross productive capacity of the facilities is approximately 350,000 bbls/d.
Syncrude primarily produces a single sweet synthetic light crude product. Marketing of this product is the responsibility of the individual joint venture owners.
Land reclamation activities are similar to those at Oil Sands Base; however, tailings management processes are different. Syncrude's ERCB-approved tailings plan uses the following: freshwater capping, a composite tails mixture of fine tails and gypsum, and plans for centrifuge technology that separates water from tailings.
In 2011, Suncor's share of Syncrude production averaged 34,600 bbls/d (2010 35,200 bbls/d).
Voyageur Upgrader, Fort Hills and Joslyn
Oil Sands Ventures also includes assets important to Suncor's long-term growth strategy. During the first quarter of 2011, Suncor completed transactions with Total E&P, which brought Total E&P into the Voyageur upgrader project, increased their working interest in the Fort Hills oil sands mining project and brought Suncor into the Joslyn oil sands mining project.
12 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
engaged in activities such as remobilizing personnel and assessing the condition of assets. Preliminary design plans are for 200,000 bbls/d (gross) of upgrading capacity.
The development of each of these projects is still subject to approval by Suncor's Board of Directors and the joint venture owners for each respective project.
Sales of Principal Products
Primary markets for SCO and bitumen production from Suncor's Oil Sands segment, which is sold to and subsequently marketed by Suncor's Energy Trading business, include refining operations in Alberta, Ontario, the U.S. Midwest and the U.S. Rocky Mountain regions. Diesel production from upgrading operations is sold primarily in Western Canada, marketed by Suncor's Refining and Marketing business.
For bitumen production from In Situ operations, Suncor's marketing strategy allows it to take advantage of changes in market conditions by either: a) upgrading the bitumen directly at our Oil Sands Base facilities; b) upgrading the bitumen at Suncor's refineries; or c) selling diluted bitumen directly to third parties. Direct bitumen sales may also be required during outages of upgrading facilities or interruptions in pipeline systems. During 2011, 73% (2010 63%) of In Situ bitumen production was processed by Oil Sands Base upgrading facilities.
In 2011, sales of light sweet SCO and diesel represented 44% and sales of light sour SCO and bitumen represented 45% of total Oil Sands segment operating revenues. There were no individual customers that represented 10% or more of Suncor's consolidated revenues in 2011 or 2010.
Operating revenues include sales of non-proprietary volumes purchased from third parties. These volumes are typically transacted when Oil Sands Base or third-party refinery capacities are constrained, in conjunction with a corresponding sales agreement, which allow Suncor and the third party to optimize their logistics. These volumes may also include purchases of third-party diluent to support sales of bitumen, required when the company is unable to meet diluent demands internally.
Information on average daily sales volumes and the corresponding percentage of Oil Sands segment operating revenues by product for each of the last two years are as follows:
Sales Volumes and Operating Revenues Principal Products | 2011 |
2010 |
|||||||
mbbls/d | % operating revenues |
mbbls/d | % operating revenues |
||||||
Light sweet SCO and diesel (including Syncrude) | 144.4 | 44 | 137.9 | 43 | |||||
Light sour SCO and bitumen | 194.6 | 45 | 176.6 | 46 | |||||
Non-proprietary, byproducts and other operating revenues | n/a | 11 | n/a | 11 | |||||
339.0 | 314.5 | ||||||||
In the normal course of business, Suncor enters into long-term strategic supply agreements for its proprietary sour SCO, which contain varying terms with respect to pricing, volume, expiry and terminations.
Distribution of Products
Production from Oil Sands Base operations is gathered from our Fort McMurray facilities at the Athabasca Terminal, which is operated by Enbridge Inc. (Enbridge). Suncor has various arrangements with Enbridge at this facility to store SCO, diluted bitumen and diesel. Production from Firebag is transported to the Athabasca Terminal via a pipeline that is operated by Suncor, while production from MacKay River is transported to the Athabasca Terminal via an insulated pipeline.
Product moves from the Athabasca Terminal in the following ways:
From Hardisty, where Suncor has storage capacity under contract, Suncor has various options for delivering product to customers:
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 13
Natural gas is used in the production of SCO, particularly in our SAGD operations. Natural gas is delivered to Oil Sands Base and In Situ facilities via the Nova Gas Transmission Limited (NGTL) regulated pipeline system. Suncor also transports natural gas to our Oil Sands Base facilities on the company-owned and operated Albersun Pipeline, which has a capacity of 46 mmcf/d and extends approximately 300 km south of the Oil Sands Base facilities and is connected to the NGTL.
Oil Sands Base facilities are readily accessible by public road. MacKay River facilities are accessible by a combination of public and private roads. Firebag facilities are currently accessible by air and private road. In 2010, the East Athabasca Highway was constructed to provide access to the Firebag site. This highway is owned by Suncor, Husky Energy Inc. and Imperial Oil Ltd., and was constructed to provide each company with access to its oil sands operations in the area.
Royalty Agreements
New oil sands projects are subject to the New Royalty Framework issued by the Government of Alberta, and regulated by the Oil Sands Royalty Regulation 2009 (OSRR 2009), and supporting regulations, which were approved on December 10, 2008.
In 2011, Oil Sands royalties (excluding Syncrude) were approximately 7% (2010 7%) of Oil Sands operating revenues before royalties, and excluding non-proprietary sales and sales of byproducts. In 2011, Suncor incurred royalties on Syncrude operations averaging approximately 8% of Syncrude gross revenue (2010 9%).
Oil Sands Base and Syncrude
As part of the New Royalty Framework, Suncor negotiated and entered into the Suncor Royalty Amending Agreement (Suncor RAA) with the Government of Alberta in January 2008 for royalties pertaining to its Oil Sands Base operations. Prior to the New Royalty Framework, Suncor exercised its option to transition to a bitumen-based royalty from an SCO-based royalty, which became effective January 1, 2009. Royalty rates for 2009 remained at 25% of net revenue. For the period from January 1, 2010 to December 31, 2015, royalty rates are based on a sliding scale (depending on the Canadian dollar equivalent for WTI) from 25% to 30% of R-C (Revenue-Cost), where R is gross revenues, net of bitumen quality adjustments and transportation costs, and C is allowable costs including allowable capital expenditures, which excludes substantially all operating and capital expenditures associated with upgrading facilities. The minimum royalty rate is 1.0% to 1.2% of R. In 2011 and 2010, Suncor incurred royalties on Oil Sands Base mining operations at a rate of 30% of R-C because of high prices for WTI.
In November 2008, the Alberta government and the joint owners of the Syncrude joint venture reached an agreement for the implementation of the New Royalty Framework for the Syncrude project (similar to the Suncor RAA). Under the new terms, Syncrude would continue paying the greater of 1% gross revenue, or 25% of net revenue, until the end of 2015. For 2011, the royalty rate was 25% of net revenue. As part of its agreement, Syncrude also exercised its option to transition to a bitumen-based royalty from an SCO-based royalty. As such, the upgrader facility at the Syncrude project is no longer considered a part of the royalty project. The Syncrude joint venture owners agreed to pay an additional royalty of $975 million over a six-year period starting in 2010, which is contingent on achieving certain production levels.
As part of the implementation of the New Royalty Framework, the Alberta government enacted new Bitumen Valuation Methodology (BVM) regulations effective January 1, 2009. These interim BVM regulations determine the valuation of bitumen for 2009 to 2011. Final regulations to establish the BVM calculation for future years are still to be developed by the Crown. For the year 2009, Suncor filed a non-compliance notice with the Crown, citing that reasonable adjustments were not considered by the Crown in the determination of bitumen value as permitted by the Suncor RAA. In December 2010, the Minister of Energy notified Suncor of a modification to the Suncor BVM, permitting adjustments for bitumen quality and transportation. Suncor filed its second non-compliance notice with the Crown, for the years 2009 and 2010, related to the quality adjustment made by the Minister, which Suncor believes is not reasonable. Pursuant to the OSRR 2009, Suncor provided replacement royalty reports for 2009 and 2010 and remitted, under protest, the balance of royalty payable at the end of January 2011. For 2011, Suncor continued to remit royalty payments based on its view of reasonable quality adjustments; however, royalty expense was calculated based on the Minister's quality adjustment. The Suncor RAA provides for an arbitration procedure failing settlement of these issues. Suncor filed a Notice of Commencement of Arbitration with the Crown on January 29, 2011.
The joint venture owners of Syncrude have also filed a non-compliance notice with the Crown, citing that reasonable adjustments in the determination of the bitumen value were not considered by the Crown, similar to the notice filed by Suncor in respect of the Suncor RAA.
Beginning on January 1, 2016, Suncor's Oil Sands Base and Syncrude operations will be subject to the generic royalty regime under OSRR 2009 that is currently in place for all other oil sands royalty projects in Alberta, including Suncor's In Situ operations, as described below.
14 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
Under the New Royalty Framework, royalties on Suncor's Firebag and MacKay River projects are based on a sliding-scale rate of 25% to 40% of R-C, subject to a minimum royalty of 1% to 9% of R, depending on oil prices for WTI from Cdn$55/bbl to the maximum rate at a WTI price of Cdn$120/bbl. A project remains subject to the minimum royalty (the pre-payout phase) until the project's cumulative gross revenue exceeds its cumulative costs, including an annual investment allowance (the post-payout phase). In 2011, Suncor incurred royalties at a rate of 34% of R-C for MacKay River, which reached the post-payout phase in November 2010, and royalties averaging 6% of R for Firebag, which continues in the pre-payout phase.
Exploration and Production
For a discussion of the environmental and other regulatory conditions, competitive conditions, foreign operations and seasonal impacts affecting our Exploration and Production segment, refer to the Industry Conditions and Risk Factors sections of this AIF.
East Coast Canada Assets and Operations
Based in St. John's, Newfoundland and Labrador, this business focuses on high-volume production from three existing fields, interests in future developments and expansions, and exploration drilling for new opportunities. Suncor holds a unique position as the only company with interests in all current producing fields.
Terra Nova
The Terra Nova oilfield is approximately 350 km southeast of St. John's, Newfoundland. Terra Nova was discovered by Petro-Canada in 1984, and was the second oilfield to be developed offshore Newfoundland and Labrador. Operated by Suncor, the production system uses a Floating Production, Storage and Offloading (FPSO) vessel that is moored on location, and has gross production capacity of 180,000 bbls/d and oil storage capacity of 960,000 bbls. Terra Nova was the first harsh environment development in North America to use a FPSO vessel. Actual production levels are lower than production capacity, reflecting current reservoir capability. Production from Terra Nova began in January 2002. At December 31, 2011, there were 28 wells in operation: 16 oil wells, nine water injection wells and three gas injection wells. Two of the oil wells have been shut in due to hydrogen sulphide (H2S) flow line restrictions. In 2011, Suncor's share of Terra Nova production averaged 16,200 bbls/d (2010 23,200 bbls/d).
H2S was detected in several oil wells in the fourth quarter of 2010. Wells and facilities directly and indirectly impacted by H2S have been shut in while the company implements its mitigation plan to safely address the situation. In the fourth quarter of 2011, the company replaced a flow line that has remediated some of the H2S issues. Remaining H2S remediation is anticipated to be completed as part of the dockside maintenance program scheduled to commence in the third quarter of 2012. The dockside maintenance program also includes replacement of the FPSO swivel.
In December 2010, the joint venture owners of the Terra Nova oilfield finalized the redetermination of working interests required under the Terra Nova Development and Operating Agreement following field payout on February 1, 2005. As a result, Suncor's working interest increased to 37.675% from 33.990% effective January 1, 2011.
Field production is transported by shuttle tanker from the FPSO and either delivered directly to customers (if tanker schedules permit) or to the Newfoundland transshipment terminal in Placentia Bay, where it is subsequently loaded onto tankers for transport to markets in Eastern Canada or the U.S. Suncor has a 14% ownership interest in the transshipment facility and is part of a group of companies that share the operation of marine transportation assets for East Coast Canada.
Hibernia and the Hibernia Southern Extension Unit (HSEU)
The Hibernia oilfield, encompassing the Hibernia and Ben Nevis Avalon reservoirs, is approximately 315 km southeast of St. John's and was the first field to be developed in the Jeanne d'Arc Basin. Operated by Hibernia Management and Development Company Ltd., the production system is a fixed gravity base structure (GBS) that sits on the ocean floor, and has gross production capacity of 230,000 bbls/d and oil storage capacity of 1.3 mmbbls. Actual production levels are lower, reflecting current reservoir capability and natural declines. Hibernia commenced production in November 1997. At December 31, 2011, there were 64 wells in operation: 35 oil wells, 23 water injection wells and six gas injection. In 2011, Suncor's share of Hibernia production averaged 30,900 bbls/d (2010 30,900 bbls/d). Hibernia uses the same transshipment terminal and system of shuttle tankers that are used for Terra Nova.
Final fiscal agreements were signed between the Hibernia joint venture owners and the Government of Newfoundland and Labrador in 2010 that established the fiscal, equity and operational principles for the development of the HSEU. During 2011, the first two development wells were completed and are producing oil. Current development plans include drilling up to two additional producing wells and five water injection wells in a subsea, excavated drill centre, known as a glory hole. The number of producing and injection wells required may be revised as the development proceeds and uncertainties about reservoir capability are resolved.
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 15
White Rose and the White Rose Extensions
White Rose, the third oilfield development offshore Newfoundland, is about 350 km southeast of St. John's. Operated by Husky Oil Operations Limited, White Rose uses a FPSO vessel and has gross production capacity of 140,000 bbls/d and oil storage capacity of 940,000 bbls. Production from White Rose began in November 2005. At December 31, 2011, there were 25 wells in operation: twelve oil wells and 13 water injection wells. In 2011, Suncor's share of White Rose production averaged 18,500 bbls/d (2010 14,500 bbls/d). White Rose uses the same transshipment terminal and the same system of shuttle tankers that are used for Hibernia and Terra Nova.
In 2007, the White Rose joint venture owners signed a formal agreement with the Province of Newfoundland and Labrador for the development of the White Rose Extensions, which include the South White Rose Extension, North Amethyst and West White Rose satellite fields. In May 2010, first oil was achieved in North Amethyst, and development drilling is ongoing. Development of the West White Rose Extension will be divided into two stages. The first stage was approved in 2009 and first oil was achieved during the third quarter of 2011 with the completion of the first production well. A water injection well to support this initial production is expected to be completed in the second quarter of 2012. Results of the first stage, combined with other ongoing evaluation, will help define the scope of the second stage.
An extended, 18-week off-station maintenance program is scheduled to commence in the second quarter of 2012 for the White Rose FPSO, primarily to address issues with the FPSO propulsion system.
Hebron
Discovered in 1980, the Hebron oilfield is located 340 km southeast of St. John's. In 2008, the Hebron joint venture owners reached an agreement with the Government of Newfoundland and Labrador on commercial terms allowing development activities to proceed. The project is operated by ExxonMobil Canada Properties.
Development of the Hebron project anticipates the construction of a concrete GBS that supports an integrated topsides deck to be used for production, drilling and accommodations. Development plans include 1.2 mmbbls of oil storage capacity and 52 well slots with a gross oil production capacity of 150,000 bbls/d.
The contract for the front-end engineering and design of topsides, procurement and construction was awarded in September 2010. Initial construction on the GBS began in September 2011 in Newfoundland and Labrador. The decision from the joint venture owners of Hebron to sanction the development of Hebron is anticipated in late 2012, with initial production anticipated in late 2017.
Other Assets
The Ballicatters discovery well, located 22 km northeast of Hibernia, was completed earlier in 2011 and is comprised of gas and oil. Suncor and its partner are currently evaluating potential options to commercialize the discovery.
Suncor continues to pursue opportunities offshore Newfoundland and Labrador. The company holds interests in 48 other significant discovery licences and six other exploration licences offshore Newfoundland and Labrador.
International Assets and Operations
Buzzard North Sea
The Buzzard oilfield is located in the Outer Moray Firth, 95 km northeast of Aberdeen, Scotland. Operated by Nexen Petroleum U.K. Limited, the Buzzard facilities have gross installed production capacity of approximately 220,000 bbls/d of oil and 80 mmcf/d of natural gas. Oil production rates at Buzzard are currently limited to a maximum of approximately 215,000 bbls/d due to restrictions on third-party pipeline systems. Work is ongoing with the pipeline operator to increase the maximum production rate closer to the gross oil production capacity. Buzzard commenced production in January 2007. Buzzard consists of four bridge-linked platforms supporting wellhead facilities, production facilities, living quarters and utilities, and sulphur handling. In 2011, commissioning was completed for the fourth platform, which was installed to remove H2S from oil production from some segments of the field. At December 31, 2011, there were 40 wells in operation: 29 oil and gas wells and 11 water injection wells. In 2011, Suncor's share of Buzzard production averaged 42,900 boe/d (2010 55,500 boe/d).
Crude oil is transported via the third-party operated Forties Pipeline System to the Kinneil terminal in Scotland. Natural gas is transported via the third-party operated Frigg pipeline to the St. Fergus gas terminal in Scotland.
Golden Eagle North Sea
During 2011, the Golden Eagle Area Development received regulatory approval from the U.K. Department of Energy and Climate Change. This development is approximately 70 km from the Aberdeen shore and consists of the unitization of the Pink, Hobby and Golden Eagle discoveries completed from 2007 to 2009. The development plan incorporates a combined production, utilities and accommodation platform, linked to a separate wellhead platform, with an initial gross production rate of 70,000 boe/d (gross) from 20 development wells. The operator, Nexen Petroleum U.K. Limited, estimates that the gross
16 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
development cost will be £2 billion (Cdn$3.3 billion). First production is expected late in 2014 or early 2015. The joint venture owners of Golden Eagle also hold adjacent exploration licences and continue to explore the region.
Beta North Sea
In the Norway portion of the North Sea, Suncor is the operator of the Beta discovery. Suncor has a 65% working interest in this field, which is currently under evaluation. The company completed the first exploration well in early 2010, encountering hydrocarbons. An appraisal well was drilled and tested later in 2010 with positive results. Suncor has secured a rig to drill a third appraisal well, which is scheduled to commence in the second quarter of 2012.
Other Assets North Sea
During 2011, the operator for the PL405 licence (in the Norway portion of the North Sea) in which Suncor has a 30% interest, drilled an exploration well resulting in a discovery, referred to as the Butch prospect. A sidetrack well subsequently drilled at this prospect was abandoned early in 2012, due to well instability, before reaching its intended depth. In the U.K. portion of the North Sea, Suncor, as operator, has secured a rig and expects to drill a joint exploration well for the Romeo joint venture prospect (Block 30/11c). The joint well is to be drilled to comply with work commitments for two adjacent licences, one held by Suncor and its co-venturers, and the other by Total E&P U.K. Limited.
In late 2010 and early 2011, the company disposed of non-core assets in the U.K portion of the North Sea, including its working interests in production from the Guillemot and Scott/Telford areas. Also, in August 2010, the company disposed of non-core assets in the Netherlands portion of the North Sea.
Syria
Located in the Central Syrian Gas Basin, the Ebla project includes all hydrocarbons in the Ash Shaer and Cherrife development areas, which cover more than 300,000 acres. Suncor conducts its Syrian operations pursuant to a PSC, under which the company is a joint owner of the Ebla project with the General Petroleum Corporation (GPC). Under the PSC, the company pays 100% of the development costs and recovers these costs from a 40% share of production after deduction for royalties of 12.5%. This petroleum revenue is referred to as Cost Recovery petroleum. The amount by which Cost Recovery petroleum exceeds recoverable cost is referred to as Excess Cost Recovery petroleum; 50% of this amount is due to the GPC and the remaining 50% is shared between Suncor and the GPC according to a profit-sharing schedule. The Ebla PSC expires in April 2035, but includes a five-year extension subject to GPC approval. First commercial gas production from Ebla was achieved in April 2010 and first oil was achieved in December 2010. In 2011, Suncor's share of production in Syria averaged 17,600 boe/d (2010 11,600 boe/d).
The Ebla development comprises six natural gas producing wells in the Ash Shaer field, a gas gathering and compression station, approximately 80 km of pipeline, and a gas treatment plant. The facility is designed to produce 97 mmcf/d of natural gas, along with related LPG and condensate volumes. Natural gas is delivered into the Syrian national gas grid for domestic consumption. The Ebla development also includes three wells producing crude oil, which is sold to the GPC.
In December 2011, amid continuing unrest in Syria, sanctions were introduced and Suncor declared force majeure under its contractual obligations and suspended its operations in the country. Suncor withdrew its expatriate staff and undertook measures to maintain support for its Syrian employees. Consequently, the company has ceased recording all production and revenue associated with its Syrian assets.
Libya
In Libya, Suncor acts pursuant to several EPSAs that enable Suncor and the Libya National Oil Corporation (NOC) to jointly design and implement the redevelopment of existing fields in the Sirte Basin. Existing reserves are associated with five separate agreements (EPSAs I through V), which contain five primary production fields. Under the EPSAs, the company pays 100% of the exploration costs, 50% of the development and 12% of the operating costs, and recovers these costs from a 12% share of production, also referred to as Cost Recovery. Any petroleum remaining after Cost Recovery is referred to as Excess Petroleum, and is shared between Suncor and the NOC based on a profit-sharing schedule affected by several factors, with Suncor's share of profit ranging from 4% to 12%. The EPSAs expire on December 31, 2032, but include an initial five-year extension through the end of 2037. In 2011, Suncor's share of production in Libya averaged 12,100 bbls/d (2010 35,200 bbls/d). Libya is a member of the Organization of Petroleum Exporting Countries (OPEC) and is subject to quotas that can affect the company's production in Libya.
For most of the period from March to September 2011, the operator for the joint venture, Harouge Oil Operations BV (Harouge) shut in production as a result of political unrest that began earlier in the year. Sanctions prohibiting the purchase of oil from Libya, among other things, were also introduced by many governments. In March 2011, Suncor declared force majeure under its EPSAs. Beginning late in the third quarter of 2011, a new governing authority was formed in Libya and sanctions were lifted. By January 2012, Harouge had successfully restarted production from all major producing fields and work continues to stabilize production levels. Net production exiting December 2011 was approximately 30,000 bbls/d. Suncor remains optimistic about a gradual return to full operations in Libya and is working to remove its ESPAs from force majeure, where possible.
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 17
As a result of the merger, the company assumed the remaining US$500 million obligation for a signature bonus relating to Petro-Canada's ratification of the EPSAs in 2008. As at December 31, 2011, the undiscounted value of Suncor's remaining obligation is US$347 million, payable in several instalments through 2013. In addition, as part of its contractual obligations under the EPSAs, Suncor is the exploration operator and has committed to fully fund an exploration program, at an estimated remaining cost of US$360 million. As at December 31, 2011, Suncor is still under condition of force majeure with respect to its EPSAs and has re-engaged Harouge to discuss current operations and future plans, including contractual obligations.
North America Onshore Assets and Operations
The North America Onshore business includes the assets and operations previously reported under Suncor's Natural Gas segment, which is now part of the Exploration and Production segment. This business explores for, develops and produces natural gas, NGLs, crude oil and byproducts in Western Canada. After the merger with Petro-Canada, this business implemented a strategy with greater emphasis on liquids-rich and unconventional sources, and, as a result, disposed of a number of non-core assets throughout 2010 and 2011.
Given the vast amount of natural gas brought on-stream in North America by recent advances in shale gas technology, coupled with the economic downturn in 2008 and 2009, natural gas producers in North America continue to face relatively low gas prices. In light of this environment, Suncor has implemented a strategy to make its operations in this region more profitable. One component of that strategy involved selling assets that were no longer deemed core to Suncor's business strategy. As market conditions for such divestitures worsened, Suncor has started to focus more on another component of its strategy becoming more profitable in this region, primarily by increasing activity in tight oil projects. The company is also assessing and pursuing activities to grow the unconventional side of its North America Onshore operations.
In 2011, Suncor's share of production from its North America Onshore properties was 388 mmcfe/d (2010 575 mmcfe/d) with approximately 21 mmcfe/d of production in 2011 coming from assets that were disposed throughout the year (2010 143 mmcfe/d). Natural gas represented 92% of production in 2011 (2010 91%), with crude oil and NGL production representing the remainder. North America Onshore also sells sulphur, a byproduct of processing operations.
Operations are primarily focused on multiple geological zones throughout Western Canada. The business is structured with the following asset areas:
Zone / Area | Primary Focus |
2011 mmcfe/d |
|||
Northeast B.C. | Montney, Triassic and Slave Point | 113 | |||
Southeast Alberta | Sweet, dry gas | 70 | |||
Foothills western Alberta, portions of northeast B.C. | Mississippian sour gas | 161 | |||
Plains western Alberta | Cardium oil, Cretaceous gas | 44 | |||
388 | |||||
In addition, Suncor holds assets that could allow the company to eventually explore long-term supply opportunities in northern frontier areas.
Natural gas extracted from the wellhead requires further processing. In Western Canada, Suncor operates several natural gas processing plants, with total licensed capacity of 772 mmcf/d, of which the company's share is 470 mmcf/d. Capacity not utilized by the company's own production is optimized through processing agreements with third-party producers. Suncor also has varying working interests in other natural gas processing plants and field gathering facilities operated by other oil and natural gas companies. The company's aggregate share from such interests is 91.5 mmcf/d of licensed capacity. The following table shows Suncor's working interest ownership and the licensed capacity of operated processing plants as at December 31, 2011.
Suncor Operated Natural Gas Processing Plants | Zone / Area | Working Interest Ownership % |
Gross Licensed Capacity mmcf/d |
Net Licensed Capacity mmcf/d |
|||||
Hanlan Sour | Foothills | 49.86 | 382.0 | 190.5 | |||||
Hanlan Sweet | Foothills | 40.73 | 44.2 | 18.0 | |||||
Ferrier | Plains | 100.00 | 120.0 | 120.0 | |||||
Gilby East | Plains | 100.00 | 52.4 | 52.4 | |||||
Wilson Creek | Plains | 52.17 | 34.6 | 18.1 | |||||
Progress | Northeast B.C. | 38.01 | 42.6 | 16.2 | |||||
Boundary Lake Sour | Northeast B.C. | 50.00 | 46.0 | 23.0 | |||||
Boundary Lake Sweet | Northeast B.C. | 100.00 | 20.0 | 20.0 | |||||
Parkland 1 | Northeast B.C. | 43.98 | 18.1 | 8.0 | |||||
Parkland 2 | Northeast B.C. | 34.75 | 11.7 | 4.1 | |||||
Total | 771.6 | 470.3 | |||||||
18 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
Natural gas production from Alberta is typically sold at the Nova Inventory Transfer point (NIT), which is one of the largest natural gas trading hubs in North America. Natural gas at NIT generally receives a daily or monthly average AECO (Alberta) spot price. Natural gas production from B.C. is typically sold at Station 2, part of the Spectra B.C. transmission system, and receives the Station 2 Gas Daily Index price, but can also be moved on the Alliance Pipeline system to its terminus in Illinois. To provide diversity in access to markets, Suncor holds firm capacity on the Alliance Pipeline system and the TransCanada PipeLines Gas Transmission Northwest Pipeline (GTN). The GTN firm capacity enables Suncor to deliver natural gas to the Pacific Northwest and California markets.
Conventional crude oil production from North America Onshore assets is shipped on pipelines operated by independent pipeline companies. We currently have no pipeline commitments related to the shipment of conventional crude oil. In most sale arrangements, Suncor is responsible for transportation to the point of sale.
Sales of Principal Products
Oil and gas production from East Coast Canada and the North Sea, and substantially all production from North America Onshore, are sold to our Energy Trading business, which then markets the products to customers under direct sale arrangements. Suncor does not typically enter into long-term supply arrangements to sell its production from its Exploration and Production segment. Contracts for these direct sales arrangements are of varied terms, with a majority having terms of one year or less, and incorporate pricing that is generally determined on a daily or monthly basis in relation to a specified market reference price.
In Syria, the company entered into purchase and sale agreements with the Syrian government for all hydrocarbon production from the Ebla project. In Libya, hydrocarbon production is marketed by the Libyan government on behalf of Suncor.
For each of Exploration and Production's operations, and for Exploration and Production in total, the following table provides information on average sales volumes for principal products and the corresponding percentage of operating revenues for 2011 and 2010:
Sales Volumes | 2011 |
2010 |
||||||||
mboe/d | % operating revenues |
mboe/d | % operating revenues |
|||||||
East Coast Canada (1) | ||||||||||
Crude oil | 52.3 | 42 | 54.2 | 29 | ||||||
International |
||||||||||
Crude oil and NGLs | 62.4 | 34 | 111.1 | 46 | ||||||
Natural gas | 14.0 | 4 | 21.5 | 4 | ||||||
North America Onshore |
||||||||||
Crude oil and NGLs | 5.1 | 3 | 8.8 | 4 | ||||||
Natural gas | 59.6 | 8 | 87.0 | 13 | ||||||
Total Exploration and Production | ||||||||||
Crude oil and NGLs | 119.8 | 79 | 174.2 | 79 | ||||||
Natural gas | 73.6 | 12 | 108.5 | 17 | ||||||
Royalty Agreements
East Coast Canada
The Terra Nova royalty consists of a sliding-scale, basic royalty payable throughout the project's life, with two tiers of incremental royalties, which became payable upon the achievement of specified levels of profitability that included an additional return allowance. The basic royalty is now capped at 10% of gross field revenue, based on the project reaching a specified cumulative production level. The tier one royalty is the greater of the basic royalty or 30% of net revenue, and became payable in 2005. Net revenue is gross revenue adjusted for eligible operating and capital costs. The tier two royalty, equal to 12.5% of net revenue, became payable in 2008. During 2011, Terra Nova royalty expense averaged 32% of gross revenue (2010 35%).
The Hibernia royalty agreement for production from the original oilfields and the AA Block consists of a sliding-scale gross royalty, two tiers of incremental royalty, and an additional net profits interest (NPI). The basic royalty is now capped at 5% of gross revenue, as the project has reached a specified cumulative production level. The tier one royalty, which became payable in 2009, is the greater of the gross royalty or 30% of net revenue. The tier two royalty is 12.5% of net revenue, but has not yet been triggered. Production from the AA Block, which commenced in late 2009, attracts an additional super royalty of 12.5% of net revenue. The NPI, which also became payable in 2009, is an additional 10% of net revenue.
Limited production from the HSEU began in 2011. The HSEU has a similar royalty structure (gross, tier one and tier two) to that described above for Hibernia. Currently, Suncor is only subject to a 5% gross royalty. HSEU production will be subject to an additional super royalty that ranges between 2.5% and 7.5% of net revenue, depending on the price for WTI. The HSEU super
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 19
royalty will coincide with the triggering of the tier one net royalty. During 2011, Hibernia (including the HSEU) royalty expense and net profits interest combined to average 37% of gross revenue (2010 38%).
The White Rose royalty for the base project consists of a sliding-scale basic royalty payable throughout the project's life, with two tiers of incremental royalties, which became payable upon the achievement of specified levels of profitability that included an additional return allowance. The basic royalty is now capped at 7.5% of gross field revenue, based on the base project reaching a specified cumulative production level. The tier one royalty is the greater of the basic royalty or 20% of net revenue, and became payable in 2007. Net revenue adjusts gross revenue for eligible operating and capital costs. The tier two royalty, equal to 10% of net revenue, became payable in 2008. The White Rose Extensions royalty is similar to the base project, except that there is a tier three royalty, equal to 6.5% of net revenue, which is payable if WTI is greater than Cdn$50/bbl. None of the tier royalties have been triggered for the White Rose Extensions. During 2011, total White Rose royalty expense averaged 14% of gross revenue (2010 25%).
International
There are no royalties on oil and gas production from the North Sea; however, in the U.K., oil and gas profits are subject to a 62% income tax rate. For operations in Libya and Syria, all government interests, except for income taxes, are presented as royalties.
North America Onshore
Royalties for Suncor's North America Onshore production in Alberta are regulated by the Natural Gas Royalty Regulation 2009, introduced as part of the New Royalty Framework, which came into effect on January 1, 2009, but was later modified by changes that came into effect on January 1, 2011. Royalties for natural gas and conventional oil production are set by a sliding-scale formula ranging from 5% to 36% for natural gas and 0% to 40% for conventional crude oil that is dependent on factors such as well depth, production rate, and the price and quality of natural gas and crude oil. The maximum rates of 36% and 40% for the sliding-scales became effective on January 1, 2011 and were both reduced from 50%. NGLs have royalty rates of 30% for propane and butane and 40% for pentanes.
In response to the drop in commodity prices experienced during the second half of 2008, the provincial government introduced the New Well Royalty Reduction Program with the intent of promoting new drilling. New wells drilled after April 1, 2009 are subject to an initial 5% royalty for the first twelve months of production, subject to a 500 mmcfe or 50 mboe volume cap. After May 1, 2010, new wells that started producing exclusively from shale formations qualify for a maximum 5% royalty on all production for the first 36 months of production, and are not subject to volume caps.
The Alberta government's Natural Gas Deep Drilling Program also provides royalty relief for wells drilled beyond 2000 metres (true vertical depth). The maximum royalty rate for these wells is 5%, which applies for five years after the finished drilling date, and is subject to dollar caps that are determined based on total depth and whether the well is exploratory or developmental.
Operating and capital costs for gathering, compressing and processing facilities, and processing costs on a fee-for-service basis are allowable costs for deduction from gas and natural gas liquids gross royalties payable.
Royalties for Suncor's North America Onshore production in British Columbia are regulated primarily by the Petroleum and Natural Gas Royalty and Freehold Production Tax Regulation. Royalty rates for natural gas production are subject to different formulas based on the date the well was drilled. Wells drilled before June 1998 attract a rate starting at 15%. Wells drilled after June 1998 attract a royalty starting at 9% or 12%, depending on whether wells were completed within five years of the date drilling rights were issued, and are subject to a sliding scale with a maximum royalty rate of 27% as prices increase. Similar to Alberta, royalty programs exist in British Columbia to provide relief for deep drilling, lower production rates, and unique production methods. Royalties on NGLs are assessed at a flat rate of 20% of sales.
Expenses for field gathering, compression and field processing are allowed as cost of services deductions from gross royalties, and royalty clients who use producer-owned processing facilities or distribution systems are also entitled to operating and capital cost deduction for these facilities.
During 2011, royalty expense for North America Onshore production averaged 11% of gross revenue (2010 14%).
Refining and Marketing
For a discussion of the environmental and other regulatory conditions, and competitive conditions and seasonal impacts affecting our Refining and Marketing segment, refer to the Industry Conditions and Risk Factors sections of this AIF.
Operations Refining and Product Supply
Eastern North America
Effective January 1, 2012, the Montreal refinery had a crude oil capacity of 137,000 bbls/d. The observed performance of the refinery, after improvements in reliability and operations, enabled the nameplate capacity to be upwardly revised from the previously reported capacity of 130,000 bbls/d.
20 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
The refinery processes primarily foreign conventional crude oil, with a flexible configuration that allows processing of light, sour and heavy grades of crude oil, as well as intermediate feedstocks. Crude oil is procured from the market on a spot basis or under contracts that can be terminated on short notice. Crude oil for the refinery is largely supplied by the Portland-Montreal Pipeline.
Production yield from the Montreal refinery includes gasoline, distillates, asphalts, heavy fuel oil, petrochemicals and solvents, which are distributed primarily across Quebec and Ontario. The Montreal refinery also produces feedstock for our lubricants plant. Refined products are delivered to distribution terminals in Ontario via the Trans-Northern Pipeline and delivered to customers directly by truck, rail and marine vessel.
The Sarnia refinery has a crude oil capacity of 85,000 bbls/d, processing both SCO supplied by the company's Oil Sands operations and conventional crude oil purchased from third parties on a spot basis or under contracts that can be terminated on short notice. Crude oil is supplied to the Sarnia refinery primarily via the Enbridge pipelines system. Suncor procures conventional crude oil feedstock primarily from Western Canada, but periodically supplements supply with purchases from the U.S. and other countries. Foreign crude oil is delivered to Sarnia via the Enbridge pipeline system from Montreal.
Production yield from the Sarnia refinery includes gasoline, distillates and petrochemicals, which are primarily distributed in Ontario. Refined products are delivered to distribution terminals in Ontario via the Sun-Canadian Pipeline, or delivered to customers directly via marine vessel and rail. The Sarnia refinery also has limited access to pipelines delivering refined product into the U.S.
To meet the demands of Suncor's marketing network in Eastern North America, the company also imports gasoline and distillates from refiners in Europe. Suncor enters into reciprocal exchange arrangements with other refiners in Eastern North America, primarily for gasoline and distillates, as a means of minimizing transportation costs and balancing product availability. Specialty products, such as asphalts and petrochemicals, are also exported to customers in the U.S.
Suncor holds a 51% interest in ParaChem Chemicals L.P. (ParaChem), which owns and operates a petrochemicals plant located adjacent to the Montreal refinery. Feedstock for the plant includes xylene and toluene produced by the Montreal and Sarnia refineries. The plant primarily produces up to 350,000 metric tons per year of paraxylene, which is used by customers to manufacture polyester textiles and plastic bottles. ParaChem also produces benzene, hydrogen and heavy aromatics. Benzene production is delivered back to the Montreal refinery to be marketed with production from that facility.
Suncor's lubricants plant produces specialty lubricants and waxes that are marketed in Canada and internationally. The facility is the largest producer of lubricant base stocks in Canada, with annual base oil production capacity in excess of 900 million litres. Feedstock for the lubricants facility comes from Suncor's Montreal refinery and other purchase contracts.
Western North America
The Edmonton refinery has a crude oil capacity of 135,000 bbls/d and has the potential to run entirely on feedstocks sourced from oil sands and heavy crude oil from Alberta. Feedstock is supplied from Suncor's Oil Sands Base operations, Syncrude operations (including volumes purchased by Suncor from other joint venture owners' share of production) and other producers from the Athabasca and Cold Lake regions of Alberta. The refinery can process directly 35,000 bbls/d of blended feedstock (comprised of 25,000 bbls/d of bitumen and 10,000 bbls/d of diluent) and process 45,000 bbls/d of sour SCO. The refinery can also process 55,000 bbls/d of sweet SCO through its synthetic train. Crude oil is supplied to the refinery via third-party pipelines.
Production yield from the Edmonton refinery includes primarily gasoline and distillates, which are delivered to distribution terminals across Western Canada via the Alberta Products Pipeline, the TransMountain Pipeline and the Enbridge pipeline system, as well as via truck and rail.
Effective January 1, 2012, the Commerce City refinery had a crude oil capacity of 98,000 bbls/d. The observed performance of the refinery, after improvements in reliability and operations, enabled the nameplate capacity to be upwardly revised from the previously reported capacity of 93,000 bbls/d.
The refinery processes primarily conventional crude oil, but also has the capability of processing up to 15,000 bbls/d of sour SCO from Suncor's Oil Sands Base operations. A majority of crude feedstock is supplied from sources in the U.S., primarily the Rocky Mountain region, while the remainder is purchased from Canadian sources. Crude oil purchase contracts have terms ranging from month-to-month to multi-year. Approximately 60% of crude oil supplied to the refinery is transported via pipeline, with the remainder transported via truck.
Production yield from the Commerce City refinery includes primarily gasoline, diesel and asphalt. The majority of the refined products from the refinery are sold to commercial and wholesale customers in Colorado and Wyoming, and a retail network in Colorado. Refined products are distributed by truck, rail, and pipeline.
To support supply and demand balance in the Vancouver area, Suncor imports and exports finished products through its Burrard distribution terminal on the west coast of Canada. Suncor also enters into reciprocal exchange arrangements with other refiners in Western North America as a means of minimizing transportation costs and balancing product availability.
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 21
Refinery Throughputs, Utilizations and Yields
The following table summarizes the crude feedstock and utilizations for Suncor's refineries for the years ended December 31, 2011 and 2010. Refinery utilizations for 2011 include the impacts of planned maintenance events at the Sarnia, Edmonton and Commerce City refineries, and the impacts of a month-long disruption to third-party hydrogen supply at Edmonton.
Average Daily Crude Throughput | Montreal | Sarnia | Edmonton | Commerce City | |||||||||||||
(mbbls/d, except as noted) | 2011 | 2010 | 2011 | 2010 | 2011 | 2010 | 2011 | 2010 | |||||||||
Oil Sands Base sweet synthetic | | | 11.4 | 14.1 | 12.3 | 11.4 | | 0.1 | |||||||||
Oil Sands Base sour synthetic | | | 25.2 | 17.4 | 41.2 | 42.5 | 7.7 | 9.4 | |||||||||
Other synthetic | | | 12.6 | 17.0 | 41.9 | 39.6 | | | |||||||||
East Coast Canada light conventional (1) | 23.0 | 41.5 | | | | | | | |||||||||
Other light conventional | 82.3 | 54.7 | 3.2 | 3.0 | | 2.4 | 67.0 | 72.0 | |||||||||
Sour conventional | 10.2 | 6.4 | 18.6 | 19.3 | | | |||||||||||
Heavy conventional | 15.3 | 19.2 | | | 20.4 | 22.7 | 16.0 | 17.5 | |||||||||
Total | 130.8 | 121.8 | 71.0 | 70.8 | 115.8 | 118.6 | 90.7 | 99.0 | |||||||||
Utilization (2) (%) | 101 | 94 | 83 | 83 | 86 | 88 | 98 | 106 | |||||||||
Refined petroleum production yield mix | Montreal | Sarnia | Edmonton | Commerce City | |||||||||||||
(%) | 2011 | 2010 | 2011 | 2010 | 2011 | 2010 | 2011 | 2010 | |||||||||
Gasoline | 40 | 42 | 44 | 53 | 46 | 42 | 51 | 51 | |||||||||
Distillates | 34 | 32 | 42 | 35 | 50 | 54 | 36 | 36 | |||||||||
Other | 26 | 26 | 14 | 12 | 4 | 4 | 13 | 13 | |||||||||
Distribution Terminals and Pipelines
Suncor owns and operates 13 major refined products terminals across Canada and two product terminals in Colorado. Combined with access to facilities under long-term contractual arrangements with other parties, Suncor's North American assets are sufficient to meet Refining and Marketing's current storage and distribution needs.
Suncor has ownership interests in the following pipelines:
Pipeline | Ownership | Type | Origin | Destinations | |||||
Portland-Montreal Pipeline | 23.8% | Crude oil | Portland, Maine | Montreal, Quebec | |||||
Trans-Northern Pipeline | 33.3% | Refined product | Montreal, Quebec | Ontario Ottawa, Toronto, Oakville |
|||||
Sun-Canadian Pipeline | 55.0% | Refined product | Sarnia, Ontario | Ontario Toronto, London, Hamilton |
|||||
Alberta Products Pipeline | 35.0% | Refined product | Edmonton, Alberta | Calgary, Alberta | |||||
Rocky Mountain Crude Pipeline | 100.0% | Crude oil | Guernsey, Wyoming | Denver, Colorado | |||||
Centennial Pipeline | 100.0% | Crude oil | Guernsey, Wyoming | Cheyenne, Colorado | |||||
Operations Marketing
Suncor's retail service station network operates nationally in Canada under the Petro-CanadaTM brand. As at December 31, 2011, Suncor's branded retail service station network consisted of 1,465 outlets across Canada. Most of Suncor's owned and operated SunocoTM-branded retail sites were re-branded to the Petro-CanadaTM brand in 2010. In addition to marketing through proprietary retail outlets, petroleum product is marketed through independent dealers and joint arrangements. Suncor's network had annual sales of gasoline motor fuels averaging approximately 4.9 million litres per site in 2011 (2010 5.1 million litres per site) and attracted an estimated 18% share (2010 19% share) of the national retail market (based on data available from Statistics Canada for the period from January to August 2011). The decline in market share in 2011 primarily reflects the loss of volume associated with the disposal of numerous retail sites in 2010 as mandated by the Canadian Competition Bureau as a result of the merger.
Suncor's Colorado retail network consists of 44 owned outlets. Suncor has product supply agreements with an additional 195 Shell®-branded sites and 62 Phillips 66®-branded sites in Colorado.
Marketing activities also generate non-petroleum revenues from convenience stores and car washes.
Suncor's wholesale operations sell petroleum products into farm, home heating, paving, small industrial, commercial and truck markets. Through its PETRO-PASS network, Suncor is the leading national marketer to the commercial road transport segment in Canada. Suncor also sells large volumes of petroleum products directly to large industrial and commercial customers and independent marketers.
22 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
The following tables summarize the locations comprising Suncor's retail and wholesale network and the daily sales volumes and corresponding percentages of Refining and Marketing's operating revenues for the years ended December 31, 2011 and 2010.
Locations | As at December 31 | |||||
2011 | 2010 | |||||
Retail Service Stations Canada | ||||||
Petro-CanadaTM-branded | 1 456 | 1 447 | ||||
SunocoTM-branded | 9 | 10 | ||||
1 465 | 1 457 | |||||
Retail Service Stations Colorado | ||||||
Shell®-branded retail service stations | 38 | 37 | ||||
Phillips 66®-branded retail service stations | 6 | 7 | ||||
44 | 44 | |||||
Wholesale Cardlock Sites Canada | ||||||
Petro-CanadaTM-branded cardlock sites (PETRO-PASS) | 245 | 249 | ||||
Sales Volumes | 2011 |
2010 |
||||||||
thousands of m3/d |
% operating revenues |
thousands of m3/d |
% operating revenues |
|||||||
Gasoline (includes motor and aviation gasoline) | ||||||||||
Eastern North America | 20.9 | 22.2 | ||||||||
Western North America | 18.8 | 18.9 | ||||||||
39.7 | 45 | 41.1 | 48 | |||||||
Distillates (includes diesel and heating oils, and aviation jet fuels) | ||||||||||
Eastern North America | 12.8 | 12.4 | ||||||||
Western North America | 17.6 | 18.0 | ||||||||
30.4 | 41 | 30.4 | 37 | |||||||
Other (includes heavy fuel oil, asphalts, lubricants, petrochemicals, other) | ||||||||||
Eastern North America | 9.8 | 10.7 | ||||||||
Western North America | 3.2 | 5.1 | ||||||||
13.0 | 14 | 15.8 | 15 | |||||||
83.1 | 87.3 | |||||||||
Sales volumes for specific products are somewhat impacted by seasonal cycles: gasoline sales are typically higher during the summer driving season; heating oil sales are typically higher during the winter season; diesel sales are typically higher during the drilling season at the beginning of the year in Western Canada, and during agricultural planting and harvest seasons in early spring and late summer, respectively; and asphalt sales are typically higher during the summer construction paving period. Suncor has the flexibility to modify refinery inputs and outputs to match production yields with anticipated product demands.
Sales volumes can also be impacted when refineries undergo planned maintenance events, which reduce production. Suncor is able to partially mitigate this impact through its integrated facilities: the Edmonton refinery and Oil Sands Base upgrading facilities in Western North America, and the Sarnia and Montreal refineries in Eastern North America. In addition, Suncor may purchase refined products from third-party suppliers.
Other Suncor Businesses
Energy Trading
Suncor's Energy Trading business is organized around four main commodity groups crude oil, natural gas, sulphur and petroleum coke. Each commodity group provides value to customers through innovative commodity supply, transportation and pricing solutions. Our customers include mid- to large-sized commercial and industrial consumers, utility companies and energy producers, all of which demand specialized solutions to meet unique energy requirements.
The Energy Trading business supports the company's Oil Sands production by optimizing price realizations, managing inventory levels during unplanned outages at Suncor's facilities and managing the impacts of external market factors, like pipeline disruptions or outages at refining customers. The Energy Trading business has entered into arrangements for other midstream infrastructure, such as pipeline and storage capacity, to optimize delivery of existing and future growth production, while generating trading earnings on select strategies and opportunities.
The Energy Trading business continues to evaluate additional pipeline agreements to support planned increases in production capacity. Until the company completes its Oil Sands growth projects, Suncor's Energy Trading business expects to optimize the capacities associated with existing arrangements.
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 23
Renewable Energy
Suncor's renewable energy interests include a corn-based ethanol facility in southwest Ontario and six wind power projects in operation. Suncor is a Canadian pioneer in wind power with its investments in wind farms, which have a gross generating capacity of 255 MW and reduce carbon dioxide (CO2) emissions by approximately 470,000 tonnes each year, compared with traditional power generation sources. We continue to evaluate new opportunities to build our renewable energy portfolio, and have a number of potential wind power project sites in various stages of evaluation.
Wind Farm | Ownership Interest (%) |
Size (MW) | Turbines | Commissioned | ||||||||
Operated by Suncor | ||||||||||||
Wintering Hills | Drumheller, Alberta | 70.0 | 88 | 55 | 2011 | |||||||
Kent Breeze | Thamesville, Ontario | 100.0 | 20 | 8 | 2011 | |||||||
Non-operated | ||||||||||||
Ripley | Ripley, Ontario | 50.0 | 76 | 38 | 2007 | |||||||
Chin Chute | Taber, Alberta | 33.3 | 30 | 20 | 2006 | |||||||
Magrath | Magrath, Alberta | 33.3 | 30 | 20 | 2004 | |||||||
SunBridge | Gull Lake, Saskatchewan | 50 .0 | 11 | 17 | 2002 | |||||||
Since 2006, Suncor has invested in Canada's emerging biofuels industry. Suncor operates Canada's largest ethanol facility, the St. Clair Ethanol Plant in the Sarnia-Lambton region of Ontario. Our ethanol plant had an original production capacity of 200 million litres per year, which has since doubled with the completion of the plant expansion in January 2011. In 2011, the plant produced 381.5 million litres of ethanol (2010 206.0 million litres).
SUNCOR EMPLOYEES
The following table shows the distribution of employees among our business units and corporate office for the past two years.
As of December 31 | 2011 | 2010 | |||
Oil Sands | 5 464 | 4 753 | |||
Exploration and Production | 768 | 898 | |||
Refining and Marketing | 3 161 | 3 151 | |||
Corporate, Energy Trading and Renewable Energy | 3 633 | 3 274 | |||
Total | 13 026 | 12 076 | |||
Corporate includes employees from our Major Projects group, which supports the business units. In addition to our employees, the company also uses independent contractors to supply a range of services.
Approximately 36% of the company's employees were covered by collective bargaining agreements at the end of 2011. The Communications, Energy and Paperworkers Union (CEP) represented the majority of the company's unionized employees. A collective agreement with CEP Local 707 representing approximately 3,200 Oil Sands employees is in force and expires in May 2013. Collective agreements that will expire in January 2013 are also in place with the CEP for approximately 1,000 employees in the company's refinery, lubricants, natural gas, and terminal operations. A collective agreement with the CEP representing approximately 65 employees for the Terra Nova facility was renewed in 2011 and will expire in September 2013.
A collective agreement with the United Steel Workers Union representing approximately 260 employees at the Commerce City refinery was recently renewed and will expire in January 2015. An independent union, the Suncor Employee Bargaining Association, represents approximately 200 employees at the Sarnia refinery under an agreement that will expire in May 2012.
24 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
Suncor has a Standards of Business Conduct Code (the Code), which applies to Suncor's directors, officers, employees and contractors. The Code requires strict compliance with legal requirements and sets Suncor's standards for the ethical conduct of our business. Topics addressed in the Code include competition, conflict of interest, the protection and proper use of corporate assets and opportunities, confidentiality, disclosure of material information, trading in shares and securities, communications to the public, improper payments, fair dealing in trade relations, and accounting, reporting and business controls. The Code is supported by detailed policy guidance and standards and a Code compliance program, under which every Suncor director, officer, employee and contract worker is required to annually read a summary of the Code and affirm that he or she has reviewed the summary, affirm that he or she understands the requirements of the Code, and provide confirmation of his or her compliance with the Code during the preceding year. Compliance is then reported to the Audit Committee.
Suncor has a Human Rights Policy, which affirms Suncor's responsibility to respect human rights and ensures that Suncor is not complicit in human rights abuses. Suncor is subject to the laws of the countries in which it operates and is committed to complying with all such laws while honouring the spirit of international human rights principles, such as those described in the Universal Declaration of Human Rights and the Voluntary Principles on Security and Human Rights. The policy includes principles committed to a harassment-free and violence-free working environment, which respects the cultures, customs and values of the communities in which we operate. The policy makes it clear that the scope of Suncor's human rights due diligence includes its own operations and, where we can influence our third-party business relationships, the operations of others.
Suncor has a Stakeholder Relations Policy, which reflects Suncor's values and beliefs. The policy provides that Suncor is committed to developing and maintaining positive, meaningful relationships with stakeholders in all of its operating areas and provides Suncor's principles for guiding the development of stakeholder relations (respect, responsibility, transparency, timeliness and mutual benefit). The policy makes it clear that successful stakeholder engagement fosters informed decision-making, resolving issues with timely, cost-effective and mutually beneficial solutions and supporting shared learning.
Suncor has an Aboriginal Affairs Policy, which affirms Suncor's desire to work in collaboration with Canada's Aboriginal People to develop a thriving energy industry that allows Aboriginal communities to be vibrant, diversified and sustainable. The policy provides a consistent approach to the company's relationships with Canada's Aboriginal People and outlines Suncor's responsibilities and commitments, and is intended to guide Suncor's business decisions on a day-to-day basis. Suncor is committed to work closely with Canada's Aboriginal People and communities to build and maintain effective, long-term and mutually beneficial relationships. The policy makes it clear that responsible development takes into account Aboriginal issues and concerns about the effects, positive and negative, of energy development on communities and their traditional and current uses of lands and resources.
Suncor has an Environment, Health and Safety (EH&S) policy, which affirms Suncor's aspirations to be a sustainable energy company by meeting or exceeding the environmental, social and economic expectations of our current and future stakeholders. The policy reflect Suncor's beliefs that our EH&S efforts are complementary and interdependent with our economic and social performance. The policy makes it clear that Suncor management is responsible for ensuring that employees under their direction are competent to manage their EH&S responsibilities and knowledgeable of the hazards and risks associated with their jobs, and that all Suncor employees and contractors are accountable for compliance with relevant acts, codes, regulations, standards and procedures, and for their own personal safety and the safety of their co-workers.
STATEMENT OF RESERVES DATA AND OTHER OIL AND GAS INFORMATION
Date of Statement
The statement of reserves data and other oil and gas information outlined below is dated March 1, 2012, with an effective date of December 31, 2011. The preparation date of the information is as of February 16, 2012.
Disclosure of Reserves Data
As a Canadian issuer, Suncor is subject to the reporting requirements of Canadian securities regulatory authorities, including the reporting of our reserves in accordance with National Instrument 51-101 Standards of Disclosure for Oil and Gas Activities (NI 51-101).
The reserves data set forth in this section of the AIF for Suncor's Mining (includes Oil Sands Base and Syncrude, unless otherwise noted) and In Situ operations is based upon evaluations conducted by GLJ Petroleum Consultants Ltd. (GLJ) with an effective date of December 31, 2011, contained in their reports (the GLJ Reports). The reserves data set forth below for all other reserves, which includes Suncor's interests in its conventional natural gas assets primarily located in Western Canada (North America Onshore), conventional assets offshore Newfoundland and Labrador (East Coast Canada), conventional assets offshore the U.K. (North Sea), and conventional assets in Syria and Libya (collectively, Other International), is based upon evaluations conducted by Sproule Associates Limited or Sproule International Limited (collectively, Sproule) with an effective date of
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 25
December 31, 2011 contained in their reports (the Sproule Reports). Each of GLJ and Sproule (collectively, the Evaluators) are independent qualified reserves evaluators as defined in NI 51-101. All factual data supplied to the Evaluators was accepted as presented. For general interest purposes, GLJ conducted field tours of Suncor's Millennium mine and the Syncrude Aurora North mine. No other field inspections were deemed necessary by the Evaluators.
The reserves data summarizes Suncor's SCO, bitumen, light and medium oil, NGL and natural gas reserves and the net present values of future net revenue for these reserves using forecast prices and costs (unless otherwise indicated) prior to provision for interest, and general and administrative expenses. Net present values of future revenues include the impact of certain abandonment costs. For more information on abandonment costs, see the Future Net Revenues Tables and Notes Abandonment and Reclamation Costs section of this AIF.
Future net revenues are presented on before-tax and after-tax bases. The reserves data conforms to the requirements of NI 51-101. See also the Notes to Reserves Data Tables and the Definitions for Reserves Data Tables discussions presented subsequently in this section of the AIF.
Advisories Future Net Revenues
It should not be assumed that the estimates of future net revenues presented in the tables below represent the fair market value of the reserves. There is no assurance that the forecast prices and costs assumptions will be attained and variances could be material. There is no guarantee that the estimates for SCO, bitumen, light and medium oil, NGL and natural gas reserves provided herein will be recovered. Actual SCO, bitumen, light and medium oil, NGL and natural gas reserves may be greater than or less than the estimates provided herein. Readers should review the definitions and information contained in the Notes to Reserves Data Tables, Definitions for Reserves Data Tables and Notes to Future Net Revenues Tables discussions in conjunction with the following notes and tables.
Significant Factors or Uncertainties Affecting Reserves Data
The evaluation of reserves is a continuous process, one that can be significantly impacted by a variety of internal and external influences. Revisions are often required as a result of newly acquired technical data, technology improvements, or changes in historical performance, pricing, economic conditions, market availability, and regulatory requirements. Additional technical information regarding geology, reservoir properties, reservoir fluid properties and well performance are obtained through seismic programs, drilling programs, updated reservoir performance studies and analysis, and production history, and may result in upward or downward revisions to reserves. Pricing, market availability and economic conditions affect the profitability of reserves exploitation. Depending on the current business environment, higher commodity prices may result in higher reserves by making more projects economically viable and extending their economic life, while lower commodity prices may result in lower reserves, although this generally does not result for assets under Production Sharing Contracts. Regulatory changes, including royalty regimes and environmental regulations, cannot be predicted but may have positive or negative effects on reserves. Future technology improvements would be expected to have a favourable impact on the economics of reserves development and exploitation, and therefore result in an increase to reserves.
While the above factors, and many others, can be considered, certain judgments and assumptions are always required. As new information becomes available, these areas are reviewed and revised accordingly.
In 2011, the company's assets in Syria were impacted by political unrest. As a result of the current situation in Syria, reserves previously reported as proved developed producing and probable developed producing have been reclassified to the respective non-producing categories. In addition, estimated 2012 production from Syria has not been included as reserves, but has been reflected as contingent resources, as current sanctions prohibit Suncor from receiving payment for any production that may occur during the force majeure period.
For more information as to the risks involved when estimating reserves and resources, see the Risk Factors Uncertainty of Reserves and Resources Estimates section in this AIF.
Disclosure of Resources Data
GLJ conducted an independent evaluation of Best Estimate contingent resources volumes for all of Suncor's Mining properties and for Suncor's In Situ properties for which they also evaluated reserves. For Suncor's In Situ properties without attributed reserves, GLJ audited Suncor's internal evaluation of Best Estimate contingent resources volumes. Best Estimate contingent resources for conventional properties were prepared by Suncor's qualified reserves evaluators in accordance with the Canadian Oil and Gas Evaluation (COGE) Handbook. For more information on contingent resources, see the discussion in the Additional Information Relating to Reserves Data Contingent Resources section of this AIF.
26 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
Oil and Gas Reserves Tables and Notes
Summary of Oil and Gas Reserves (1)(2)(3)
as at December 31, 2011
(forecast prices and costs)
SCO |
Bitumen |
Light & Medium Oil |
Natural Gas |
NGLs |
Total |
|||||||||||||||||||||
Gross | Net | Gross | Net | Gross | Net | Gross | Net | Gross | Net | Gross | Net | |||||||||||||||
mmbbls | mmbbls | mmbbls | mmbbls | mmbbls | mmbbls | bcf | bcf | mmbbls | mmbbls | mmboe | mmboe | |||||||||||||||
Proved Developed Producing | ||||||||||||||||||||||||||
Mining | 2 022.5 | 1 722.1 | | | | | | | | | 2 022.5 | 1 722.1 | ||||||||||||||
In Situ | 203.0 | 191.0 | 47.7 | 39.4 | | | | | | | 250.7 | 230.4 | ||||||||||||||
East Coast Canada | | | | | 48.1 | 38.2 | | | | | 48.1 | 38.2 | ||||||||||||||
North America Onshore | | | | | 11.2 | 9.2 | 805.7 | 688.8 | 6.3 | 4.6 | 151.7 | 128.6 | ||||||||||||||
Total Canada | 2 225.5 | 1 913.1 | 47.7 | 39.4 | 59.3 | 47.4 | 805.7 | 688.8 | 6.3 | 4.6 | 2 473.0 | 2 119.3 | ||||||||||||||
North Sea | | | | | 71.5 | 71.5 | 3.3 | 3.3 | 0.3 | 0.3 | 72.3 | 72.3 | ||||||||||||||
Other International | | | | | 96.0 | 35.7 | | | | | 96.0 | 35.7 | ||||||||||||||
Total Proved Developed Producing | 2 225.5 | 1 913.1 | 47.7 | 39.4 | 226.8 | 154.6 | 809.0 | 692.1 | 6.6 | 4.9 | 2 641.3 | 2 227.3 | ||||||||||||||
Proved Developed Non-Producing |
||||||||||||||||||||||||||
Mining | | | | | | | | | | | | | ||||||||||||||
In Situ | | | | | | | | | | | | | ||||||||||||||
East Coast Canada | | | | | | | | | | | | | ||||||||||||||
North America Onshore | | | | | 0.1 | 0.1 | 40.5 | 31.3 | 0.2 | 0.1 | 7.0 | 5.4 | ||||||||||||||
Total Canada | | | | | 0.1 | 0.1 | 40.5 | 31.3 | 0.2 | 0.1 | 7.0 | 5.4 | ||||||||||||||
North Sea | | | | | 21.4 | 21.4 | 1.1 | 1.1 | 0.1 | 0.1 | 21.6 | 21.6 | ||||||||||||||
Other International | | | | | 36.6 | 14.3 | 334.5 | 206.9 | 11.9 | 7.0 | 104.2 | 55.8 | ||||||||||||||
Total Proved Developed Non-Producing | | | | | 58.1 | 35.8 | 376.1 | 239.3 | 12.2 | 7.2 | 132.8 | 82.8 | ||||||||||||||
Proved Undeveloped |
||||||||||||||||||||||||||
Mining | | | | | | | | | | | | | ||||||||||||||
In Situ | 502.0 | 430.0 | 661.1 | 572.4 | | | | | | | 1 163.1 | 1 002.4 | ||||||||||||||
East Coast Canada | | | | | 26.6 | 20.7 | | | | | 26.6 | 20.7 | ||||||||||||||
North America Onshore | | | | | 0.3 | 0.3 | 78.7 | 72.8 | 0.1 | | 13.5 | 12.4 | ||||||||||||||
Total Canada | 502.0 | 430.0 | 661.1 | 572.4 | 26.9 | 21.0 | 78.7 | 72.8 | 0.1 | | 1 203.2 | 1 035.5 | ||||||||||||||
North Sea | | | | | 43.3 | 43.3 | 2.7 | 2.7 | 0.1 | 0.1 | 43.8 | 43.8 | ||||||||||||||
Other International | | | | | 5.8 | 2.4 | | | | | 5.8 | 2.4 | ||||||||||||||
Total Proved Undeveloped | 502.0 | 430.0 | 661.1 | 572.4 | 76.0 | 66.7 | 81.4 | 75.5 | 0.2 | 0.1 | 1 252.8 | 1 081.7 | ||||||||||||||
Proved |
||||||||||||||||||||||||||
Mining | 2 022.5 | 1 722.1 | | | | | | | | | 2 022.5 | 1 722.1 | ||||||||||||||
In Situ | 705.0 | 621.0 | 708.8 | 611.8 | | | | | | | 1 413.8 | 1 232.8 | ||||||||||||||
East Coast Canada | | | | | 74.7 | 58.9 | | | | | 74.7 | 58.9 | ||||||||||||||
North America Onshore | | | | | 11.5 | 9.6 | 924.9 | 792.9 | 6.6 | 4.7 | 172.3 | 146.4 | ||||||||||||||
Total Canada | 2 727.5 | 2 343.1 | 708.8 | 611.8 | 86.2 | 68.5 | 924.9 | 792.9 | 6.6 | 4.7 | 3 683.3 | 3 160.2 | ||||||||||||||
North Sea | | | | | 136.2 | 136.2 | 7.1 | 7.1 | 0.5 | 0.5 | 137.9 | 137.9 | ||||||||||||||
Other International | | | | | 138.4 | 52.4 | 334.5 | 207.1 | 11.9 | 7.0 | 206.1 | 93.9 | ||||||||||||||
Total Proved | 2 727.5 | 2 343.1 | 708.8 | 611.8 | 360.8 | 257.1 | 1 266.5 | 1 007.1 | 19.0 | 12.2 | 4 027.3 | 3 392.0 | ||||||||||||||
Probable |
||||||||||||||||||||||||||
Mining | 552.7 | 478.4 | | | | | | | | | 552.7 | 478.4 | ||||||||||||||
In Situ | 1 271.9 | 1 061.2 | 693.9 | 552.0 | | | | | | | 1 965.8 | 1 613.2 | ||||||||||||||
East Coast Canada | | | | | 275.3 | 201.0 | | | | | 275.3 | 201.0 | ||||||||||||||
North America Onshore | | | | | 5.0 | 4.1 | 320.4 | 262.8 | 2.9 | 2.1 | 61.3 | 50.0 | ||||||||||||||
Total Canada | 1 824.6 | 1 539.6 | 693.9 | 552.0 | 280.3 | 205.1 | 320.4 | 262.8 | 2.9 | 2.1 | 2 855.1 | 2 342.6 | ||||||||||||||
North Sea | | | | | 36.1 | 36.1 | 2.9 | 2.9 | 0.1 | 0.1 | 36.7 | 36.7 | ||||||||||||||
Other International | | | | | 104.9 | 40.3 | 405.5 | 168.8 | 14.5 | 7.0 | 187.0 | 75.4 | ||||||||||||||
Total Probable | 1 824.6 | 1 539.6 | 693.9 | 552.0 | 421.3 | 281.5 | 728.8 | 434.5 | 17.5 | 9.2 | 3 078.8 | 2 454.7 | ||||||||||||||
Proved Plus Probable |
||||||||||||||||||||||||||
Mining | 2 575.2 | 2 200.5 | | | | | | | | | 2 575.2 | 2 200.5 | ||||||||||||||
In Situ | 1 976.9 | 1 682.2 | 1 402.7 | 1 163.8 | | | | | | | 3 379.6 | 2 846.0 | ||||||||||||||
East Coast Canada | | | | | 350.0 | 259.9 | | | | | 350.0 | 259.9 | ||||||||||||||
North America Onshore | | | | | 16.5 | 13.7 | 1 245.3 | 1 055.7 | 9.5 | 6.8 | 233.6 | 196.5 | ||||||||||||||
Total Canada | 4 552.1 | 3 882.7 | 1 402.7 | 1 163.8 | 366.5 | 273.6 | 1 245.3 | 1 055.7 | 9.5 | 6.8 | 6 538.4 | 5 502.9 | ||||||||||||||
North Sea | | | | | 172.3 | 172.3 | 10.0 | 10.0 | 0.6 | 0.6 | 174.5 | 174.5 | ||||||||||||||
Other International | | | | | 243.3 | 92.7 | 740.0 | 375.9 | 26.4 | 14.0 | 393.0 | 169.3 | ||||||||||||||
Total Proved Plus Probable | 4 552.1 | 3 882.7 | 1 402.7 | 1 163.8 | 782.1 | 538.6 | 1 995.3 | 1 441.6 | 36.5 | 21.4 | 7 105.9 | 5 846.7 | ||||||||||||||
Please see Notes (1) through (3) at the end of the reserves data section for important information about volumes in this table.
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 27
Summary of Oil and Gas
Reserves (1)(2)(3)
as at December 31, 2011
(constant prices and costs)
SCO |
Bitumen |
Light & Medium Oil |
Natural Gas |
NGLs |
Total |
|||||||||||||||||||||
Gross | Net | Gross | Net | Gross | Net | Gross | Net | Gross | Net | Gross | Net | |||||||||||||||
mmbbls | mmbbls | mmbbls | mmbbls | mmbbls | mmbbls | bcf | bcf | mmbbls | mmbbls | mmboe | mmboe | |||||||||||||||
Proved Developed Producing | ||||||||||||||||||||||||||
Mining | 2 022.5 | 1 718.2 | | | | | | | | | 2 022.5 | 1 718.2 | ||||||||||||||
In Situ | 202.9 | 194.0 | 47.7 | 40.2 | | | | | | | 250.6 | 234.2 | ||||||||||||||
East Coast Canada | | | | | 48.1 | 37.2 | | | | | 48.1 | 37.2 | ||||||||||||||
North America Onshore | | | | | 11.2 | 9.6 | 731.8 | 640.1 | 6.1 | 4.4 | 139.2 | 120.7 | ||||||||||||||
Total Canada | 2 225.4 | 1 912.2 | 47.7 | 40.2 | 59.3 | 46.8 | 731.8 | 640.1 | 6.1 | 4.4 | 2 460.4 | 2 110.3 | ||||||||||||||
North Sea | | | | | 71.7 | 71.7 | 3.3 | 3.3 | 0.3 | 0.3 | 72.5 | 72.5 | ||||||||||||||
Other International | | | | | 96.3 | 36.4 | | | | | 96.3 | 36.4 | ||||||||||||||
Total Proved Developed Producing | 2 225.4 | 1 912.2 | 47.7 | 40.2 | 227.3 | 154.9 | 735.1 | 643.4 | 6.4 | 4.7 | 2 629.2 | 2 219.2 | ||||||||||||||
Proved Developed Non-Producing |
||||||||||||||||||||||||||
Mining | | | | | | | | | | | | | ||||||||||||||
In Situ | | | | | | | | | | | | | ||||||||||||||
East Coast Canada | | | | | | | | | | | | | ||||||||||||||
North America Onshore | | | | | 0.1 | 0.1 | 18.3 | 14.7 | 0.2 | 0.1 | 3.3 | 2.6 | ||||||||||||||
Total Canada | | | | | 0.1 | 0.1 | 18.3 | 14.7 | 0.2 | 0.1 | 3.3 | 2.6 | ||||||||||||||
North Sea | | | | | 21.7 | 21.7 | 1.1 | 1.1 | 0.1 | 0.1 | 22.0 | 22.0 | ||||||||||||||
Other International | | | | | 36.7 | 14.3 | 338.6 | 199.0 | 12.0 | 6.7 | 105.1 | 54.2 | ||||||||||||||
Total Proved Developed Non-Producing | | | | | 58.5 | 36.1 | 358.0 | 214.8 | 12.3 | 6.9 | 130.4 | 78.8 | ||||||||||||||
Proved Undeveloped |
||||||||||||||||||||||||||
Mining | | | | | | | | | | | | | ||||||||||||||
In Situ | 502.0 | 446.5 | 661.1 | 584.0 | | | | | | | 1 163.1 | 1 030.5 | ||||||||||||||
East Coast Canada | | | | | 26.6 | 20.2 | | | | | 26.6 | 20.2 | ||||||||||||||
North America Onshore | | | | | 0.3 | 0.3 | 11.5 | 10.5 | | | 2.2 | 2.1 | ||||||||||||||
Total Canada | 502.0 | 446.5 | 661.1 | 584.0 | 26.9 | 20.5 | 11.5 | 10.5 | | | 1 191.9 | 1 052.8 | ||||||||||||||
North Sea | | | | | 43.9 | 43.9 | 2.7 | 2.7 | 0.1 | 0.1 | 44.4 | 44.4 | ||||||||||||||
Other International | | | | | 5.8 | 2.4 | | | | | 5.8 | 2.4 | ||||||||||||||
Total Proved Undeveloped | 502.0 | 446.5 | 661.1 | 584.0 | 76.6 | 66.8 | 14.2 | 13.2 | 0.1 | 0.1 | 1 242.1 | 1 099.6 | ||||||||||||||
Proved |
||||||||||||||||||||||||||
Mining | 2 022.5 | 1 718.2 | | | | | | | | | 2 022.5 | 1 718.2 | ||||||||||||||
In Situ | 704.9 | 640.5 | 708.8 | 624.2 | | | | | | | 1 413.7 | 1 264.7 | ||||||||||||||
East Coast Canada | | | | | 74.7 | 57.4 | | | | | 74.7 | 57.4 | ||||||||||||||
North America Onshore | | | | | 11.5 | 10.0 | 761.6 | 665.3 | 6.3 | 4.5 | 144.7 | 125.4 | ||||||||||||||
Total Canada | 2 727.4 | 2 358.7 | 708.8 | 624.2 | 86.2 | 67.4 | 761.6 | 665.3 | 6.3 | 4.5 | 3 655.6 | 3 165.7 | ||||||||||||||
North Sea | | | | | 137.3 | 137.3 | 7.1 | 7.1 | 0.5 | 0.5 | 138.9 | 138.9 | ||||||||||||||
Other International | | | | | 138.8 | 53.1 | 338.6 | 199.0 | 12.0 | 6.7 | 207.3 | 93.0 | ||||||||||||||
Total Proved | 2 727.4 | 2 358.7 | 708.8 | 624.2 | 362.3 | 257.8 | 1 107.3 | 871.4 | 18.8 | 11.7 | 4 001.8 | 3 397.6 | ||||||||||||||
Probable |
||||||||||||||||||||||||||
Mining | 552.7 | 480.0 | | | | | | | | | 552.7 | 480.0 | ||||||||||||||
In Situ | 1 271.9 | 1 114.5 | 693.9 | 566.0 | | | | | | | 1 965.8 | 1 680.5 | ||||||||||||||
East Coast Canada | | | | | 275.3 | 197.1 | | | | | 275.3 | 197.1 | ||||||||||||||
North America Onshore | | | | | 5.0 | 4.3 | 227.4 | 197.1 | 2.3 | 1.6 | 45.2 | 38.8 | ||||||||||||||
Total Canada | 1 824.6 | 1 594.5 | 693.9 | 566.0 | 280.3 | 201.4 | 227.4 | 197.1 | 2.3 | 1.6 | 2 839.0 | 2 396.4 | ||||||||||||||
North Sea | | | | | 35.6 | 35.6 | 2.9 | 2.9 | 0.1 | 0.1 | 36.2 | 36.2 | ||||||||||||||
Other International | | | | | 104.5 | 37.7 | 401.4 | 157.0 | 14.4 | 6.6 | 185.8 | 70.5 | ||||||||||||||
Total Probable | 1 824.6 | 1 594.5 | 693.9 | 566.0 | 420.4 | 274.7 | 631.7 | 357.0 | 16.8 | 8.3 | 3 061.0 | 2 503.1 | ||||||||||||||
Proved Plus Probable |
||||||||||||||||||||||||||
Mining | 2 575.2 | 2 198.2 | | | | | | | | | 2 575.2 | 2 198.2 | ||||||||||||||
In Situ | 1 976.8 | 1 755.0 | 1 402.7 | 1 190.2 | | | | | | | 3 379.5 | 2 945.2 | ||||||||||||||
East Coast Canada | | | | | 350.0 | 254.5 | | | | | 350.0 | 254.5 | ||||||||||||||
North America Onshore | | | | | 16.5 | 14.3 | 989.0 | 862.4 | 8.6 | 6.1 | 189.9 | 164.2 | ||||||||||||||
Total Canada | 4 552.0 | 3 953.2 | 1 402.7 | 1 190.2 | 366.5 | 268.8 | 989.0 | 862.4 | 8.6 | 6.1 | 6 494.6 | 5 562.1 | ||||||||||||||
North Sea | | | | | 172.9 | 172.9 | 10.0 | 10.0 | 0.6 | 0.6 | 175.1 | 175.1 | ||||||||||||||
Other International | | | | | 243.3 | 90.8 | 740.0 | 356.0 | 26.4 | 13.3 | 393.1 | 163.5 | ||||||||||||||
Total Proved Plus Probable | 4 552.0 | 3 953.2 | 1 402.7 | 1 190.2 | 782.7 | 532.5 | 1 739.0 | 1 228.4 | 35.6 | 20.0 | 7 062.8 | 5 900.7 | ||||||||||||||
Please see Notes (1) through (3) at the end of the reserves data section for important information about volumes in this table.
28 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
Reconciliation of Gross Oil
Reserves (1)(2)(3)
as at December 31, 2011
(forecast prices and costs)
SCO |
Bitumen |
Light & Medium Oil |
|||||||||||||||||||
Proved | Probable | Proved Plus Probable |
Proved | Probable | Proved Plus Probable |
Proved | Probable | Proved Plus Probable |
|||||||||||||
mmbbls | mmbbls | mmbbls | mmbbls | mmbbls | mmbbls | mmbbls | mmbbls | mmbbls | |||||||||||||
December 31, 2010 | |||||||||||||||||||||
Mining | 2 084.3 | 541.5 | 2 625.8 | | 36.7 | 36.7 | | | | ||||||||||||
In Situ | 821.6 | 461.5 | 1 283.1 | 397.3 | 1 849.9 | 2 247.2 | | | | ||||||||||||
East Coast Canada | | | | | | | 80.8 | 148.7 | 229.5 | ||||||||||||
North America Onshore | | | | | | | 10.5 | 6.5 | 17.0 | ||||||||||||
Total Canada | 2 905.9 | 1 003.0 | 3 908.9 | 397.3 | 1 886.6 | 2 283.9 | 91.3 | 155.2 | 246.5 | ||||||||||||
North Sea | | | | | | | 117.9 | 57.4 | 175.3 | ||||||||||||
Other International | | | | | | | 140.5 | 100.7 | 241.2 | ||||||||||||
Total | 2 905.9 | 1 003.0 | 3 908.9 | 397.3 | 1 886.6 | 2 283.9 | 349.7 | 313.3 | 663.0 | ||||||||||||
Extensions & Improved Recovery (4) |
|||||||||||||||||||||
Mining | | | | | | | | | | ||||||||||||
In Situ | 93.8 | (93.8 | ) | | 87.1 | (87.1 | ) | | | | | ||||||||||
East Coast Canada | | | | | | | 2.2 | 143.7 | 145.9 | ||||||||||||
North America Onshore | | | | | | | 1.3 | (0.4 | ) | 0.9 | |||||||||||
Total Canada | 93.8 | (93.8 | ) | | 87.1 | (87.1 | ) | | 3.5 | 143.3 | 146.8 | ||||||||||
North Sea | | | | | | | | | | ||||||||||||
Other International | | | | | | | 1.2 | 1.5 | 2.7 | ||||||||||||
Total | 93.8 | (93.8 | ) | | 87.1 | (87.1 | ) | | 4.7 | 144.8 | 149.5 | ||||||||||
Technical Revisions (5) |
|||||||||||||||||||||
Mining | 33.8 | 11.2 | 45.0 | | (36.7 | ) | (36.7 | ) | | | | ||||||||||
In Situ (8) | (191.3 | ) | 904.2 | 712.9 | 233.2 | (1068.9 | ) | (835.7 | ) | | | | |||||||||
East Coast Canada | | | | | | | 15.7 | (17.1 | ) | (1.4 | ) | ||||||||||
North America Onshore | | | | | | | 0.6 | (1.1 | ) | (0.5 | ) | ||||||||||
Total Canada | (157.5 | ) | 915.4 | 757.9 | 233.2 | (1105.6 | ) | (872.4 | ) | 16.3 | (18.2 | ) | (1.9 | ) | |||||||
North Sea | | | | | | | 26.3 | (25.8 | ) | 0.5 | |||||||||||
Other International | | | | | | | 1.8 | 2.8 | 4.6 | ||||||||||||
Total | (157.5 | ) | 915.4 | 757.9 | 233.2 | (1105.6 | ) | (872.4 | ) | 44.4 | (41.2 | ) | 3.2 | ||||||||
Discoveries (6) |
|||||||||||||||||||||
Mining | | | | | | | | | | ||||||||||||
In Situ | | | | | | | | | | ||||||||||||
East Coast Canada | | | | | | | | | | ||||||||||||
North America Onshore | | | | | | | | | | ||||||||||||
Total Canada | | | | | | | | | | ||||||||||||
North Sea | | | | | | | 24.6 | 13.8 | 38.4 | ||||||||||||
Other International | | | | | | | | | | ||||||||||||
Total | | | | | | | 24.6 | 13.8 | 38.4 | ||||||||||||
Please see Notes (1) through (8) at the end of the reserves data section for important information about volumes in this table.
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 29
Reconciliation of Gross Oil
Reserves (1)(2)(3) (continued)
as at December 31, 2011
(forecast prices and costs)
SCO |
Bitumen |
Light & Medium Oil |
|||||||||||||||||||
Proved | Probable | Proved Plus Probable |
Proved | Probable | Proved Plus Probable |
Proved | Probable | Proved Plus Probable |
|||||||||||||
mmbbls | mmbbls | mmbbls | mmbbls | mmbbls | mmbbls | mmbbls | mmbbls | mmbbls | |||||||||||||
Acquisitions | |||||||||||||||||||||
Mining | | | | | | | | | | ||||||||||||
In Situ | | | | | | | | | | ||||||||||||
East Coast Canada | | | | | | | | | | ||||||||||||
North America Onshore | | | | | | | | | | ||||||||||||
Total Canada | | | | | | | | | | ||||||||||||
North Sea | | | | | | | | | | ||||||||||||
Other International | | | | | | | | | | ||||||||||||
Total | | | | | | | | | | ||||||||||||
Dispositions |
|||||||||||||||||||||
Mining | | | | | | | | | | ||||||||||||
In Situ | | | | | | | | | | ||||||||||||
East Coast Canada | | | | | | | | | | ||||||||||||
North America Onshore | | | | | | | | | | ||||||||||||
Total Canada | | | | | | | | | | ||||||||||||
North Sea | | | | | | | (15.7 | ) | (9.4 | ) | (25.1 | ) | |||||||||
Other International | | | | | | | | | | ||||||||||||
Total | | | | | | | (15.7 | ) | (9.4 | ) | (25.1 | ) | |||||||||
Economic Factors (7) |
|||||||||||||||||||||
Mining | | | | | | | | | | ||||||||||||
In Situ | | | | | | | | | | ||||||||||||
East Coast Canada | | | | | | | | | | ||||||||||||
North America Onshore | | | | | | | | | | ||||||||||||
Total Canada | | | | | | | | | | ||||||||||||
North Sea | | | | | | | | | | ||||||||||||
Other International | | | | | | | | | | ||||||||||||
Total | | | | | | | | | | ||||||||||||
Production |
|||||||||||||||||||||
Mining | (95.6 | ) | | (95.6 | ) | | | | | | | ||||||||||
In Situ | (19.2 | ) | | (19.2 | ) | (8.8 | ) | | (8.8 | ) | | | | ||||||||
East Coast Canada | | | | | | | (24.0 | ) | | (24.0 | ) | ||||||||||
North America Onshore | | | | | | | (0.9 | ) | | (0.9 | ) | ||||||||||
Total Canada | (114.8 | ) | | (114.8 | ) | (8.8 | ) | | (8.8 | ) | (24.9 | ) | | (24.9 | ) | ||||||
North Sea | | | | | | | (16.9 | ) | | (16.9 | ) | ||||||||||
Other International | | | | | | | (5.1 | ) | | (5.1 | ) | ||||||||||
Total | (114.8 | ) | | (114.8 | ) | (8.8 | ) | | (8.8 | ) | (46.9 | ) | | (46.9 | ) | ||||||
December 31, 2011 |
|||||||||||||||||||||
Mining | 2 022.5 | 552.7 | 2 575.2 | | | | | | | ||||||||||||
In Situ | 704.9 | 1 271.9 | 1 976.8 | 708.8 | 693.9 | 1 402.7 | | | | ||||||||||||
East Coast Canada | | | | | | | 74.7 | 275.3 | 350.0 | ||||||||||||
North America Onshore | | | | | | | 11.5 | 5.0 | 16.5 | ||||||||||||
Total Canada | 2 727.4 | 1 824.6 | 4 552.0 | 708.8 | 693.9 | 1 402.7 | 86.2 | 280.3 | 366.5 | ||||||||||||
North Sea | | | | | | | 136.2 | 36.0 | 172.2 | ||||||||||||
Other International | | | | | | | 138.4 | 105.0 | 243.4 | ||||||||||||
Total | 2 727.4 | 1 824.6 | 4 552.0 | 708.8 | 693.9 | 1 402.7 | 360.8 | 421.3 | 782.1 | ||||||||||||
Please see Notes (1) through (8) at the end of the reserves data section for important information about volumes in this table.
30 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
Reconciliation of Natural Gas and NGL
Reserves (1)(2)(3)
as at December 31, 2011
(forecast prices and costs)
Natural Gas |
NGLs |
|||||||||||||
Proved |
Probable |
Proved Plus Probable |
Proved |
Probable |
Proved Plus Probable |
|||||||||
bcf | bcf | bcf | mmbbls | mmbbls | mmbbls | |||||||||
December 31, 2010 | ||||||||||||||
Canada North America Onshore | 1 113.2 | 373.9 | 1 487.1 | 8.0 | 3.4 | 11.4 | ||||||||
North Sea | 11.5 | 4.4 | 15.9 | 0.8 | 0.3 | 1.1 | ||||||||
Other International | 251.1 | 281.1 | 532.2 | 7.9 | 9.2 | 17.1 | ||||||||
Total | 1 375.8 | 659.4 | 2 035.2 | 16.7 | 12.9 | 29.6 | ||||||||
Extensions & Improved Recovery (4) |
||||||||||||||
Canada North America Onshore | 5.1 | 11.1 | 16.2 | 0.1 | | 0.1 | ||||||||
North Sea | | | | | | | ||||||||
Other International | | | | | | | ||||||||
Total | 5.1 | 11.1 | 16.2 | 0.1 | | 0.1 | ||||||||
Technical Revisions (5) |
||||||||||||||
Canada North America Onshore | 41.4 | (1.0 | ) | 40.4 | 0.2 | (0.3 | ) | (0.1 | ) | |||||
North Sea | (0.1 | ) | (2.3 | ) | (2.4 | ) | | (0.2 | ) | (0.2 | ) | |||
Other International | 114.7 | 125.3 | 240.0 | 5.4 | 5.3 | 10.7 | ||||||||
Total | 156.0 | 122.0 | 278.0 | 5.6 | 4.8 | 10.4 | ||||||||
Discoveries (6) |
||||||||||||||
Canada North America Onshore | | | | | | | ||||||||
North Sea | 1.5 | 1.2 | 2.7 | | | | ||||||||
Other International | | | | | | | ||||||||
Total | 1.5 | 1.2 | 2.7 | | | | ||||||||
Acquisitions |
||||||||||||||
Canada North America Onshore | 0.2 | | 0.2 | | | | ||||||||
North Sea | | | | | | | ||||||||
Other International | | | | | | | ||||||||
Total | 0.2 | | 0.2 | | | | ||||||||
Dispositions |
||||||||||||||
Canada North America Onshore | (55.6 | ) | (31.5 | ) | (87.1 | ) | (0.6 | ) | (0.2 | ) | (0.8 | ) | ||
North Sea | (4.0 | ) | (0.4 | ) | (4.4 | ) | (0.2 | ) | | (0.2 | ) | |||
Other International | | | | | | | ||||||||
Total | (59.6 | ) | (31.9 | ) | (91.5 | ) | (0.8 | ) | (0.2 | ) | (1.0 | ) | ||
Economic Factors (7) |
||||||||||||||
Canada North America Onshore | (52.2 | ) | (32.1 | ) | (84.3 | ) | (0.1 | ) | | (0.1 | ) | |||
North Sea | | | | | | | ||||||||
Other International | (2.1 | ) | (0.9 | ) | (3.0 | ) | (0.1 | ) | | (0.1 | ) | |||
Total | (54.3 | ) | (33.0 | ) | (87.3 | ) | (0.2 | ) | | (0.2 | ) | |||
Production |
||||||||||||||
Canada North America Onshore | (127.2 | ) | | (127.2 | ) | (1.0 | ) | | (1.0 | ) | ||||
North Sea | (1.8 | ) | | (1.8 | ) | (0.1 | ) | | (0.1 | ) | ||||
Other International | (29.2 | ) | | (29.2 | ) | (1.3 | ) | | (1.3 | ) | ||||
Total | (158.2 | ) | | (158.2 | ) | (2.4 | ) | | (2.4 | ) | ||||
December 31, 2011 |
||||||||||||||
Canada North America Onshore | 924.9 | 320.4 | 1 245.3 | 6.6 | 2.9 | 9.5 | ||||||||
North Sea | 7.1 | 2.9 | 10.0 | 0.5 | 0.1 | 0.6 | ||||||||
Other International | 334.5 | 405.5 | 740.0 | 11.9 | 14.5 | 26.4 | ||||||||
Total | 1 266.5 | 728.8 | 1 995.3 | 19.0 | 17.5 | 36.5 | ||||||||
Please see Notes (1) through (8) at the end of the reserves data section for important information about volumes in this table.
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 31
Notes to Reserves Data Tables
as at December 31, 2011
Definitions for Reserves Data Tables
In the tables set forth above and elsewhere in this AIF, the following definitions and other notes are applicable:
Gross means:
Net means:
Reserves Categories
The oil, NGL and natural gas reserves estimates presented are based on the definitions and guidelines contained in the COGE Handbook. A summary of those definitions is set forth below. The synthetic crude oil reserves include Suncor's diesel sales volumes.
Reserves are estimated remaining quantities of oil and natural gas and related substances anticipated to be recoverable from known accumulations, as of a given date, based on analysis of drilling, geological, geophysical and engineering data, the use of established technology, and specified economic conditions, which are generally accepted as being reasonable.
Reserves are classified according to the degree of certainty associated with the estimates.
Proved reserves are those reserves that can be estimated with a high degree of certainty to be recoverable. It is likely that the actual remaining quantities recovered will exceed the estimated proved reserves.
Probable reserves are those additional reserves that are less certain to be recovered than proved reserves. It is equally likely that the actual remaining quantities recovered will be greater or less than the sum of the estimated proved plus probable reserves.
Other criteria that must also be met for the categorization of reserves are provided in the COGE Handbook.
32 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
Each of the reserves categories (proved and probable) may be divided into developed and undeveloped categories:
Developed reserves are those reserves that are expected to be recovered (i) from existing wells and installed facilities or, if facilities have not been installed, that would involve a low expenditure (for example, when compared to the cost of drilling a well) to put the reserves on production, or (ii) through installed extraction equipment and infrastructure that is operational at the time of the reserves estimate, if the extraction is by means not involving a well. The developed category may be subdivided into producing and non-producing.
Undeveloped reserves are those reserves expected to be recovered from known accumulations where a significant expenditure (for example, when compared to the cost of drilling a well) is required to render them capable of production. They must fully meet the requirements of the reserves category (proved or probable) to which they are assigned.
In multi-well pools, it may be appropriate to allocate total pool reserves between the developed and undeveloped categories or to subdivide the developed reserves for the pool between developed producing and developed non-producing. This allocation should be based on the evaluator's assessment as to the reserves that will be recovered from specific wells, facilities and completion intervals in the pool and their respective development and production status.
In the economic interest method used for PSCs, the contractor's (i.e. Suncor's) share of profit revenue plus cost recovery revenue is divided by the associated oil or gas price forecast to determine the contractor's net volume entitlement, or entitlement reserves. The entitlement reserves are then adjusted to include reserves relating to income taxes payable. Under this method, reported reserves will increase as commodity prices decrease (and vice versa), since the production barrels necessary to achieve cost recovery change with the prevailing commodity prices.
Levels of Certainty for Reported Reserves
The qualitative certainty levels referred to in the definitions above are applicable to individual reserves entities (which refers to the lowest level at which reserves calculations are performed) and to reported reserves (which refers to the highest level sum of individual entity estimates for which reserves are presented). Reported reserves should target the following levels of certainty under a specific set of economic conditions:
A qualitative measure of the certainty levels pertaining to estimates prepared for the various reserves categories is desirable to provide a clearer understanding of the associated risks and uncertainties. However, the majority of reserves estimates are prepared using deterministic methods that do not provide a mathematically derived quantitative measure of probability. In principle, there should be no difference between estimates prepared using probabilistic or deterministic methods. Additional clarification of certainty levels associated with reserves estimates and the effect of aggregation is provided in the COGE Handbook.
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 33
Future Net Revenues Tables and Notes
Net Present Value of Future Net Revenues Before Income Taxes
as at December 31, 2011
(forecast prices and costs)
(in $ millions, discounted at % per year) |
Unit Value (1) |
|||||||||||||
0% | 5% | 10% | 15% | 20% | $/boe | |||||||||
Proved Developed Producing | ||||||||||||||
Mining | 65 036 | 40 083 | 27 354 | 20 207 | 15 843 | 15.88 | ||||||||
In Situ | 7 694 | 6 467 | 5 546 | 4 835 | 4 275 | 24.06 | ||||||||
East Coast Canada | 1 959 | 1 774 | 1 617 | 1 487 | 1 381 | 42.38 | ||||||||
North America Onshore | 3 026 | 2 136 | 1 657 | 1 361 | 1 158 | 12.89 | ||||||||
Total Canada | 77 715 | 50 460 | 36 174 | 27 890 | 22 657 | 17.07 | ||||||||
North Sea | 6 469 | 5 636 | 5 016 | 4 542 | 4 167 | 69.33 | ||||||||
Other International | 3 235 | 2 368 | 1 862 | 1 534 | 1 306 | 52.12 | ||||||||
Total Proved Developed Producing | 87 419 | 58 464 | 43 052 | 33 966 | 28 130 | 19.33 | ||||||||
Proved Developed Non-Producing |
||||||||||||||
Mining | | | | | | | ||||||||
In Situ | | | | | | | ||||||||
East Coast Canada | | | | | | | ||||||||
North America Onshore | 65 | 46 | 34 | 26 | 19 | 6.34 | ||||||||
Total Canada | 65 | 46 | 34 | 26 | 19 | 6.34 | ||||||||
North Sea | 1 707 | 1 293 | 1 033 | 858 | 735 | 47.76 | ||||||||
Other International | 3 797 | 2 783 | 2 145 | 1 718 | 1 416 | 38.46 | ||||||||
Total Proved Developed Non-Producing | 5 569 | 4 122 | 3 212 | 2 602 | 2 170 | 38.80 | ||||||||
Proved Undeveloped |
||||||||||||||
Mining | | | | | | | ||||||||
In Situ | 23 112 | 10 338 | 4 649 | 1 928 | 543 | 4.64 | ||||||||
East Coast Canada | 1 070 | 742 | 542 | 410 | 316 | 26.15 | ||||||||
North America Onshore | 167 | 92 | 49 | 22 | 7 | 3.91 | ||||||||
Total Canada | 24 349 | 11 172 | 5 240 | 2 360 | 866 | 5.06 | ||||||||
North Sea | 2 629 | 1 860 | 1 338 | 972 | 706 | 30.55 | ||||||||
Other International | 135 | 91 | 62 | 43 | 29 | 25.88 | ||||||||
Total Proved Undeveloped | 27 113 | 13 123 | 6 640 | 3 375 | 1 601 | 6.14 | ||||||||
Proved |
||||||||||||||
Mining | 65 036 | 40 083 | 27 354 | 20 207 | 15 843 | 15.88 | ||||||||
In Situ | 30 806 | 16 805 | 10 195 | 6 763 | 4 819 | 8.27 | ||||||||
East Coast Canada | 3 029 | 2 516 | 2 159 | 1 897 | 1 696 | 36.67 | ||||||||
North America Onshore | 3 258 | 2 274 | 1 740 | 1 409 | 1 184 | 11.88 | ||||||||
Total Canada | 102 129 | 61 678 | 41 448 | 30 276 | 23 542 | 13.11 | ||||||||
North Sea | 10 805 | 8 789 | 7 387 | 6 372 | 5 608 | 53.61 | ||||||||
Other International | 7 167 | 5 242 | 4 069 | 3 295 | 2 751 | 43.33 | ||||||||
Total Proved | 120 101 | 75 709 | 52 904 | 39 943 | 31 901 | 15.60 | ||||||||
Probable |
||||||||||||||
Mining | 28 852 | 9 564 | 4 403 | 2 563 | 1 755 | 9.21 | ||||||||
In Situ | 70 038 | 19 720 | 7 052 | 3 055 | 1 503 | 4.37 | ||||||||
East Coast Canada | 15 139 | 8 910 | 5 745 | 3 957 | 2 867 | 28.58 | ||||||||
North America Onshore | 1 350 | 666 | 386 | 245 | 165 | 7.65 | ||||||||
Total Canada | 115 379 | 38 860 | 17 586 | 9 820 | 6 290 | 7.51 | ||||||||
North Sea | 3 347 | 2 265 | 1 639 | 1 247 | 987 | 44.67 | ||||||||
Other International | 6 257 | 3 468 | 2 126 | 1 406 | 983 | 28.19 | ||||||||
Total Probable | 124 983 | 44 593 | 21 351 | 12 473 | 8 260 | 8.70 | ||||||||
Proved Plus Probable |
||||||||||||||
Mining | 93 888 | 49 647 | 31 757 | 22 770 | 17 598 | 14.43 | ||||||||
In Situ | 100 844 | 36 525 | 17 247 | 9 818 | 6 322 | 6.06 | ||||||||
East Coast Canada | 18 168 | 11 426 | 7 904 | 5 854 | 4 563 | 30.41 | ||||||||
North America Onshore | 4 608 | 2 940 | 2 126 | 1 654 | 1 349 | 10.80 | ||||||||
Total Canada | 217 508 | 100 538 | 59 034 | 40 096 | 29 832 | 10.73 | ||||||||
North Sea | 14 152 | 11 054 | 9 026 | 7 619 | 6 595 | 51.73 | ||||||||
Other International | 13 424 | 8 710 | 6 195 | 4 701 | 3 734 | 36.59 | ||||||||
Total Proved Plus Probable | 245 084 | 120 302 | 74 255 | 52 416 | 40 161 | 12.70 | ||||||||
34 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
Net Present Value of Future Net Revenues After Income Taxes
as at December 31, 2011
(forecast prices and costs)
(in $ millions, discounted at % per year) |
|||||||||||||
0% | 5% | 10% | 15% | 20% | |||||||||
Proved Developed Producing | |||||||||||||
Mining | 49 438 | 30 108 | 20 375 | 14 962 | 11 681 | ||||||||
In Situ | 6 845 | 5 746 | 4 925 | 4 295 | 3 801 | ||||||||
East Coast Canada | 1 486 | 1 377 | 1 243 | 1 138 | 1 052 | ||||||||
North America Onshore | 2 470 | 1 754 | 1 369 | 1 128 | 963 | ||||||||
Total Canada | 60 239 | 38 985 | 27 912 | 21 523 | 17 497 | ||||||||
North Sea | 2 086 | 1 850 | 1 663 | 1 515 | 1 397 | ||||||||
Other International | 1 132 | 842 | 671 | 561 | 483 | ||||||||
Total Proved Developed Producing | 63 457 | 41 677 | 30 246 | 23 599 | 19 377 | ||||||||
Proved Developed Non-Producing |
|||||||||||||
Mining | | | | | | ||||||||
In Situ | | | | | | ||||||||
East Coast Canada | | | | | | ||||||||
North America Onshore | 48 | 33 | 23 | 16 | 12 | ||||||||
Total Canada | 48 | 33 | 23 | 16 | 12 | ||||||||
North Sea | 659 | 506 | 411 | 348 | 303 | ||||||||
Other International | 2 360 | 1 775 | 1 396 | 1 135 | 947 | ||||||||
Total Proved Developed Non-Producing | 3 067 | 2 314 | 1 830 | 1 499 | 1 262 | ||||||||
Proved Undeveloped |
|||||||||||||
Mining | | | | | | ||||||||
In Situ | 16 996 | 7 154 | 2 851 | 839 | (156 | ) | |||||||
East Coast Canada | 790 | 515 | 376 | 279 | 208 | ||||||||
North America Onshore | 124 | 63 | 28 | 8 | (4 | ) | |||||||
Total Canada | 17 910 | 7 732 | 3 255 | 1 126 | 48 | ||||||||
North Sea | 1 010 | 731 | 537 | 397 | 293 | ||||||||
Other International | 58 | 40 | 28 | 19 | 13 | ||||||||
Total Proved Undeveloped | 18 978 | 8 503 | 3 820 | 1 542 | 354 | ||||||||
Proved |
|||||||||||||
Mining | 49 438 | 30 108 | 20 375 | 14 962 | 11 681 | ||||||||
In Situ | 23 841 | 12 900 | 7 776 | 5 134 | 3 645 | ||||||||
East Coast Canada | 2 276 | 1 892 | 1 619 | 1 417 | 1 260 | ||||||||
North America Onshore | 2 642 | 1 850 | 1 420 | 1 152 | 971 | ||||||||
Total Canada | 78 197 | 46 750 | 31 190 | 22 665 | 17 557 | ||||||||
North Sea | 3 755 | 3 087 | 2 611 | 2 260 | 1 993 | ||||||||
Other International | 3 550 | 2 657 | 2 095 | 1 715 | 1 443 | ||||||||
Total Proved | 85 502 | 52 494 | 35 896 | 26 640 | 20 993 | ||||||||
Probable |
|||||||||||||
Mining | 22 121 | 7 194 | 3 232 | 1 843 | 1 246 | ||||||||
In Situ | 51 925 | 14 182 | 4 837 | 1 932 | 823 | ||||||||
East Coast Canada | 11 081 | 6 063 | 3 932 | 2 676 | 1 893 | ||||||||
North America Onshore | 1 007 | 493 | 280 | 173 | 113 | ||||||||
Total Canada | 86 134 | 27 932 | 12 281 | 6 624 | 4 075 | ||||||||
North Sea | 1 284 | 885 | 651 | 504 | 405 | ||||||||
Other International | 2 911 | 1 566 | 934 | 601 | 410 | ||||||||
Total Probable | 90 329 | 30 383 | 13 866 | 7 729 | 4 890 | ||||||||
Proved Plus Probable |
|||||||||||||
Mining | 71 559 | 37 302 | 23 607 | 16 805 | 12 927 | ||||||||
In Situ | 75 766 | 27 082 | 12 613 | 7 066 | 4 468 | ||||||||
East Coast Canada | 13 357 | 7 955 | 5 551 | 4 093 | 3 153 | ||||||||
North America Onshore | 3 649 | 2 343 | 1 700 | 1 325 | 1 084 | ||||||||
Total Canada | 164 331 | 74 682 | 43 471 | 29 289 | 21 632 | ||||||||
North Sea | 5 039 | 3 972 | 3 262 | 2 764 | 2 398 | ||||||||
Other International | 6 461 | 4 223 | 3 029 | 2 316 | 1 853 | ||||||||
Total Proved Plus Probable | 175 831 | 82 877 | 49 762 | 34 369 | 25 883 | ||||||||
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 35
Total Future Net Revenues
as at December 31, 2011
(forecast prices and costs)
(in $ millions, undiscounted) | Revenue | Royalties | Operating Costs |
Development Costs |
Abandonment Expenses |
Future Net Revenue Before Deducting Future Income Tax Expenses |
Future Income Tax Expenses |
Future Net Revenue After Deducting Future Income Tax Expenses |
||||||||||
Proved Developed Producing | ||||||||||||||||||
Mining | 223 537 | 33 649 | 88 270 | 36 582 | | 65 036 | 15 598 | 49 438 | ||||||||||
In Situ | 23 124 | 1 701 | 10 809 | 2 843 | 77 | 7 694 | 849 | 6 845 | ||||||||||
East Coast Canada | 5 009 | 1 038 | 1 305 | 448 | 259 | 1 959 | 473 | 1 486 | ||||||||||
North America Onshore | 6 719 | 897 | 2 639 | 14 | 143 | 3 026 | 556 | 2 470 | ||||||||||
Total Canada | 258 389 | 37 285 | 103 023 | 39 887 | 479 | 77 715 | 17 476 | 60 239 | ||||||||||
North Sea | 7 550 | | 935 | 66 | 80 | 6 469 | 4 383 | 2 086 | ||||||||||
Other International | 3 868 | | 441 | 180 | 12 | 3 235 | 2 103 | 1 132 | ||||||||||
Total Proved Developed Producing | 269 807 | 37 285 | 104 399 | 40 133 | 571 | 87 419 | 23 962 | 63 457 | ||||||||||
Proved Developed Non-Producing |
||||||||||||||||||
Mining | | | | | | | | | ||||||||||
In Situ | | | | | | | | | ||||||||||
East Coast Canada | | | | | | | | | ||||||||||
North America Onshore | 237 | 42 | 107 | 21 | 2 | 65 | 17 | 48 | ||||||||||
Total Canada | 237 | 42 | 107 | 21 | 2 | 65 | 17 | 48 | ||||||||||
North Sea | 2 342 | | 629 | | 6 | 1 707 | 1 048 | 659 | ||||||||||
Other International | 5 835 | 749 | 1 205 | 80 | 4 | 3 797 | 1 437 | 2 360 | ||||||||||
Total Proved Developed Non-Producing | 8 414 | 791 | 1 941 | 101 | 12 | 5 569 | 2 502 | 3 067 | ||||||||||
Proved Undeveloped |
||||||||||||||||||
Mining | | | | | | | | | ||||||||||
In Situ | 108 481 | 15 527 | 41 702 | 27 597 | 543 | 23 112 | 6 116 | 16 996 | ||||||||||
East Coast Canada | 2 833 | 624 | 604 | 506 | 29 | 1 070 | 280 | 790 | ||||||||||
North America Onshore | 515 | 36 | 127 | 168 | 17 | 167 | 43 | 124 | ||||||||||
Total Canada | 111 829 | 16 187 | 42 433 | 28 271 | 589 | 24 349 | 6 439 | 17 910 | ||||||||||
North Sea | 4 585 | | 960 | 959 | 37 | 2 629 | 1 619 | 1 010 | ||||||||||
Other International | 277 | 24 | 54 | 63 | 1 | 135 | 77 | 58 | ||||||||||
Total Proved Undeveloped | 116 691 | 16 211 | 43 447 | 29 293 | 627 | 27 113 | 8 135 | 18 978 | ||||||||||
Proved |
||||||||||||||||||
Mining | 223 537 | 33 649 | 88 270 | 36 582 | | 65 036 | 15 598 | 49 438 | ||||||||||
In Situ | 131 605 | 17 228 | 52 511 | 30 440 | 620 | 30 806 | 6 965 | 23 841 | ||||||||||
East Coast Canada | 7 842 | 1 662 | 1 909 | 954 | 288 | 3 029 | 753 | 2 276 | ||||||||||
North America Onshore | 7 471 | 975 | 2 873 | 203 | 162 | 3 258 | 616 | 2 642 | ||||||||||
Total Canada | 370 455 | 53 514 | 145 563 | 68 179 | 1 070 | 102 129 | 23 932 | 78 197 | ||||||||||
North Sea | 14 477 | | 2 524 | 1 025 | 123 | 10 805 | 7 050 | 3 755 | ||||||||||
Other International | 9 980 | 773 | 1 700 | 323 | 17 | 7 167 | 3 617 | 3 550 | ||||||||||
Total Proved | 394 912 | 54 287 | 149 787 | 69 527 | 1 210 | 120 101 | 34 599 | 85 502 | ||||||||||
Probable |
||||||||||||||||||
Mining | 80 974 | 11 289 | 29 877 | 10 956 | | 28 852 | 6 731 | 22 121 | ||||||||||
In Situ | 259 749 | 46 872 | 90 543 | 51 537 | 759 | 70 038 | 18 113 | 51 925 | ||||||||||
East Coast Canada | 29 175 | 7 906 | 3 349 | 2 632 | 149 | 15 139 | 4 058 | 11 081 | ||||||||||
North America Onshore | 3 377 | 498 | 1 329 | 177 | 23 | 1 350 | 343 | 1 007 | ||||||||||
Total Canada | 373 275 | 66 565 | 125 098 | 65 302 | 931 | 115 379 | 29 245 | 86 134 | ||||||||||
North Sea | 4 047 | | 597 | 86 | 17 | 3 347 | 2 063 | 1 284 | ||||||||||
Other International | 9 167 | 1 113 | 1 313 | 481 | 3 | 6 257 | 3 346 | 2 911 | ||||||||||
Total Probable | 386 489 | 67 678 | 127 008 | 65 869 | 951 | 124 983 | 34 654 | 90 329 | ||||||||||
Proved Plus Probable |
||||||||||||||||||
Mining | 304 511 | 44 938 | 118 147 | 47 538 | | 93 888 | 22 329 | 71 559 | ||||||||||
In Situ | 391 354 | 64 100 | 143 054 | 81 977 | 1 379 | 100 844 | 25 078 | 75 766 | ||||||||||
East Coast Canada | 37 017 | 9 568 | 5 258 | 3 586 | 437 | 18 168 | 4 811 | 13 357 | ||||||||||
North America Onshore | 10 848 | 1 473 | 4 202 | 380 | 185 | 4 608 | 959 | 3 649 | ||||||||||
Total Canada | 743 730 | 120 079 | 270 661 | 133 481 | 2 001 | 217 508 | 53 177 | 164 331 | ||||||||||
North Sea | 18 524 | | 3 121 | 1 111 | 140 | 14 152 | 9 113 | 5 039 | ||||||||||
Other International | 19 147 | 1 886 | 3 013 | 804 | 20 | 13 424 | 6 963 | 6 461 | ||||||||||
Total Proved Plus Probable | 781 401 | 121 965 | 276 795 | 135 396 | 2 161 | 245 084 | 69 253 | 175 831 | ||||||||||
36 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
Future Net Revenues by Production Group
as at December 31, 2011
(forecast prices and costs)
(before income taxes, discounted at 10% per year) | ||||||
$ millions | $/boe (1) | |||||
Proved Producing | ||||||
Unconventional Mining | 27 354 | 15.88 | ||||
Unconventional In Situ | 5 546 | 24.06 | ||||
Total Unconventional (2) | 32 900 | 16.85 | ||||
Light & Medium Oil (3) | 8 822 | 56.02 | ||||
Natural Gas (4) | 1 330 | 11.34 | ||||
Total Proved Producing | 43 052 | 19.33 | ||||
Proved |
||||||
Unconventional Mining | 27 354 | 15.88 | ||||
Unconventional In Situ | 10 195 | 8.27 | ||||
Total Unconventional (2) | 37 549 | 12.71 | ||||
Light & Medium Oil (3) | 12 466 | 47.95 | ||||
Natural Gas (4) | 2 889 | 16.32 | ||||
Total Proved | 52 904 | 15.60 | ||||
Proved Plus Probable |
||||||
Unconventional Mining | 31 757 | 14.43 | ||||
Unconventional In Situ | 17 247 | 6.06 | ||||
Total Unconventional (2) | 49 004 | 9.71 | ||||
Light & Medium Oil (3) | 21 432 | 39.48 | ||||
Natural Gas (4) | 3 819 | 14.82 | ||||
Total Proved Plus Probable | 74 255 | 12.70 | ||||
Notes to Future Net Revenues Tables
Prices Realized
For prices realized by Suncor during 2011, please see the Production History section contained within this Statement of Reserves Data and Other Oil and Gas Information.
Forecast Prices and Costs
Crude oil, natural gas and other important benchmark reference pricing, as well as inflation and exchange rates utilized in the GLJ Reports and the Sproule Reports, are as per GLJ's price forecast dated January 1, 2012, as set out below. To the extent that there are fixed or presently determinable future prices or costs to which Suncor is legally bound by contractual or other obligations to supply a physical product, including those for an extension period of a contract that is likely to be extended, those prices or costs have been incorporated into the forecast prices as applied to the pertinent properties. The forecast cost and price assumptions include increases in wellhead selling prices, take into account inflation with respect to future operating and capital costs, and assume the continuance of current laws and regulations. Price adjustments relating to factors such as product quality and transportation were applied on an individual property basis in cash flow calculations.
Forecast prices included a US$/Cdn$ exchange rate of 0.98, a Cdn$/€ exchange rate of 1.35 and a Cdn$/£ exchange rate of 1.60. Forecast costs included a 2% inflation factor, except for costs for Mining, which included 4% inflation for 2013-2015, 3% inflation for 2016 and 2% thereafter.
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 37
Constant Prices and Costs
For purposes of comparison to those issuers who are required to report reserves estimates using constant prices and costs in accordance with the rules and regulations of the U.S. Securities and Exchange Commission (SEC), Suncor also presents reserves estimates using constant prices and costs. Benchmark prices utilized for the purpose of disclosing supplementary reserves estimates under constant pricing assumptions are also set out in the table below. Prices are based on the arithmetic average of the first-day-of-the-month price for the product for each month of 2011.
Constant prices included a US$/Cdn$ exchange rate of 1.02, a Cdn$/€ exchange rate of 1.38 and a Cdn$/£ exchange rate of 1.58.
Prices used in Reserves Tables (1)
Forecast | WTI (2) | WCS (3) | Pentanes (4) | AECO (5) | Light Sweet (6) |
Brent (7) | NBP (8) | B.C. Gas (9) | |||||||||
Year | US$/bbl | Cdn$/bbl | Cdn$/bbl | Cdn$/mmbtu | Cdn$/bbl | US$/bbl | Cdn$/mmbtu | Cdn$/mmbtu | |||||||||
2012 | 97.00 | 81.61 | 107.76 | 3.49 | 97.96 | 105.00 | 9.32 | 3.29 | |||||||||
2013 | 100.00 | 82.63 | 108.09 | 4.13 | 101.02 | 105.00 | 9.74 | 3.93 | |||||||||
2014 | 100.00 | 82.63 | 105.06 | 4.59 | 101.02 | 102.00 | 9.91 | 4.39 | |||||||||
2015 | 100.00 | 82.63 | 105.06 | 5.05 | 101.02 | 100.00 | 10.20 | 4.85 | |||||||||
2016 | 100.00 | 82.63 | 105.06 | 5.51 | 101.02 | 100.00 | 10.20 | 5.31 | |||||||||
2017 | 100.00 | 82.63 | 105.06 | 5.97 | 101.02 | 100.00 | 10.20 | 5.77 | |||||||||
2018 | 101.35 | 83.75 | 106.49 | 6.21 | 102.40 | 101.35 | 10.34 | 6.01 | |||||||||
2019 | 103.38 | 85.44 | 108.65 | 6.33 | 104.47 | 103.38 | 10.55 | 6.13 | |||||||||
2020 | 105.45 | 87.16 | 110.84 | 6.46 | 106.58 | 105.45 | 10.76 | 6.26 | |||||||||
2021 | 107.56 | 88.92 | 113.08 | 6.58 | 108.73 | 107.56 | 10.98 | 6.38 | |||||||||
2022+ | +2.0%/year | +2.0%/year | +2.0%/year | +2.0%/year | +2.0%/year | +2.0%/year | +2.0%/year | +2.0%/year | |||||||||
Constant |
US$/bbl |
Cdn$/bbl |
Cdn$/bbl |
Cdn$/mmbtu |
Cdn$/bbl |
US$/bbl |
Cdn$/mmbtu |
Cdn$/mmbtu |
|||||||||
All years | 96.19 | 78.81 | 105.28 | 3.71 | 96.04 | 111.85 | 9.43 | 3.32 | |||||||||
Disclosure of After-Tax Net Present Values of Future Net Revenue
Values presented in the table for Net Present Value of Future Net Revenues After Income Taxes reflect income tax burdens of assets at an individual asset level (for Mining, In Situ and East Coast Canada) or at a business area or legal entity level (for North Sea and North America Onshore) based on tax pools associated with that business area or legal entity. Income taxes for Other International assets are determined by their respective PSCs. Suncor's actual corporate legal entity structure for income taxes and income tax planning have not been considered, and, therefore, the total value for income taxes presented in the table may not provide an estimate of the value at the corporate entity level, which may be significantly different. The 2011 audited Consolidated Financial Statements and the MD&A should be consulted for information on income taxes at the corporate entity level.
38 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
Future Development Costs
as at December 31, 2011
(forecast prices and costs)
($ millions) | 2012 | 2013 | 2014 | 2015 | 2016 | Remainder | Total | Discounted At 10% |
||||||||||
Proved | ||||||||||||||||||
Mining | 2 173 | 2 231 | 1 634 | 1 332 | 1 345 | 27 867 | 36 582 | 16 661 | ||||||||||
In Situ | 1 643 | 1 337 | 1 048 | 1 130 | 1 521 | 23 761 | 30 440 | 13 426 | ||||||||||
East Coast Canada | 515 | 129 | 111 | 17 | 47 | 135 | 954 | 794 | ||||||||||
North America Onshore | 15 | 73 | 39 | 24 | 23 | 29 | 203 | 157 | ||||||||||
Total Canada | 4 346 | 3 770 | 2 832 | 2 503 | 2 936 | 51 792 | 68 179 | 31 038 | ||||||||||
North Sea | 406 | 318 | 183 | 77 | 41 | | 1 025 | 899 | ||||||||||
Other International | 118 | 132 | 47 | 11 | 10 | 5 | 323 | 282 | ||||||||||
Total Proved | 4 870 | 4 220 | 3 062 | 2 591 | 2 987 | 51 797 | 69 527 | 32 219 | ||||||||||
Proved Plus Probable |
||||||||||||||||||
Mining | 2 254 | 2 321 | 1 697 | 1 389 | 1 411 | 38 466 | 47 538 | 18 779 | ||||||||||
In Situ | 1 600 | 1 681 | 1 974 | 3 099 | 2 873 | 70 750 | 81 977 | 21 419 | ||||||||||
East Coast Canada | 741 | 661 | 648 | 441 | 352 | 743 | 3 586 | 2 656 | ||||||||||
North America Onshore | 62 | 156 | 87 | 24 | 23 | 28 | 380 | 310 | ||||||||||
Total Canada | 4 657 | 4 819 | 4 406 | 4 953 | 4 659 | 109 987 | 133 481 | 43 164 | ||||||||||
North Sea | 406 | 318 | 213 | 102 | 72 | | 1 111 | 963 | ||||||||||
Other International | 118 | 283 | 111 | 106 | 106 | 80 | 804 | 632 | ||||||||||
Total Proved Plus Probable | 5 181 | 5 420 | 4 730 | 5 161 | 4 837 | 110 067 | 135 396 | 44 759 | ||||||||||
Development costs include costs associated with both developed and undeveloped reserves. Significant development activities for 2012 are expected to include:
Management currently believes existing cash balances, internally generated cash flows and existing credit facilities are sufficient to fund future development costs. There can be no guarantee that funds will be available or that Suncor will allocate funding to develop all of the reserves attributed in the GLJ Reports and the Sproule Reports. Failure to develop those reserves would have a negative impact on future cash flow from operating activities.
The interest or other costs of external funding are not included in the reserves and future net revenue estimates and would reduce reserves and future net revenue to some degree depending upon the funding sources utilized. Suncor does not anticipate that interest or other funding costs would make development of any property uneconomic.
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 39
Abandonment and Reclamation Costs
The company completes an annual review of its abandonment and reclamation costs as they relate to our overall operations. The specific estimates established for forecasted abandonment and reclamation costs are based on available information, consistent with that assumed in our long range planning. These estimates consider the nature of all our forecasted abandonment and reclamation costs, where determinable, for our mining, in situ and conventional operations. Where no legal liability or constructive obligation for reclamation exists, potential costs have been excluded from the company's abandonment and reclamation cost estimates.
At December 31, 2011, Suncor estimated its undiscounted, uninflated abandonment and reclamation costs, net of estimated salvage value, for surface leases, wells, facilities and pipelines pertaining to its upstream assets to be approximately $7.2 billion (discounted at 10%, approximately $2.1 billion). Suncor estimates that it will incur $1.284 billion (undiscounted: 2012 $408 million, 2013 $463 million, 2014 $413 million) of its identified abandonment and reclamation costs during the next three years, over 85% of which is associated with mining operations. This cost estimate does not include the company's estimated abandonment and reclamation costs for its Refining and Marketing assets ($71 million, undiscounted and uninflated).
Approximately $2.2 billion (undiscounted) has been deducted as abandonment costs in estimating the future net revenues from proved plus probable reserves. This $2.2 billion represents the abandonment obligation for approximately 6,300 net reserves wells, including a forecasted number of future wells for undeveloped reserves, for our in situ and conventional activities. This figure counts in situ well pairs as one abandonment, whereas previous figures reported by Suncor counted in situ well pairs as two separate abandonments.
Abandonment and reclamation costs included in Suncor's $7.2 billion total that are excluded from the determination of future net revenues from reserves include, but are not limited to, costs related to the reclamation of disturbed land from oil sands mining activities, the treatment of oil sands tailings, the decommissioning of oil sands and natural gas processing facilities and well pads, lease sites, and the abandonment of wells to which no reserves have been assigned.
40 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
Additional Information Relating to Reserves Data
Gross Proved and Probable Undeveloped Reserves (1)(2)
The tables below outline the gross proved and probable undeveloped reserves, by product type, attributed to the company over the three most recent years specifically, and in aggregate for those beyond three years.
Both proved and probable undeveloped reserves are attributed by the Evaluators in accordance with standards and procedures contained in the COGE Handbook. Proved undeveloped reserves are those reserves that are expected to be recovered from known accumulations with a high degree of certainty and where a significant expenditure is required to render them capable of production. Probable undeveloped reserves are those reserves in known accumulations that are less certain to be recovered than proved reserves and where a significant expenditure is required to render them capable of production.
Gross Proved Undeveloped Reserves
(forecast prices and costs)
Prior |
2009 |
2010 |
2011 |
||||||||||||||
First Attributed |
Total at December 31 2008 |
First Attributed |
Total at December 31 2009 |
First Attributed |
Total at December 31 2010 |
First Attributed |
Total at December 31 2011 |
||||||||||
SCO (mmbbls) | |||||||||||||||||
Mining | | | | | | | | | |||||||||
In Situ | 766.0 | 766.0 | 121.0 | 564.0 | 14.0 | 651.0 | | 502.0 | |||||||||
Total SCO | 766.0 | 766.0 | 121.0 | 564.0 | 14.0 | 651.0 | | 502.0 | |||||||||
Bitumen (mmbbls) |
|||||||||||||||||
Mining | | | | | | | | | |||||||||
In Situ | | | | 427.0 | 2.0 | 360.0 | 315.0 | 661.1 | |||||||||
Total Bitumen | | | | 427.0 | 2.0 | 360.0 | 315.0 | 661.1 | |||||||||
Light & Medium Oil (mmbbls) |
|||||||||||||||||
East Coast Canada | | | 35.0 | 35.0 | 3.0 | 28.0 | 1.4 | 26.6 | |||||||||
North America Onshore | 0.1 | 0.1 | 0.2 | 0.3 | | 0.2 | 0.1 | 0.3 | |||||||||
Total Canada | 0.1 | 0.1 | 35.2 | 35.3 | 3.0 | 28.2 | 1.5 | 26.9 | |||||||||
North Sea (3) | | | 68.0 | 68.0 | | 19.0 | 24.6 | 43.3 | |||||||||
United States (4) | | | 8.3 | 8.3 | | | | | |||||||||
Other International (5) | | | | | 6.0 | 6.0 | 1.8 | 5.8 | |||||||||
Total Light & Medium Oil | 0.1 | 0.1 | 111.5 | 111.6 | 9.0 | 53.2 | 27.9 | 76.0 | |||||||||
Natural Gas (bcf) |
|||||||||||||||||
North America Onshore Canada | 31.2 | 31.2 | 29.1 | 15.6 | 32.0 | 118.4 | 2.1 | 78.7 | |||||||||
North Sea (3) | | | | | | 1.0 | 1.5 | 2.7 | |||||||||
United States (4) | | | 23.9 | 23.9 | | | | | |||||||||
Other International (5) | | | 413.0 | 413.0 | | | | | |||||||||
Total Natural Gas | 31.2 | 31.2 | 466.0 | 452.5 | 32.0 | 119.4 | 3.6 | 81.4 | |||||||||
NGLs (mmbbls) |
|||||||||||||||||
North America Onshore Canada | 0.1 | 0.1 | 0.3 | 0.4 | | 0.1 | | 0.1 | |||||||||
North Sea (3) | | | 1.0 | 1.0 | | | | 0.1 | |||||||||
Other International (5) | | | 9.0 | 9.0 | | | | | |||||||||
Total NGLs | 0.1 | 0.1 | 10.3 | 10.4 | | 0.1 | | 0.2 | |||||||||
Total (mmboe) | 771.4 | 771.4 | 320.5 | 1 188.4 | 30.4 | 1 084.2 | 343.5 | 1 252.8 | |||||||||
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 41
Gross Probable Undeveloped Reserves
(forecast prices and costs)
Prior |
2009 |
2010 |
2011 |
||||||||||||||
First Attributed |
Total at December 31 2008 |
First Attributed |
Total at December 31 2009 |
First Attributed |
Total at December 31 2010 |
First Attributed |
Total at December 31 2011 |
||||||||||
SCO (mmbbls) | |||||||||||||||||
Mining | 617.0 | 617.0 | 264.0 | 264.0 | | 215.0 | | 263.0 | |||||||||
In Situ | 1 746.0 | 1 746.0 | 174.0 | 595.0 | 6.0 | 400.0 | 916.0 | 1 212.0 | |||||||||
Total SCO | 2 363.0 | 2 363.0 | 438.0 | 859.0 | 6.0 | 615.0 | 916.0 | 1 475.0 | |||||||||
Bitumen (mmbbls) |
|||||||||||||||||
Mining | | | | | | 37.0 | | | |||||||||
In Situ | | | | 1 550.0 | 8.0 | 1 835.0 | 38.0 | 669.0 | |||||||||
Total Bitumen | | | | 1 550.0 | 8.0 | 1 872.0 | 38.0 | 669.0 | |||||||||
Light & Medium Oil (mmbbls) |
|||||||||||||||||
East Coast Canada | | | 80.0 | 80.0 | 7.0 | 85.0 | 143.2 | 217.4 | |||||||||
North America Onshore | | | 5.1 | 5.1 | 0.3 | 3.5 | 0.7 | 2.0 | |||||||||
Total Canada | | | 85.1 | 85.1 | 7.3 | 88.5 | 143.9 | 219.4 | |||||||||
North Sea (3) | | | 35.0 | 35.0 | | 15.0 | 13.8 | 17.1 | |||||||||
United States (4) | | | 3.8 | 3.8 | | | | | |||||||||
Other International (5) | | | 62.0 | 62.0 | 8.0 | 11.0 | 3.8 | 14.5 | |||||||||
Total Light & Medium Oil | | | 185.9 | 185.9 | 15.3 | 114.5 | 161.5 | 251.0 | |||||||||
Natural Gas (bcf) |
|||||||||||||||||
North America Onshore Canada | 76.3 | 76.3 | 235.2 | 233.2 | 75.2 | 136.2 | 3.2 | 86.9 | |||||||||
North Sea (3) | | | 50.0 | 50.0 | | 1.0 | 1.2 | 1.5 | |||||||||
United States (4) | | | 12.0 | 12.0 | | | | | |||||||||
Other International (5) | | | 651.0 | 651.0 | | 240.0 | 221.4 | 347.4 | |||||||||
Total Natural Gas | 76.3 | 76.3 | 948.2 | 946.2 | 75.2 | 377.2 | 225.8 | 435.8 | |||||||||
NGLs (mmbbls) |
|||||||||||||||||
North America Onshore Canada | 0.2 | 0.2 | 0.9 | 1.0 | 0.1 | 1.0 | | 0.8 | |||||||||
North Sea (3) | | | 1.0 | 1.0 | | | | | |||||||||
Other International (5) | | | 18.0 | 18.0 | | 8.0 | 6.0 | 11.5 | |||||||||
Total NGLs | 0.2 | 0.2 | 19.9 | 20.0 | 0.1 | 9.0 | 6.0 | 12.3 | |||||||||
Total (mmboe) | 2 375.9 | 2 375.9 | 801.8 | 2 772.6 | 41.9 | 2 673.4 | 1 159.1 | 2 479.9 | |||||||||
Undeveloped In Situ reserves, which constitute approximately 93% of Suncor's gross proved undeveloped reserves and 76% of Suncor's gross probable undeveloped reserves, will take more than two years to develop. Management uses integrated plans to forecast future development. These detailed plans align current production, processing and pipeline capacities, capital spending commitments and future development for the next ten years, and are reviewed and updated annually for internal and external factors affecting planned activity. Reserves are developed as required to keep processing capacity full. The timing associated with developing undeveloped reserves is a function of the forecasts of the declining production from existing well pairs. Suncor has delineated In Situ reserves to a high degree of certainty through seismic data and core hole drilling, consistent with COGE guidelines. In most cases, proved reserves have been drilled to a density of 16 wells per section, well in excess of the eight wells per section required for regulatory approval. In order to determine the economic cutoffs of undeveloped reserves, geological information is tested against existing production analogues that use established technology.
Undeveloped Mining reserves, which constitute approximately 11% of Suncor's gross probable undeveloped reserves, relate solely to the Syncrude Aurora South mine, which has regulatory approvals substantially in place and is well-delineated by core hole drilling. The owners of the Syncrude joint venture do not expect that the Aurora South mine will come on-stream in this decade.
Undeveloped conventional (light and medium oil, natural gas and NGLs) reserves constitute approximately 7% of Suncor's gross proved undeveloped reserves and approximately 13% of Suncor's gross probable undeveloped reserves. As part of its active portfolio management process, Suncor reviews the economic viability of its conventional properties containing
42 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
undeveloped reserves using industry standard economic evaluation techniques and its own pricing and economic environment assumptions. Through this active management process, Suncor selects some properties for further development activities, while others are held in abeyance, sold, or swapped. In developing the company's reserves, Suncor considers existing facility and gathering system capacity, capital allocation plans and remaining recoverable resources availability. Accordingly, in some cases, it will take longer than two years to develop all of the currently assigned undeveloped conventional reserves. With the exception of undeveloped reserves that Suncor may divest, Suncor plans to develop the majority of the conventional proved undeveloped reserves over the next five years and the majority of the conventional probable undeveloped reserves over the next seven years. Exceptions are development of some offshore properties which are limited by production facility capacity and development of some international properties constrained by daily contract quantities stipulated by PSCs.
Properties with no Attributed Reserves
The following table is a summary of properties to which no reserves are attributed as at December 31, 2011. For lands in which Suncor holds interests in different formations under the same surface area pursuant to separate leases, the area has been counted for each lease.
Country | Gross Hectares |
Net Hectares |
|||
Canada | 5 093 830 | 3 740 853 | |||
Libya | 2 950 978 | 1 339 489 | |||
U.S. Alaska | 1 161 123 | 387 002 | |||
Norway | 501 791 | 209 691 | |||
Syria | 345 194 | 345 194 | |||
U.K. | 138 437 | 44 574 | |||
Australia (overriding royalty interest only) | 113 027 | | |||
Total | 10 304 380 | 6 066 803 | |||
Suncor holds interests in a diverse portfolio of undeveloped petroleum assets in Canada and in several international areas. These assets range from exploration properties in a very preliminary phase of evaluation, to discovery areas where tenure to the property is held indefinitely on the basis of hydrocarbon test results, but where economic development is not currently possible or has not yet been sanctioned. In many cases where reserves are not attributed to lands containing one or more discovery wells, the key limiting factor is the lack of available production infrastructure. Each year, as part of the company's active management process to review the economic viability of its conventional properties, some properties are selected for further development activities, while others are held in abeyance, sold, swapped or relinquished back to the mineral rights owner.
In 2012, Suncor's rights to explore, develop and exploit will expire for 189,374 net hectares in Canada, 131,308 net hectares in Alaska and 39,840 net hectares in the U.K. portion of the North Sea. No land tenure expiries are scheduled to occur for either Mining or In Situ properties for 2012. Substantial portions of expiring lands may have their tenure continued beyond 2012 through the conduct of work programs and/or the payment of prescribed fees to the rights owner.
Oil and Gas Properties and Wells
For a description of the company's important properties, plants, facilities and installations, see the Narrative Description of Suncor's Businesses section in this AIF.
Suncor's Oil Sands operations recover bitumen through oil sands mining and in situ development in northern Alberta. Conventional activities are focused on the development and production of oil, natural gas, and NGLs from onshore reserves in Western Canada, Libya and Syria, and from reserves offshore Newfoundland and in the North Sea.
The following table is a summary of operated and non-operated oil and gas wells associated with the company's reserves as at December 31, 2011:
Oil Wells |
Natural Gas Wells |
||||||||||||||||
Producing |
Non-Producing |
Producing |
Non-Producing |
||||||||||||||
Gross | Net | Gross | Net | Gross | Net | Gross | Net | ||||||||||
Alberta | 253.0 | 236.9 | 134.0 | 130.7 | 4 268.0 | 2 916.4 | 206.0 | 168.6 | |||||||||
British Columbia | 15.0 | 9.6 | 6.0 | 5.8 | 235.0 | 200.5 | 87.0 | 70.2 | |||||||||
Saskatchewan | | | | | 738.0 | 268.1 | 91.0 | 43.5 | |||||||||
Newfoundland | 61.0 | 15.6 | 2.0 | 0.8 | | | | | |||||||||
North Sea | 26.0 | 7.8 | 4.0 | 1.2 | | | | | |||||||||
Other International | 213.0 | 106.5 | 77.0 | 40.0 | | | 6.0 | 6.0 | |||||||||
Total | 568.0 | 376.4 | 223.0 | 178.5 | 5 241.0 | 3 385.0 | 390.0 | 288.3 | |||||||||
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 43
There are no production wells associated with Mining properties. Suncor has no proved developed non-producing reserves or probable developed non-producing reserves in its Mining reserves.
For In Situ properties, proved non-producing reserves and probable non-producing reserves are associated with wells that have been drilled within the last two years, which require further capital for completion and tie in to facilities to bring the wells on-stream. This capital requirement is significant enough that the reserves are not classified as developed. SAGD well pairs are counted as one well.
In Syria, wells previously reported as producing have been reclassified to non-producing, consistent with the reclassification of proved developed producing reserves and probable developed producing reserves to their respective non-producing categories.
The majority of remaining conventional non-producing reserves have been in their current non-producing state for less than four years and are forecast to be brought on-stream within the next two years. These remaining non-producing reserves are primarily associated with:
Costs Incurred
The table below summarizes the company's capital expenditures related to its reserves activities for the year ended December 31, 2011.
($ millions) | Exploration Costs |
Proved Property Acquisition Costs |
Unproved Property Acquisition Costs |
Development Costs |
Total | ||||||
Canada Mining and In Situ | 57 | | 200 | 4 362 | 4 619 | ||||||
Canada East Coast Canada and North America Onshore | 77 | | 1 | 476 | 554 | ||||||
North Sea | 97 | | 29 | 74 | 200 | ||||||
Other International | 36 | | | 37 | 73 | ||||||
Total | 267 | | 230 | 4 949 | 5 446 | ||||||
44 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
Exploration and Development Activities
The table below outlines the gross and net exploratory and development wells the company completed during the year ended December 31, 2011.
Total number of wells completed | Exploratory Wells | Development Wells | ||||||||
Gross | Net | Gross | Net | |||||||
Canada | ||||||||||
Oil | | | 73.0 | 64.6 | ||||||
Natural Gas | 1.0 | 0.5 | 105.0 | 52.3 | ||||||
Dry Hole | 2.0 | 2.0 | 2.0 | 1.2 | ||||||
Service | | | 8.0 | 5.0 | ||||||
Stratigraphic Test | 22.0 | 13.8 | 617.0 | 311.6 | ||||||
Total | 25.0 | 16.3 | 805.0 | 434.7 | ||||||
North Sea |
||||||||||
Oil | | | 4.0 | 1.2 | ||||||
Natural Gas | | | | | ||||||
Dry Hole | 1.0 | 0.3 | | | ||||||
Service | | | 1.0 | 0.3 | ||||||
Stratigraphic Test | | | | | ||||||
Total | 1.0 | 0.3 | 5.0 | 1.5 | ||||||
Other International |
||||||||||
Oil | | | 4.0 | 2.5 | ||||||
Natural Gas | | | | | ||||||
Dry Hole | 1.0 | 0.5 | 1.0 | 1.0 | ||||||
Service | | | | | ||||||
Stratigraphic Test | | | | | ||||||
Total | 1.0 | 0.5 | 5.0 | 3.5 | ||||||
Significant exploration and development wells completed in 2011 included:
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 45
Production History
The table below outlines the company's historical production information, by product type, for each of the four financial quarters, as an average daily measure, for Canada, North Sea and Other International. Average price realized is net of transportation costs, but before royalties.
2011 |
||||||||||||
Three months ended | ||||||||||||
Mar 31 | Jun 30 | Sept 30 | Dec 31 | |||||||||
Canada | ||||||||||||
Oil Sands (1) |
||||||||||||
Average total production (mbbls/d) | 360.6 | 277.2 | 362.5 | 356.8 | ||||||||
Average In Situ bitumen production (mbbls/d) | 87.3 | 85.8 | 83.8 | 101.4 | ||||||||
Average price realized ($/bbl) | 83.74 | 93.16 | 86.40 | 98.01 | ||||||||
Royalties ($/bbl) | (3.33 | ) | (5.49 | ) | (6.28 | ) | (8.17 | ) | ||||
Total cash operating costs ($/bbl) | (36.42 | ) | (49.73 | ) | (37.06 | ) | (40.42 | ) | ||||
In Situ cash operating costs ($/bbl) | (22.00 | ) | (24.15 | ) | (27.05 | ) | (29.15 | ) | ||||
Light & Medium Oil |
||||||||||||
Average total production (mbbls/d) | 65.0 | 65.0 | 69.1 | 63.4 | ||||||||
Average price realized ($/bbl) | 104.01 | 112.19 | 111.30 | 111.77 | ||||||||
Royalties ($/bbl) | (32.04 | ) | (34.99 | ) | (33.56 | ) | (36.95 | ) | ||||
Production costs ($/bbl) | (8.14 | ) | (7.26 | ) | (6.69 | ) | (9.36 | ) | ||||
Netback ($/bbl) | 63.83 | 69.94 | 71.05 | 65.46 | ||||||||
Natural Gas (2) |
||||||||||||
Average total production (mmcfe/d) | 411 | 402 | 375 | 365 | ||||||||
Average price realized ($/mcfe) | 4.52 | 4.90 | 4.56 | 4.31 | ||||||||
Royalties ($/mcfe) | (0.44 | ) | (0.54 | ) | (0.48 | ) | (0.48 | ) | ||||
Production costs ($/mcfe) | (1.49 | ) | (1.35 | ) | (1.71 | ) | (1.66 | ) | ||||
Netback ($/mcfe) | 2.59 | 3.01 | 2.37 | 2.17 | ||||||||
North Sea |
||||||||||||
Light & Medium Oil (3) |
||||||||||||
Average total production (mboe/d) | 65.7 | 32.7 | 33.1 | 55.0 | ||||||||
Average price realized ($/boe) | 93.74 | 113.24 | 111.60 | 106.41 | ||||||||
Royalties ($/boe) | (0.00 | ) | (0.00 | ) | (0.00 | ) | (0.00 | ) | ||||
Production costs ($/boe) | (6.86 | ) | (6.66 | ) | (6.34 | ) | (3.64 | ) | ||||
Netback ($/boe) | 86.88 | 106.58 | 105.26 | 102.77 | ||||||||
Other International |
||||||||||||
Light & Medium Oil |
||||||||||||
Average total production (mboe/d) | 24.2 | | | 24.8 | ||||||||
Average price realized ($/boe) | 99.07 | | | 109.58 | ||||||||
Royalties ($/boe) | (80.75 | ) | | | (61.85 | ) | ||||||
Production costs ($/boe) | (2.85 | ) | | | (8.12 | ) | ||||||
Netback ($/boe) | 15.47 | | | 39.61 | ||||||||
Natural Gas (4) |
||||||||||||
Average total production (mboe/d) | 17.1 | 16.9 | 18.9 | 16.0 | ||||||||
Average price realized ($/boe) | 84.58 | 95.28 | 95.49 | 91.69 | ||||||||
Royalties ($/boe) | (32.04 | ) | (38.54 | ) | (43.28 | ) | (35.11 | ) | ||||
Production costs ($/boe) | (6.19 | ) | (7.66 | ) | (6.06 | ) | (8.20 | ) | ||||
Netback ($/boe) | 46.35 | 49.08 | 46.15 | 48.38 | ||||||||
46 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
The following table provides the production volumes for each of Suncor's important fields for the year ended December 31, 2011.
SCO and Bitumen |
Light & Medium Oil |
Natural Gas | NGLs | Total | |||||||
mbbls/d | mbbls/d | mmcfe/d | mbbls/d | mboe/d | |||||||
Mining Suncor (1) | 228.6 | | | | 228.6 | ||||||
Mining Syncrude (1) | 34.6 | | | | 34.6 | ||||||
Firebag (2) | 48.1 | | | | 48.1 | ||||||
MacKay River (2) | 27.9 | | | | 27.9 | ||||||
Buzzard | | 41.9 | 4.3 | 0.3 | 42.9 | ||||||
Hibernia | | 30.9 | | | 30.9 | ||||||
White Rose | | 18.5 | | | 18.5 | ||||||
Terra Nova | | 16.2 | | | 16.2 | ||||||
Production Estimates
The table below outlines the volume of the company's production of gross proved and gross proved plus probable reserves estimated for the year ending December 31, 2012, as is reflected in the estimates of gross proved reserves and gross probable reserves previously disclosed in the Summary of Oil and Gas Reserves tables. Production estimates for 2012 for proved plus probable reserves from: Suncor's mining operations (excluding Syncrude) are 232 mbbls/d of SCO, approximately 47% of total estimated production for 2012; and from Firebag are 72 mbbls/d of SCO and bitumen, approximately 15% of total estimated production for 2012.
SCO |
Bitumen |
Light & Medium Oil |
Natural Gas |
NGLs |
|||||||||||||||||
Gross | Net | Gross | Net | Gross | Net | Gross | Net | Gross | Net | ||||||||||||
mbbls/d | mbbls/d | mbbls/d | mbbls/d | mboe/d | mboe/d | mmcfe/d | mmcfe/d | mboe/d | mboe/d | ||||||||||||
Canada | |||||||||||||||||||||
Proved | 325.3 | 296.9 | 21.2 | 19.4 | 40.9 | 32.9 | 287.1 | 243.9 | 2.3 | 1.7 | |||||||||||
Probable | 24.2 | 21.7 | 0.4 | (0.7 | ) | 14.3 | 10.3 | 8.7 | 7.1 | 0.2 | 0.1 | ||||||||||
Proved Plus Probable | 349.5 | 318.6 | 21.6 | 18.7 | 55.2 | 43.2 | 295.8 | 251.0 | 2.5 | 1.8 | |||||||||||
North Sea |
|||||||||||||||||||||
Proved | | | | | 54.0 | 54.0 | 5.8 | 5.8 | 0.5 | 0.5 | |||||||||||
Probable | | | | | | | | | | | |||||||||||
Proved Plus Probable | | | | | 54.0 | 54.0 | 5.8 | 5.8 | 0.5 | 0.5 | |||||||||||
Other International |
|||||||||||||||||||||
Proved | | | | | 37.0 | 13.8 | | | | | |||||||||||
Probable | | | | | | | | | | | |||||||||||
Proved Plus Probable | | | | | 37.0 | 13.8 | | | | | |||||||||||
Work Commitments
The practice of governments requiring companies to pledge to carry out work commitments in exchange for the right to carry out exploration for and development of hydrocarbons is common, particularly in unexplored or lightly explored regions of the world. The following table shows the estimated values of work commitments Suncor has made in regard to the lands it holds as at December 31, 2011. These commitments run through 2013 and are primarily for conducting seismic programs and drilling exploration wells.
Country/Area ($ millions) |
2012 | Total | |||
Canada | 1 | 24 | |||
North Sea | 158 | 216 | |||
Other International | 128 | 369 | |||
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 47
Forward Contracts and Transportation Obligations
Suncor may use financial derivatives to manage its exposure to fluctuations in commodity prices; however, Suncor did not have any such material financial derivative transactions in 2011. A description of Suncor's use of such instruments is provided in the 2011 audited Consolidated Financial Statements and related MD&A for the year ended December 31, 2011.
As a result of the merger, Suncor holds a commitment of 85,000 mcf/d of contract capacity on the Alliance Pipeline that expires in November 2015, which enables Suncor to transport high-energy, rich natural gas from northeastern B.C. and northwestern Alberta to the Alliance Pipeline terminus in Illinois. Subsequent to Suncor's 2010 divestitures, this commitment exceeds Suncor's production from the area. Suncor estimates its minimum commitment on the Alliance Pipeline to be approximately US$50 million per year. Natural gas for the Alliance Pipeline commitment is expected to be supplemented by supply purchased from third parties. Deliveries to Illinois are expected to continue for the term of the contract provided the sales price in Illinois exceeds, at a minimum, the variable cost of the transportation.
Tax Horizon
In 2011, Suncor was subject to cash tax in the local jurisdictions related to earnings from its North Sea and Other International production, but was not cash taxable in Canada on the majority of its Canadian earnings. Suncor's 2011 audited Consolidated Financial Statements were prepared using the 2014 effective Canadian tax rate to record income taxes, as this rate would apply to the reversal of long-term temporary differences. Based on projected future net earnings, Suncor may be cash taxable in Canada by 2013.
Contingent Resources
GLJ conducted an independent assessment of Best Estimate contingent resources volumes for all of Suncor's Mining properties and for Suncor's In Situ properties to which reserves are attributed (Firebag and MacKay River). For In Situ properties without attributed reserves, GLJ audited assessments of Best Estimate contingent resources volumes (approximately 41% of In Situ contingent resources) prepared by Suncor's internal qualified reserves evaluators. Best Estimate contingent resources for other properties were prepared by Suncor's internal qualified reserves evaluators. All contingent resources estimates were conducted in accordance with the COGE Handbook.
Contingent resources are those quantities of petroleum estimated, as of a given date, to be potentially recoverable from known accumulations using established technology or technology under development, but which are not currently considered to be recoverable due to one or more contingencies. Contingencies may include factors such as economic, legal, environmental, political and regulatory matters or lack of infrastructure or markets. Best Estimate is considered to be the best estimate of the quantity that will actually be recovered. It is equally likely that the actual remaining quantities recovered will be greater or less than the best estimate. The best estimate of potentially recoverable volumes is generally prepared independent of the risks associated with achieving commercial production.
There is no certainty that all or any portion of the contingent resources will be commercially viable to produce. Estimates of contingent resources have not been adjusted for risk based on the chance of development. There is no certainty as to the timing of such development. For movement of contingent resources to reserves categories, all projects must have an economic depletion plan and may require, among other things, additional delineation drilling, regulatory applications, or sanction from the company's Board and any joint venture owners to proceed with development.
In general, significant factors that may change contingent resources estimates include further delineation drilling, which could change the estimates either positively or negatively, future technology improvements, which would positively affect the estimates, and additional processing capacity that could affect the volumes recoverable or type of production. Additional facility design work, development plans, reservoir studies and delineation drilling are often completed in the course of preparing the company's application for regulatory approvals. Once there is a high level of certainty of receiving all regulatory and corporate approvals, and all other contingencies are removed, the resources may then be reclassified as reserves.
48 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
Effective December 31, 2011, Suncor's Best Estimate of gross contingent resources is set out in the table below. Volumes represent Suncor's working interest in properties with contingent resources.
Best Estimate Gross Contingent Resources | SCO | Bitumen | Light & Medium Oil |
Natural Gas | NGLs | Total | ||||||||
mmbbls | mmbbls | mmbbls | bcf | mmbbls | mmboe | |||||||||
Mining | 4 582 | 2 156 | | | | 6 738 | ||||||||
In Situ | 6 432 | 6 020 | | | | 12 452 | ||||||||
East Coast Canada | | | 247 | 2 203 | | 614 | ||||||||
North America Onshore (1) | | | 116 | 8 017 | 13 | 1 465 | ||||||||
Total Canada | 11 014 | 8 176 | 363 | 10 220 | 13 | 21 269 | ||||||||
North America Onshore U.S. | | | | 133 | | 22 | ||||||||
North Sea (2) | | | 45 | 36 | | 52 | ||||||||
Other International | | | 481 | 245 | 1 | 522 | ||||||||
As at December 31, 2011 | 11 014 | 8 176 | 889 | 10 634 | 14 | 21 865 | ||||||||
As at December 31, 2010 | 12 462 | 5 291 | 956 | 10 370 | 17 | 20 454 | ||||||||
Contingent resources increased to 21,865 mmboe at December 31, 2011 from 20,454 mmboe at December 31, 2010. Increases to contingent resources included extensions of the MacKay River and Meadow Creek leases, acquisition of additional leases in the Audet area, technical revisions for In Situ assets, recognition of potential Hibernia secondary zones, and volumes attributed to discoveries in the Ballicatters, Butch and Wilson Creek areas. The net effects of Suncor's transactions with Total E&P, which included the acquisition of an interest in Joslyn, the partial disposition of our interest in Fort Hills and a change in assumption that reclassified remaining Fort Hills reserves from SCO to bitumen, also increased total contingent resources. These increases were partially offset by the transfer of resources to proved plus probable reserves for Golden Eagle and Hebron, and asset dispositions.
Suncor has assumed that some Mining and some In Situ contingent resources will be upgraded and sold as SCO. To the extent that these volumes are not upgraded, but rather sold as bitumen, contingent resources volumes reported would be lower for SCO and higher for bitumen, and total contingent resources volumes would be higher because of the yield factor applied to bitumen volumes when upgraded into SCO. Conversely, to the extent that more volumes are upgraded, total contingent resources volumes would be lower.
Generally, the timing for the economic assessments of contingent resources will be determined by Suncor's long-term resource development plan and its forecast for economic conditions. Management uses integrated plans to forecast future development of resources. These plans align current and planned production, current and forecasted market conditions, processing and pipeline capacities, capital spending commitments and related future development plans. These plans are reviewed and updated annually for internal and external factors affecting these planned activities. In particular, as Suncor's Oil Sands reserves base depletes, the company anticipates that it will look to develop its other Mining and In Situ properties, at which time the assessment of the economic viability of specific properties with contingent resources will be made.
Details of Suncor's contingent resources and a categorization of the contingencies ascribed to these resources are provided below.
Mining Contingent Resources
Mining contingent resources comprise approximately 31% of Suncor's total contingent resources, with 59% of these contingent resources on properties in which Suncor has a 100% working interest and the remainder forming part of joint arrangements where Suncor has working interests varying from 12% to 40.8%.
Economic Contingencies
GLJ has tested the economic viability of the Fort Hills and Joslyn North projects, which constitute approximately 25% of total Mining contingent resources, and determined them to be economic. The economic status of remaining Mining contingent resources is currently undetermined; however, the company anticipates that the contingent resources will be economic to develop under current market conditions, as the potential development of these contingent resources would reflect the application of established technology and reasonable assumptions for mine pit design.
Non-Technical Contingencies
Given the concern within the industry with respect to the potential cost escalation of large mining projects, the reclassification of Mining contingent resources to reserves is largely contingent upon an assessment that development will be sanctioned and
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 49
commence within a reasonable time frame. The Fort Hills and Joslyn North mining projects have substantially all regulatory approvals in place, but final investment decisions based on development plans currently being finalized await decision by the joint venture owners, and, as a result, it is Suncor's view that the development of these contingent resources in the near term is not sufficiently assured to support reclassification to reserves. For Suncor's remaining Mining contingent resources, regulatory permits must be obtained before a project sanction decision by Suncor's Board and joint venture owners, as applicable, is considered.
In Situ Contingent Resources
In Situ contingent resources comprise approximately 57% of Suncor's total contingent resources, with 59% of these contingent resources on properties in which Suncor has a 100% working interest and the remainder forming part of joint arrangements where Suncor has working interests varying from 10% to 75%. These contingent resources are all in the Athabasca oil sands area and over 80% of the contingent resources are in, or immediately adjacent to, existing MacKay River or Firebag operations.
The primary risk associated with developing In Situ contingent resources relates to actual production performance versus performance estimated based on the geological data used in the production forecast. The geological data varies substantially as a result of the density of core holes used in the analysis. The density can be as low as one well per section, and as high as 16 wells per section.
Economic Contingencies
The economic status of In Situ contingent resources is currently undetermined; however, the company anticipates that the contingent resources will be economic to develop under current market conditions. Technical net pay cutoffs are consistent with, and based upon, the same fiscal conditions as those used in the determination of proved plus probable reserves for Firebag and MacKay River, or are analogous to existing in situ operations successfully developed by other entities in the oil sands industry. Suncor anticipates that its In Situ contingent resources will be recoverable using established SAGD processes.
Contingent resources have been assigned to certain sections associated with Firebag and MacKay River development areas. These volumes have not been classified as proved plus probable reserves in part because drilling density is inadequate for reliable mapping of effective pay intervals. However, the company has two-dimensional seismic control, minimum mapped effective pay thicknesses of 15 metres for Firebag and 14 metres for MacKay River, and drilling density greater than or equal to one vertical well per section (except when that section is bound by sections with greater than or equal to one well per section). The company expects that an assessment of the economic viability of these resources will be undertaken when drilling density has increased such that it is adequate for reliable mapping of effective pay intervals and as the company's long-term plans require additional bitumen to keep existing processing capacities associated with these assets full.
Contingent resources for other In Situ properties (Chard, Kirby, Lewis, Meadow Creek and MacKay River outside of the development areas noted above) were assigned to sections with core holes, or lands within two legal subdivisions of a delineation well and having net continuous bitumen pay greater than 15 metres. These contingent resources require the completion of further reservoir studies and delineation drilling, as well as the preparation of development plans and facility designs prior to reserves being assigned. The company expects that an assessment of the economic viability of these contingent resources will be undertaken as the company's long-term plans require additional bitumen.
Non-Technical Contingencies
The reclassification of In Situ contingent resources to reserves is also largely contingent upon an assessment that development will be sanctioned and commence within a reasonable time frame. The contingent resources associated with development areas for Firebag and MacKay River have regulatory approvals in place, but a final investment decision is subject to an assessment of economic viability and approval by Suncor's Board. For remaining In Situ contingent resources, the company must still obtain regulatory approvals and project sanction by Suncor's Board and joint venture owners, as applicable.
Other Contingent Resources
Other contingent resources are mainly conventional sources of oil and gas associated with Suncor's Exploration and Production segment. These other contingent resources comprise approximately 12% of Suncor's total contingent resources and are anticipated to be recoverable using established technologies. These other contingent resources primarily include:
50 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
Except as noted below, the economic status of other contingent resources is undetermined. In general, further reservoir studies and delineation drilling, and preparation of development plans and facility designs are required to make a determination as to whether these contingent resources would be economic or not under current conditions.
For North America Onshore, contingent resources associated with the Gilby/Wilson tight oil play have been determined to be economic. The economic status of contingent resources associated with certain fields in the Arctic Islands is undetermined, but anticipated to be economic provided the natural gas resources are able to be delivered to markets outside of North America. Remaining North America Onshore contingent resources are primarily in geographically remote areas and are sub-economic due to lack of processing and transportation infrastructure in these areas. These areas require commitments to identify the existence of sufficient resources for economic development, following which construction of processing facilities and/or transportation infrastructure would be required, which is not anticipated to occur within the next five years.
For East Coast Canada, contingent resources for Hebron and some for Terra Nova have been determined to be economic. The company anticipates that it will assess the economic viability of contingent resources for Hibernia and White Rose within the next five years and that these contingent resources will be economic to develop under current market conditions. Timing for completion of economic evaluation of remaining contingent resources is not anticipated to occur within the next five years.
For the North Sea, contingent resources are in the appraisal stage. The economic status of these contingent resources is undetermined, but the company anticipates that it will assess their economic viability within the next five years and that these contingent resources will be economic to develop under current market conditions.
For Other International, contingent resources in Syria are currently sub-economic, but would be economic in the absence of force majeure under the company's contractual obligations. In Libya, contingent resources associated with producing fields are economic, while the economic viability of resources associated with non-producing fields is undetermined, but the company anticipates that it will complete economic assessments for these fields in the next five years.
Non-Technical Contingencies
The reclassification of contingent resources associated with the Exploration and Production segment to proved plus probable reserves is primarily contingent upon the receipt of appropriate regulatory approvals, and an assessment that development will be sanctioned by Suncor's Board and joint venture partners, as applicable, and commence within a reasonable time frame. Contingent resources for some North America Onshore properties in geographically remote areas are also contingent upon the development of a suitable regulatory framework.
The estimated production for Syria for 2012 has been classified as contingent resources, contingent upon Suncor being able to record production and receive payment. In order for this to occur, sanctions that are applicable to Suncor and that were initiated as a result of political unrest in Syria must be lifted so that the company can conduct business with its joint venture partner in Syria. For remaining contingent resources associated with Suncor's Syrian assets, a daily contract quantity for production, which limits the rate at which gas can be produced, is the primary contingency. This production constraint prevents a portion of the resources from being produced within the contract period. This contingency could be removed through contract extension or a higher daily contract quantity at a sufficient sales price.
INDUSTRY CONDITIONS
The oil and natural gas industry is subject to extensive controls and regulations governing its operations (including land tenure, exploration, environmental, development, production, refining, transportation, and marketing) imposed by legislation enacted by various levels of government and with respect to export and taxation of oil and natural gas by agreements among the governments of Canada and Alberta, among others, as well as the governments of the United States and other foreign jurisdictions in which we operate, all of which should be carefully considered by investors in the oil and gas industry. It is not expected that any of these controls or regulations will affect the company's operations in a manner materially different than they would affect other oil and gas companies of similar size and with similar assets. All current legislation is a matter of public record, and the company is unable to predict what additional legislation or amendments may be enacted. The following discussion outlines some of the principal aspects of legislation, regulations and agreements governing Suncor's operations.
Pricing, Marketing and Exporting Crude Oil and Natural Gas
The producers of oil are entitled to negotiate sales and purchase agreements directly with oil purchasers. Most agreements are linked to global oil prices. Global oil prices are set by daily, weekly and monthly physical and financial transactions for crude oil around the world. Those prices are primarily based on worldwide fundamentals of supply and demand. Specific prices depend in part on oil quality, prices of competing fuels, distance to the markets, the value of refined products, the supply/demand balance, and other contractual terms. In Canada, oil exporters are also entitled to enter into export contracts. If the term of an export contract exceeds one year for light crude oil or exceeds two years for heavy crude oil (to a maximum of 25 years), the
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 51
exporter is required to obtain an export licence from the National Energy Board (NEB), and the issuance of such licence requires a public hearing and the approval of the Governor in Council. If the term of an export contract does not exceed one year for light crude oil or does not exceed two years for heavy crude oil, the exporter is required to obtain an order approving such export from the NEB.
The price of natural gas is also determined by negotiation between buyers and sellers. Natural gas exported from Canada is subject to regulation by the NEB and the Government of Canada. Exporters are free to negotiate prices and other terms with purchasers, provided that the export contracts continue to meet certain other criteria prescribed by the NEB and the Government of Canada. Natural gas (other than propane, butane and ethane) export contracts with a term that exceeds two years (to a maximum of 25 years) require the exporter to obtain an export licence from the NEB, and the issuance of such licence requires a public hearing and the approval of the Governor in Council. Natural gas (other than propane, butane and ethane) export contracts for volumes of more than 30,000 m 3/d with a term that does not exceed two years, or export contracts for volumes of 30,000 m 3/d or less for a term of two to 20 years, must be made pursuant to an NEB order. The Government of Alberta also regulates the volume of natural gas that may be removed from the province for consumption elsewhere based on such factors as reserves availability, transportation arrangements, and market considerations.
Internationally, prices for crude oil and natural gas fluctuate in response to changes in the supply of and demand for crude oil and natural gas, market uncertainty and a variety of other factors beyond Suncor's control. These factors include, but are not limited to, the actions of OPEC, world economic conditions, government regulation, political developments, the foreign supply of oil, the price of foreign imports, the availability of alternate fuel sources and weather conditions.
Pipeline Capacity
Although pipeline expansions are ongoing, the apportionment of capacity on pipeline systems can occur from time-to-time due to pipeline and downstream operating problems that can affect the ability to market western Canadian crude oil and natural gas.
Recently, pipeline capacity to support the growth of the oil sands industry in Canada has been the subject of political and environmental debate. Suncor supports the responsible development of pipeline infrastructure that would open access to other markets.
Royalties, Incentives and Income Taxes
Canada
In addition to federal regulation, each province has legislation and regulations governing land tenure, royalties, production rates, environmental protection, and other matters. The royalty regime is a significant factor in the profitability of SCO, bitumen, crude oil, NGL and natural gas production. Royalties payable on production from lands other than Crown lands are determined by negotiations between the mineral freehold owner and the lessee, although production from such lands may be subject to certain provincial taxes. Crown royalties are determined by governmental regulation and are generally calculated as a percentage of revenues received from the value of the gross production. The rate of royalties payable generally depends in part on prescribed reference prices, well productivity, geographical location, field discovery date, method of recovery, depth of well, and the type or quality of the petroleum product produced. Other royalties and royalty-like interests are, from time-to-time, carved out of the owner's working interest through non-public transactions. These are often referred to as overriding royalties, gross overriding royalties, net profits interests or net carried interests.
Occasionally, the governments of the western Canadian provinces create incentive programs for exploration and development. Such programs provide for royalty rate reductions, royalty holidays and tax credits, and are generally introduced when commodity prices are low. The programs are designed to encourage exploration and development activity by improving earnings and cash flow within the industry. Royalty holidays and reductions would reduce the amount of Crown royalties paid by oil and gas producers to the provincial governments and would increase the net income and funds from operations of such producers.
The Canadian federal corporate income tax rate levied on taxable income was 16.5% effective January 1, 2011 for active business income, including resource income, and decreased to 15% on January 1, 2012. The average provincial income tax rate for Suncor in 2011 was 10.69%, which is expected to decrease to 10.39% in 2014 when enacted provincial income tax rate reductions become effective.
Other Jurisdictions
Operations in the U.S are subject to the U.S. federal tax rate of 35% and various state-level taxes, primarily 4.63% in Colorado.
There are no royalties on production from the U.K. portion of the North Sea; however, the income tax rate on oil and gas profits is 62%. This rate increased from 50% effective March 23, 2011 after the U.K. government announced an increase in its supplementary charge from 20% to 32%.
52 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
Suncor earns refundable tax credits related to eligible exploration spending in Norway at a rate of 78%.
Amounts presented as royalties for production from our Libya and Syria operations are determined pursuant to PSCs. The amounts calculated reflect the difference between Suncor's working interest in the particular project and the net revenue attributable to Suncor under the terms of the PSC. All government interests in the operations, except for income taxes, are presented as royalties.
Under our EPSAs in Libya, income taxes are payable. Suncor prepares corporate income tax declarations that are processed by the NOC who, in turn, obtains a tax clearance certificate from tax authorities that is forwarded to Suncor. The NOC remits taxes on Suncor's behalf. Until tax certificates are received, Suncor records both an income tax payable to the taxation authority and an offsetting income tax receivable from the NOC.
For our PSCs in Syria, Suncor has been advised that income taxes are not payable until the Ebla project reaches payout. When payable, income taxes shall be assumed, paid and discharged on behalf of Suncor by the GPC.
Land Tenure
In Canada, petroleum, bitumen and natural gas located in the western provinces are owned predominantly by the respective provincial governments. Provincial governments grant rights to explore for and produce oil and natural gas pursuant to leases, licences, and permits for varying terms, and on conditions set forth in provincial legislation, including requirements to perform specific work or make payments. Oil and natural gas located in such provinces can also be privately owned and rights to explore for and produce such oil and natural gas are granted by lease on such terms and conditions as may be negotiated. In frontier areas of Canada, the mineral rights are primarily owned by the Canadian federal government, which, either directly or through shared jurisdiction agreements with the relevant provincial authorities, grant tenure in the form of exploration, significant discovery and production licences.
In many other international jurisdictions, petroleum and natural gas are most commonly owned by national governments that grant rights in the form of exploration licences and permits, production licences, production sharing agreements and other similar forms of tenure. In all cases, Suncor's right to explore, develop and produce petroleum and natural gas is subject to ongoing compliance with the regulatory requirements established by the relevant country.
Environmental Regulation
The company is subject to environmental regulation under a variety of Canadian, U.S., U.K., and other foreign, federal, provincial, territorial, state and municipal laws and regulations. These regulatory regimes are laws of general application that apply to us in the same manner as they apply to other international companies and enterprises in the energy industry. The regulatory regimes require us to obtain operating licences and permits in order to operate, and impose certain standards and controls on activities relating to mining, oil and gas exploration, development and production, and the refining, distribution and marketing of petroleum products and petrochemicals. Environmental assessments and regulatory approvals are generally required before initiating most new major projects or undertaking significant changes to existing operations. In addition, this legislation requires that the company abandon and reclaim well and facility sites to the satisfaction of provincial authorities and, in some cases, this burden may remain with the company even after disposition of an asset to a third party. Compliance with such legislation can require significant expenditures, and a breach of these requirements may result in suspension or revocation of necessary licences and authorizations, civil liability for pollution damage, and the imposition of material fines and penalties. In addition to these specific, known requirements, we expect future changes to environmental legislation, including anticipated legislation for air pollution (Criteria Air Contaminants) and greenhouse gas (GHG) emissions that will impose further requirements on companies operating in the energy industry.
A number of statutes, regulations and frameworks are under development or have been issued by various provincial regulators that oversee oil sands development, including the recently announced Joint Canada-Alberta Implementation Plan for Oil Sands Monitoring. These statutes, regulations and frameworks relate to such issues as tailings management, water use and land use. While the financial implications of statutes, regulations and frameworks under development are not yet known, the company is committed to working with the appropriate regulatory bodies as they develop new policies, and to fully complying with all existing and new statutes, regulations and frameworks as they apply to the company's operations.
In general, there remains uncertainty around the outcomes and impacts of climate change and environmental laws and regulations, whether currently in force or proposed laws and regulations as described herein, or future laws and regulations. It is not currently possible to predict the nature of any future requirements or the impact on the company and its business, financial condition, results of operations and cash flow at this time. We continue to actively work to mitigate our environmental impact, including taking action to reduce GHG emissions, investing in renewable forms of energy such as wind power and biofuels, persisting with land reclamation activities, installing new emissions abatement equipment and working to advance other environmental technologies such as carbon capture and sequestration.
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 53
The scope of recent environmental regulation and initiatives has had an impact on many areas important to Suncor's operations, some of which are summarized in the following subsections:
Climate Change
Suncor operates in many jurisdictions that have regulated, or have proposed to regulate, industrial GHG emissions. Those jurisdictions that have regulated GHG emissions generally support policies based on (i) caps on the intensity of GHG emissions, (ii) a carbon price, possibly through a cap-and-trade system, (iii) a tax, (iv) a hybrid of a tax and a cap-and-trade system, and (v) policies including other measures such as low carbon fuel and renewable fuel standards. Suncor participates in the consultation process for the design of proposed regulations and other efforts to harmonize regulations across jurisdictions within North America, both directly and indirectly through industry associations.
Suncor believes that the responsibility for managing environmental and climate change related issues should be a shared responsibility across the company. A comprehensive roles and responsibilities matrix has been developed as part of Suncor's GHG management program. Suncor's CEO and COO hold top executive responsibility for sustainability issues. Together with the Vice President, Sustainable Development, the business units and selected internal technical representatives are responsible for setting operational sustainability goals and assessing progress, including energy efficiency across all areas of our business.
The Environment, Health, Safety and Sustainable Development Committee of the Board of Directors meets quarterly to review Suncor's effectiveness in meeting its obligations pertaining to environment, health and safety (EHS). The committee also reviews the effectiveness with which Suncor establishes appropriate environment, health and safety policies, including GHG performance and emissions reduction plans given legal, industry and community standards. Management systems are maintained by the committee to implement such policies and ensure compliance with them.
International Climate Change Agreements and Treaties
At the end of 2009, the United Nations Framework on Climate Change Conference of the Parties (UNFCC COP 15) was held in Copenhagen, Denmark. One of the major outcomes of this conference was the Copenhagen Accord. To signify agreement with the Copenhagen Accord, Canada subsequently committed to reducing its GHG emissions by 17% below 2005 levels by 2020, in line with the reduction commitment made by the U.S. However, the Copenhagen Accord does not contain any binding commitments for reducing CO2 emissions, nor does it include any discussion of compliance mechanisms. The other focal point of the Copenhagen Accord was a commitment by all major emitting countries to provide funding, including $30 billion from 2010 to 2012, for developing countries for climate change mitigation and adaptation.
During COP 17 in Durban, South Africa, several nations, including Canada, Japan and Russia, announced their intentions not to commit to a second period under the Kyoto Protocol; however, Canada reaffirmed commitments for GHG reductions and funding under the Copenhagen Accord.
Canadian Federal GHG Regulations
The Canadian federal government has started to address emissions of specific sectors of the economy, including implementing vehicle emissions standards in line with the U.S., as well as performance standards for the thermal electrical power generating sector. Also in line with the U.S., Canada has adopted a renewable fuels standard, mandating that 5% of the gasoline supply come from renewable sources such as ethanol and that 2% of diesel supply come from bio-diesel. The Canadian federal government has stated that it will align its approach to GHG regulation with the approach of the U.S. and, in 2011, entered into preliminary discussions with the Canadian oil and gas industry on proposed regulations for the sector.
Canadian Provincial GHG Regulations
In the absence of a federal GHG emissions policy, various Canadian provinces have responded with their own GHG emissions reduction targets and passed legislation enabling regulation of large GHG emitters. Suncor will continue to engage the appropriate governmental bodies in meaningful dialogue in an effort to develop a harmonized system which focuses on achieving actual reduction goals and sustainable resource development.
In July 2007, pursuant to the Specified Gas Emitters Regulation enacted under the Climate Change and Emissions Management Act (Alberta), facilities emitting more than 100,000 tonnes of CO2 equivalent (CO2e) per year are subject to intensity limits (GHG emissions per unit of production) and are required to reduce their intensity limits by 12% from an established baseline. Five facilities operated by Suncor in Alberta (Oil Sands Base plants, MacKay River operations, Firebag operations, the Edmonton refinery and the Hanlan gas processing plant) are subject to, and continue to comply with, this legislation. In 2010, the total cost to comply with the Alberta regulations was approximately $11 million. Compliance in 2010 was achieved through reduced emissions per unit of production, purchase and retirement of offset credits and payments to Alberta's Climate Change and Emissions Management Fund (Alberta Technology Fund). In March 2012, Suncor expects to file compliance reports that show what actions the company took during 2011 to demonstrate that each facility either met its intensity target or took action to offset its emissions intensity. Compliance options available to Suncor include reducing emissions, using Alberta-sanctioned
54 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
offset projects, or contributing to the Alberta Technology Fund. For the compliance period of January 1 to December 31, 2011, the compliance costs to Suncor are estimated to be between $10 million and $15 million, based on a cost of $15/tonne, which was in effect for 2011. Future costs may be subject to change, given that late in 2011, the Specified Gas Emitters Regulation was amended by the Government of Alberta, such that the contribution cost is no longer specified at the $15/tonne level. Instead, the contribution cost will be established by Order of the Minister.
Several Canadian provinces (including British Columbia, Ontario and Quebec) are members of the Western Climate Initiative (WCI), a multi-jurisdictional partnership created in 2007 to address climate change. Effective January 1, 2010, the Greenhouse Gas Reduction Act (Cap and Trade) enabled the British Columbia government to participate in the trading system being implemented by the WCI. Draft regulations, as well as offset regulations, have been posted by the British Columbia Climate Action Secretariat, but have yet to be finalized. The Province of British Columbia also enacted a carbon tax in 2008, which began at $10/tonne of CO2e and escalates at $5/tonne per year until 2012 when it reaches its maximum of $30/tonne. This carbon tax is carbon neutral, in that revenues are recycled back to taxpayers via tax reductions and is applied on consumption. Under these regulations, Suncor's natural gas production and gathering facilities in B.C. are classified as one facility, which in aggregate exceed the 100,000 tonne threshold that requires the reporting of emissions to be verified by third parties. Suncor's refined product distribution terminals in B.C. are required to report emissions, but do not exceed the threshold that requires third-party verification.
In 2007, Quebec introduced a tax on hydrocarbon production and imports, with the revenues going into a Green Fund, to support transit and other emissions-reducing projects. This tax impacts Suncor's refining and marketing activities in the province.
During 2011, Quebec introduced regulations for a cap-and-trade system for GHG emissions. This system required Suncor to register as an emitter because the Montreal refinery produces more than 25,000 tonnes of CO2e per year. Emitters must verify their emissions during specified compliance periods (the first period commencing January 1, 2013 and ending December 31, 2014), and must either reduce their emissions or purchase eligible compliance mechanisms to cover their emissions above a specified cap. Quebec is responsible for setting the cap for the province and allocating allowances to emitters in its jurisdiction. Quebec has deemed 2012 a transition year, with no cap imposed. Allowances are fungible across the WCI, such that Quebec-issued allowances can be bought and sold with the larger trading system, which currently consists solely of Quebec and California. It is anticipated that the Green Fund will eventually be merged with the cap-and-trade system.
Ontario is also a member of the WCI and implemented mandatory reporting regulations beginning with 2010 emissions, but has delayed action on any further GHG emissions regulations.
U.S. GHG Regulations
Several attempts were made during the past two years to enact GHG legislation in the United States, none of which made it through both the Senate and the House. In an effort to build a green economy, the President has opted to push for a clean energy standard that would reduce GHG emissions from the power sector and increase the use of cleaner sources of energy, including natural gas, nuclear power and "clean" coal. In addition, the President is pressing ahead by endorsing the U.S. Environmental Protection Agency (EPA) to regulate GHG emissions under the Clean Air Act. The implications of industry being regulated under the EPA and the timing of such regulation are as yet unknown. In the meantime, the EPA has implemented a mandatory GHG reporting rule for all large (emitting greater than 25,000 tonnes per year) facilities, which includes Suncor's Commerce City refinery.
The EPA has also mandated Renewable Fuel Standards 2, which encourages ethanol blending up to 15%, from the current 10% limit. Several factors will impact the ability of refiners and producers to achieve these requirements, including the lead time required for fleet turnover, the ability of retail stations to simultaneously provide both 10% and 15% fuels, and the inherent liability for ensuring consumers use the appropriate fuel for their vehicle.
The State of California has passed AB32, which provides for a Low Carbon Fuel Standard (LCFS). In December 2011, the United States District court ruled against California's LCFS, stating that it was in violation of the Commerce Clause of the United States Constitution. Suncor does not actively market into California; however, there were two aspects of the ruling that are pertinent to Suncor the discrimination against out-of-state producers (in this case, those that are reliant on coal-fired electrical power generation for the production of ethanol), and the attempt by California to use a life-cycle analysis as the basis for the LCFS that includes exploration and production processes outside of the State's jurisdiction. The State of California has stated that it will appeal the ruling. The outcome of this appeal is anticipated during 2012.
International Regulations
Phase II (2008-2012) of the European Union Emissions Trading Scheme (EU ETS) impacts Suncor's non-operated offshore production in the U.K. and Norway sectors of the North Sea. The EU ETS requires that member countries set emissions limits for installations in their country covered by the scheme and assigns such installations an emissions cap. Installations may meet their cap by reducing emissions or by buying allowances from other participants. Phase III of the EU ETS is scheduled to begin in 2013 and will run until 2020.
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 55
Land Use
In 2011, the Government of Alberta issued its draft Lower Athabasca Regional Plan (LARP), which covers the Lower Athabasca Region and includes Suncor's Oil Sands segment. The LARP, developed as part of the Land-Use Framework under the Alberta Land Stewardship Act, identifies new conservation areas, as well as management frameworks for the quality of air, surface water and groundwater. The new conservation areas do not overlap any of Suncor's leases. The management frameworks formalize a number of regulatory tools that are already used by the government to manage environmental aspects of oil sands development, and may require Suncor to have greater participation in the evaluation of environmental issues. The frameworks include the following:
Reclamation and Tailings
In February 2009, the ERCB released Directive 74 Tailings Performance Criteria and Requirements for Oil Sands Mining Schemes. The directive establishes performance criteria for tailings operations and requirements for the approval, monitoring and reporting of tailings ponds and plans. Suncor is in the final stages of its transition from a consolidated tailings management plan to TROTM operations, which is Suncor's new tailings management strategy. TROTM was approved by the ERCB in June 2010. Suncor's mine plan is designed to facilitate the implementation of TROTM through providing space for the drying of tailings and ensuring adequate and timely storage capacity for extraction tailings from both the Millennium and NSE mines.
The Government of Alberta also has in place the Mine Financial Security Program (MFSP), which holds oil sands miners responsible for all aspects of the suspension, abandonment, remediation and surface reclamation work at their mine sites, and custody of the site until a reclamation certificate has been issued by the government. The MFSP requires a base amount of security for each project in the form of letters of credit, which would provide the funds necessary to safely secure the site. Additional security is required under other conditions, such as failure to meet current reclamation plans or when the estimated remaining production life of the mine reaches certain levels; however, Suncor has not been required to provide any additional security. In 2011, the Government of Alberta finalized changes to the MFSP, but these changes did not significantly impact Suncor's existing or near-term requirements for providing additional security.
Hydraulic Fracturing
Hydraulic fracturing is the process of pumping a fluid or a gas under pressure down a well, which causes the surrounding rock to crack or fracture. The fluid, typically consisting of water, sand, chemicals and other additives, flows into the cracks where the sand remains to keep the cracks open and allow natural gas or liquids to be recovered. Fracturing fluids are produced back to the surface through the wellbore and are stored for reuse or future disposal in accordance with regional regulations, which may include injection into underground wells.
The Government of Canada manages use of chemicals through its Chemical Management Plan and New Substances Program. Some provinces require the details of fracturing fluids to be submitted to regulators. In Alberta, the ERCB requires that all fracturing operations submit regarding the quantity of fluids and additives.
While this process has been in use and improved upon for many generations, the proliferation of fracturing in recent years to access hydrocarbons in unconventional reservoirs, such as shale formations, has raised concerns about the interaction of fracturing fluids with the water supply. In the U.S., the process is regulated by state and local governments, but the EPA is considering undertaking a broad study as it pertains to the national Clean Water Act. Any U.S. rules on hydraulic fracturing could influence other jurisdictional regulation and force oil and gas companies, including Suncor, to cease using the process or to add pollution control technology to their operations. The implications of this activity being regulated under the EPA are as yet unknown.
56 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
Industry Collaboration Initiatives
For areas of environmental concern, the need for energy companies to increase collaboration with each other, and with their respective stakeholders, is a particularly critical issue for the oil sands industry. As part of the Oil Sands Leadership Initiative (OSLI), Suncor is working closely with like-minded companies to make tangible improvements to environmental, social and economic performance in the oil sands industry. These companies have come together to pool financial resources and expertise. In 2010, members of OSLI investigated new technologies to improve industry-wide reuse of tailings waste water and to make oil recovery more energy efficient, while also engaging new stakeholders and opinion leaders.
In addition, Suncor and six other oil sands companies announced the creation of the Oil Sands Tailings Consortium in December 2010, and agreed to work together in a unified effort to advance tailings management. Each company has pledged to share its existing tailings research and technology and to remove barriers to collaborating on future tailings research and development. In turn, the companies are committing to future research investments to further accelerate tailings technology advances.
Suncor's Sustainability Commitment
Suncor remains committed to reducing overall GHG emissions intensity, in addition to other goals related to improving energy efficiency, reducing water use, increasing land reclamation and reducing air emissions. We continue to actively work to mitigate our environmental impact, including taking action to reduce GHG emissions, investing in renewable forms of energy such as wind power and biofuels, accelerating land reclamation, installing new emissions abatement equipment and pursuing other opportunities, both internally as well as through joint venture initiatives, such as our role in OSLI. For further information, please see our Sustainability Report at www.suncor.com.
RISK FACTORS
The company is committed to a proactive program of enterprise risk management intended to enable decision-making through consistent identification of risks inherent to the assets and activities of Suncor. The company's enterprise risk committee (ERC), comprised of senior representatives from business and functional groups across Suncor, oversees entity-wide processes to identify, assess and report on the company's principal risks. A principal risk is an exposure that has the potential to materially impact the ability of one of our businesses or functions to meet or support a Suncor objective.
Commodity Price Volatility
Our financial performance is closely linked to prices for crude oil in our upstream business and prices for refined petroleum products in our downstream business, and, to a lesser extent, to natural gas prices in our upstream business, where natural gas is both an input and output of production processes. The values for all of these commodity prices can be influenced by global and regional supply and demand factors.
Crude oil prices are also affected by, among other things, global economic health and global economic growth (particularly in emerging markets), political developments, compliance or non-compliance with quotas imposed on OPEC members, access to markets for crude oil and weather. These factors impact the various types of crude oil and refined products differently and can impact differentials between light and heavy grades of crude oil (including blended bitumen), and between conventional and synthetic crude oil.
Suncor anticipates higher production of non-upgraded bitumen in future years, due mainly to expansion at Firebag. Due to its low viscosity, bitumen is blended with a light diluent or SCO and sold as a heavy crude oil. The markets for heavy crude are more limited than those for light crude, making them more susceptible to supply and demand changes. Heavy crude oil receives lower market prices than light crude, due principally to the lower quality and value of the refined product yield, and the higher cost to transport the more viscous product on pipelines. The price differential between light crude and WCS is particularly important for Suncor. WCS is a pool of heavy crude oil and blended bitumen production from Western Canada. The market price for WCS is influenced by regional supply and demand factors, including the availability and price of diluent, and by the availability and cost of accessing primary markets through pipeline systems. Future price differentials are uncertain and widening light/heavy differentials could have a negative impact on our business, especially price realizations for bitumen that Suncor is unable to upgrade.
Refined petroleum product prices and refining margins are also affected by, among other things, crude oil prices, the availability of crude oil and other feedstocks, levels of refined product inventories, regional refinery availability, marketplace competitiveness, and other local market factors.
Natural gas prices in North America are affected primarily by supply and demand, and by prices for alternative energy sources. All of these factors are beyond our control and can result in a high degree of price volatility.
Commodity prices and refining margins have fluctuated widely in recent years. Given the recent global economic uncertainty, we expect continued volatility and uncertainty in commodity prices in the near term, with the possibility that crude oil and
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 57
refined petroleum products prices could revert to the low levels experienced in 2008 and 2009. A prolonged period of low prices could affect the value of our upstream and downstream assets and the level of spending on growth projects, could result in the curtailment of production on some properties and include an impairment of carrying value. Accordingly, low commodity prices, particularly for crude oil, could have a material adverse effect on Suncor's business, financial condition, results of operations and cash flow.
Government Policy
Suncor operates under federal, provincial, state and municipal legislation in numerous countries. The company is also subject to regulation and intervention by governments in oil and gas industry matters, such as land tenure, royalties, taxes (including income taxes), government fees, production rates, environmental protection controls, safety performance, the reduction of GHG and other emissions, the export of crude oil, natural gas and other products, the company's interactions with foreign governments, the awarding or acquisition of exploration and production rights, oil sands leases or other interests, the imposition of specific drilling obligations, control over the development and abandonment of fields and mine sites (including restrictions on production) and possibly expropriation or cancellation of contract rights.
Changes in government policy or regulation have a direct impact on Suncor's business, financial condition, results of operations and cash flow, as evidenced by such initiatives as the Alberta government's royalty review program in 2007, and, more recently, by trade sanctions in Libya and Syria imposed by Canadian and other international governments, and increased production taxes in the U.K. Changes in government policy or regulation can also have an indirect impact on Suncor, such as opposition to new North American pipeline systems, such as Keystone XL, or incrementally over time, through increasingly stringent environmental regulations or unfavourable income tax and royalty regimes. The result of such changes can also lead to additional compliance costs and staffing and resource levels, and also increase exposure to other principal risks of Suncor, including environmental or safety non-compliance and permit approvals.
Environmental Regulation
Changes in environmental regulation could have a material adverse effect on our business, financial condition, results of operations and cash flow by impacting the demand, formulation or quality of our products, or by requiring increased capital expenditures or distribution costs, which may or may not be recoverable in the marketplace. The complexity and breadth of changes in environmental regulation make it extremely difficult to predict the potential impact to Suncor. Management anticipates capital expenditures and operating expenses could increase in the future as a result of the implementation of new and increasingly stringent environmental regulations. Failure to comply with environmental regulation may result in the imposition of significant fines and penalties, liability for cleanup costs and damages, and the loss of important licences and permits, which may, in turn, have a material adverse effect on our business, financial condition, results of operations and cash flow.
Some of the issues that are or may in future be subject to environmental regulation include:
Climate Change Regulation
Future laws and regulations may impose significant liabilities on a failure to comply with their requirements; however, Suncor expects the cost of meeting new environmental and climate change regulations will not be so high as to cause material disadvantage to the company or material damage to its competitive positioning. While it currently appears that GHG regulations and targets will continue to become more stringent, and while Suncor will continue efforts to reduce the CO2 unit intensity of our operations, the absolute CO2 emissions of our company will continue to rise as we pursue a prudent and planned growth strategy.
58 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
As part of our ongoing business planning, Suncor assesses potential costs associated with CO2 emissions in our evaluation of future projects, based on our current understanding of pending and possible GHG regulations. Both the U.S. and Canada have indicated that climate change policies that may be implemented will attempt to balance economic, environmental and energy security concerns. In the future, we expect that regulation will evolve with a moderate carbon price signal, and that the price regime will progress cautiously. Suncor will continue to review the impact of future carbon constrained scenarios on our strategy, using a price range of $15-$45 per tonne of CO2 equivalent as a base case, applied against a range of regulatory policy options and price sensitivities.
Although Suncor does not actively market into California, the implications of other states or countries adopting similar LCFS legislation could pose a significant barrier to our exports of oil sands crude if the importing jurisdictions do not acknowledge efforts undertaken by the oil sands industry to meet the emissions intensity reductions legislated by the Government of Alberta.
In general, there remains uncertainty around the outcome and impacts of proposed or potential future climate change and other related environmental regulation. The Canadian federal government has gone on record as saying that it will align GHG emissions legislation with the U.S. Although it remains unclear what approach the U.S. will take, or when, the Canadian federal government has indicated a preference for a sector specific approach; however, it is unclear what form any regulation will take for the oil and gas sector, and what type of compliance mechanisms will be available to large emitters. At this time, the company does not believe it is possible to predict the nature of any requirements or the impact on Suncor's business, financial condition, results of operations and cash flow. The impact of developing regulations cannot be quantified at this time given the current lack of detail on how systems will operate.
Land Reclamation
There are risks associated specifically with our ability to reclaim tailings ponds containing mature fine tailings with TROTM or other methods and technologies. Suncor expects that TROTM will help the company reclaim existing tailings ponds by reducing tailings. The success of TROTM or any other methods or technology and the time to reclaim tailings ponds could increase or decrease our decommissioning and restoration cost estimates. Our failure or inability to adequately implement our reclamation plans, including our planned implementation of TROTM, could have a material adverse effect on Suncor's business, financial condition, results of operations and cash flow. In recent years, Suncor has increased collaboration with other participants in the oil sands industry to share technology and knowledge and to research alternative methods for tailings management.
Royalties
Royalties can be impacted by changes in crude oil and natural gas pricing, production volumes, foreign exchange rates, and capital and operating costs, by changes to existing legislation or PSCs, and by results of regulatory audits of prior year filings and other unexpected events. Some of the issues where settlement with regulatory bodies may cause royalties expense or royalties payable to differ materially from provisions currently recorded include:
The final determination of these matters may have a material impact on royalties payable to the respective governments and on the company's royalties expense.
Foreign Operations
The company has operations in a number of countries with different political, economic and social systems. As a result, the company's operations and related assets are subject to a number of risks and other uncertainties arising from foreign government sovereignty over the company's international operations, which may include, among other things:
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 59
If a dispute arises in the company's foreign operations, the company may be subject to the exclusive jurisdiction of foreign courts or may not be able to subject foreign persons to the jurisdiction of a court in Canada or the U.S. In addition, as a result of activities in these areas and a continuing evolution of an international framework for corporate responsibility and accountability for international crimes, the company could also be exposed to potential claims for alleged breaches of international law.
In 2011, operations in both Libya and Syria were suspended as a result of the outbreak of political unrest and the resulting sanctions imposed by international governments. Discussions with the Libyan authorities continue on the status of existing contract terms, including production volumes and exploration commitments. There is still sufficient unpredictability underlying operations in this region, including the ramp up of production, the sustainability of current production rates and the extent of damage to the company's assets, which has not yet been fully assessed. As a result, there is no assurance that production will return to previous levels or continue at current levels.
In response to sanctions and escalating political unrest in Syria, Suncor declared force majeure in December 2011, withdrew its expatriate staff and stopped recording production from Syria. Suncor's assessment of the situation as at December 31, 2011 did not require the company to record an impairment charge against its assets in Syria; however, should the current situation persist or worsen, such that Suncor is unable to resume operations in the near term, the company believes its assets in Syria could be impaired in the future. There is no assurance as to when Suncor's production from Syrian assets will resume or return to previous levels. Suncor's operations in Syria represented approximately 3% of the company's consolidated net earnings and 3% of the company's cash flow from operations in 2011. The carrying value of Suncor's net assets in Syria at December 31, 2011 was approximately $900 million.
The impact that future potential terrorist attacks, regional hostilities or political violence may have on the oil and gas industry, and on our operations in particular, is not known at this time. This uncertainty may affect operations in unpredictable ways, including disruptions of fuel supplies and markets, particularly crude oil, and the possibility that infrastructure facilities, including pipelines, production facilities, processing plants and refineries, could be direct targets of, or collateral damage of, an act of terror, political violence or war. We may be required to incur significant costs in the future to safeguard our assets against terrorist activities or to remediate potential damage to our facilities. There can be no assurance that we will be successful in protecting ourselves against these risks and the related financial consequences.
EHS Regulatory Non-Compliance
The company is required to comply with a large number of EHS regulations under a variety of Canadian, U.S., U.K. and other foreign, federal, provincial, territorial, state and municipal laws and regulations, as described in the Industry Conditions Environmental Regulation section of this AIF. Failure to comply with these regulations may result in the imposition of fines and penalties, censure, liability for cleanup costs and damages, and the loss of important licences and permits, which could also have a material adverse effect on our business, financial condition, results of operations and cash flow. Compliance can be affected by the loss of skilled staff, inadequate internal processes and compliance auditing.
Operational Outages and Major Environmental or Safety Incidents
Each of our primary operating businesses Oil Sands, Exploration and Production, and Refining and Marketing demand significant levels of investment in the design, operation and maintenance of facilities, and, therefore, carry the additional economic risk associated with operating reliably or enduring a protracted operational outage. These businesses also carry the risks associated with environmental and safety performance, which is closely scrutinized by governments, the public and the media, and could result in a suspension of or inability to obtain regulatory approvals and permits, or, in the case of a major environmental or safety incident, civil suits or charges against the company.
Generally, our operations are subject to operational hazards and risks such as fires, explosions, blow-outs, power outages, severe winter climate conditions, and the migration of harmful substances such as oil spills, gaseous leaks, or a release of tailings into water systems, any of which can interrupt operations or cause personal injury or death, or damage to property, equipment, the environment, and information technology systems and related data and control systems.
The reliable operation of production and processing facilities at planned levels and our ability to produce higher value products can also be impacted by failure to follow operating procedures or operate within established operating parameters, equipment failure through inadequate maintenance, unanticipated erosion or corrosion of facilities, manufacturing and engineering flaws, and labour shortage or interruption. We are also subject to operational risks such as sabotage, terrorism, trespass, theft and malicious software or network attacks.
60 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
The efficient operation of our business is dependent on computer hardware and software systems. Information systems are vulnerable to security breaches by computer hackers and cyberterrorists. We rely on industry accepted security measures and technology to securely maintain confidential and proprietary information stored on our information systems. However, these measures and technology may not adequately prevent security breaches. In addition, the unavailability of the information systems or the failure of these systems to perform as anticipated for any reason could disrupt our business and could result in decreased performance and increased operating costs, causing our business and results of operations to suffer. Any significant interruption or failure of our information systems or any significant breach of security could adversely affect our business and results of operations.
In addition, all of our operations are subject to all of the risks connected with transporting, processing and storing crude oil, natural gas and other related products. Pipeline capacity constraints combined with plant capacity constraints could negatively impact our ability to produce at capacity levels. Disruptions in pipeline service could adversely affect commodity prices, Suncor's price realizations, refining operations and sales volumes, or limit our ability to deliver production. These interruptions may be caused by the inability of the pipeline to operate or by the oversupply of feedstock into the system that exceeds pipeline capacity. There can be no certainty that short-term operational constraints on pipeline systems arising from pipeline interruption and/or increased supply of crude oil will not occur. In addition, planned or unplanned shutdowns or closures of our refinery customers may limit our availability to deliver feedstock. All of these events could have negative implications on sales and cash from operating activities.
For Suncor's Oil Sands operations, mining oil sands ore, extracting bitumen from mined ore, producing bitumen through in situ methods, and upgrading bitumen into SCO and other products involve particular risks and uncertainties. Oil Sands operations are susceptible to loss of production, slowdowns, shutdowns or restrictions on our ability to produce higher value products, due to the interdependence of its component systems. Through growth projects, we expect to further mitigate adverse impacts of interdependent systems and to reduce the production and cash flow impacts of complete plant-wide shutdowns. For example, Suncor has two upgrader facilities that include three secondary upgrading units, which provide us with the flexibility to conduct periodic planned maintenance events on one facility while continuing production from the other.
For Suncor's upstream businesses, there are risks and uncertainties associated with drilling for oil and natural gas, the operation and development of such properties and wells (including encountering unexpected formations, pressures, ore grade qualities, or the presence of H2S), premature declines of reservoirs, sour gas releases, uncontrollable flows of crude oil, natural gas or well fluids, other accidents, and pollution and other environmental risks.
Our Exploration and Production operations include drilling offshore of Newfoundland and Labrador and in the North Sea offshore of the U.K. and Norway, which are areas subject to hurricanes and other extreme weather conditions. Drilling rigs in these regions may be exposed to damage or total loss by these storms, some of which may not be covered by insurance. The consequence of catastrophic events, such as blow-outs, occurring in offshore operations can be more difficult and time-consuming to remedy. The occurrence of these events could result in the suspension of drilling operations, damage to or destruction of the equipment involved and injury or death of rig personnel. Successful remediation of these events may be adversely affected by the water depths, pressures and cold temperatures encountered in the ocean, shortages of equipment and specialists required to work in these conditions, or the absence of appropriate technology to resolve the event. Damage to the environment, particularly through oil spillage or extensive, uncontrolled fires or death, could result from these offshore operations. Our offshore operations could also be affected by the actions of our contractors and agents that could result in similar catastrophic events at their facilities, or could be indirectly affected by catastrophic events occurring at other third-party offshore operations. In either case, this could give rise to liability, damage to our equipment, harm to individuals, force a shutdown of our facilities or operations, or result in a shortage of appropriate equipment or specialists required to perform our planned operations.
In particular, East Coast Canada operations can be impacted by winter storms, pack ice, icebergs and fog. During the winter storm season (October to March), we may have to reduce production rates at our offshore facilities as a result of limited storage capacity and the inability to offload to shuttle tankers due to wave height restrictions. During the spring, pack ice and icebergs drifting in the area of our offshore facilities have resulted in precautionary shut in of FPSO production and drilling delays. In late spring and early summer, fog also impacts our ability to transfer personnel to the offshore facilities by helicopter.
Our Refining and Marketing operations are subject to all of the risks normally inherent in the operation of refineries, terminals, pipelines and other distribution facilities and service stations, including loss of product, slowdowns due to equipment failures, unavailability of feedstock, price and quality of feedstock or other incidents.
Losses resulting from the occurrence of any of these risks identified above could have a material adverse effect on Suncor's business, financial condition, results of operations and cash flow. Although we maintain a risk management program, which includes an insurance component, such insurance may not provide adequate coverage in all circumstances, nor are all such risks insurable. It is possible that our insurance coverage will not be sufficient to address the costs arising out of the allocation of liabilities and risk of loss arising from offshore operations. Suncor also has a captive insurance entity to provide additional business interruption coverage for potential losses.
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 61
Project Execution and Partner Risk
There are certain risks associated with the execution of our major projects and the commissioning and integration of new facilities within our existing asset base, the occurrence of which could have a material adverse effect on Suncor's business, financial condition, results of operations and cash flow.
Project execution risk consists of three related primary risks:
Management believes the execution of major projects presents issues that require prudent risk management. Suncor may provide cost estimates for major projects at the conceptual stage, prior to commencement or completion of the final scope design and detailed engineering necessary to reduce the margin of error of such cost estimates. Accordingly, actual costs can vary from estimates, and these differences can be material. Project execution can also be impacted by:
Other entities operate a portion of the assets in which Suncor has ownership interests. Suncor's dependence on its partners the operator and other working interest owners for these assets and its limited ability to influence operations and associated costs could materially adversely affect Suncor's business, financial condition, results of operations and cash flow. The success and timing of Suncor's activities on assets operated by others depend upon a number of factors that are outside of Suncor's control, including the timing and amount of capital expenditures, the timing and amount of operational and maintenance expenditures, the operator's expertise, financial resources and risk management practices, the approval of other participants, and the selection of technology.
These partners may have objectives and interests that do not coincide with and may conflict with Suncor's interests. Major capital decisions affecting jointly owned assets may require agreement among the partners, while certain operational decisions may be made solely at the discretion of the operator of the applicable assets. While the partners generally seek consensus with respect to major decisions concerning the direction and operation of the assets, no assurance can be provided that the future demands or expectations of either party relating to such assets will be met satisfactorily or in a timely manner. Failure to satisfactorily meet demands or expectations by either party may affect our participation in the operation of such assets, our ability to obtain or maintain necessary licences or approvals, or the timing for undertaking various activities.
Corporate Reputation
The public perception of integrated oil and gas companies and their operations may pose issues related to development and operating approvals or market access for products, which may have a material adverse effect on Suncor's business, financial condition, results of operations and cash flow.
Development of the oil sands has figured prominently in recent political, media and activist commentary on the subjects of pipeline transportation, climate change, GHG emissions, water usage and environmental damage, which may directly or indirectly harm the profitability of our current oil sands projects and the viability of future oil sands projects in a number of ways, including:
62 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
Concerns such as those raised above may also harm our corporate reputation and limit our ability to transport our products or access land and joint venture opportunities in other jurisdictions throughout the world. Investors may respond by applying a discount to Suncor's shares, thereby diminishing the company's value, or may hinder Suncor in its ability to influence government policy.
Permit Approvals
Before proceeding with most major projects, including significant changes to existing operations, Suncor must obtain various federal, provincial or state permits and regulatory approvals. Suncor must also obtain licences to operate certain assets. These processes can involve, among other things, stakeholder consultation, environmental impact assessments and public hearings, and may be subject to conditions, including security deposit obligations and other commitments. Suncor can also be indirectly impacted by a third party's inability to obtain regulatory approval for a shared infrastructure project.
Failure to obtain regulatory approvals, or failure to obtain them on a timely basis or on satisfactory terms, could result in delays, abandonment or restructuring of projects and increased costs, all of which could have a material adverse effect on Suncor's business, financial condition, results of operations and cash flow.
Skills and Resource Shortage
The successful operation of Suncor's businesses and our ability to expand operations will depend upon the availability of, and competition for, skilled labour and materials supply. There is a risk that we may have difficulty sourcing the required labour for current and future operations. The risk could manifest itself primarily through an inability to recruit new staff without a dilution of talent, to train, develop and retain high quality and experienced staff without unacceptably high attrition, and to satisfy an employee's work/life balance and desire for competitive compensation. The labour market in Alberta is particularly tight due to the growth of the oil sands industry and higher crude oil prices. The increasing age of our existing workforce adds further pressure to this situation. Materials may also be in short supply due to smaller labour forces in many manufacturing operations. Our ability to operate safely and effectively and complete all our projects on time and on budget has the potential to be significantly impacted by these risks.
Change Capacity
In order to achieve Suncor's business objectives, the company must operate efficiently, reliably and safely, and, at the same time, deliver growth and sustaining projects safely, on budget and on schedule. The ability to balance these two sets of objectives is critically important to Suncor to deliver value to shareholders and stakeholders. These objectives demand a large number of improvement initiatives that compete for resources, and may negatively impact the company should there be inadequate screening of project requests or consideration of the cumulative impacts of prior and parallel initiatives on people, processes and systems. There is a risk that these objectives may exceed Suncor's capacity to adopt and implement change.
Cost Management
Production from oil sands through mining, upgrading and in situ recovery is, relative to most major conventional hydrocarbon reserves, a higher cost resource to develop and produce. There is also a perception among many stakeholders that the oil sands industry, including Suncor, has little ability to control costs. Suncor is exposed to the risks of growing or uncontrollable operating costs, which could reduce profitability and cash flow that might otherwise be directed towards growth or dividends, and major project capital costs, which could constrain Suncor's ability to execute high quality projects that deliver lower operating costs. Factors contributing to these risks include, but are not limited to, the skills and resource shortage, the long-term success of existing and new in situ technologies, and the geology and reserves characterization of in situ reserves that can lead to higher SORs and lower production.
Exchange Rate Fluctuations
Our audited Consolidated Financial Statements are presented in Canadian dollars. The majority of Suncor's revenues from the sale of oil and natural gas are based on prices that are determined by, or referenced to, U.S. dollar benchmark prices, while the majority of Suncor's expenditures are realized in Canadian dollars. The company also holds substantial amounts of U.S. dollar debt. Suncor's results, therefore, can be affected significantly by the exchange rates between the Canadian dollar and the U.S. dollar. The company also undertakes operations administered through international subsidiaries, and so, to a lesser extent, Suncor's results can be affected by the exchange rates between the Canadian dollar and the euro, and the Canadian dollar and the British pound. These exchange rates may vary substantially and may give rise to favourable or unfavourable foreign currency exposure, which could have a material adverse effect on Suncor's business, financial condition, results of operations and cash flow.
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 63
Reliance on Key Personnel
Our success, in a large measure, is dependent on certain key personnel. The loss of services from such key personnel could have a material adverse effect on the company. The contributions of the existing management team to the immediate and near-term operations of the company are likely to continue to be of central importance for the foreseeable future. In addition, the competition for qualified personnel in the oil and natural gas industry is intense, and there can be no assurance that we will be able to continue to attract and retain all personnel necessary for the development and operation of our business.
Labour Relations
Hourly employees at our Oil Sands facilities near Fort McMurray, Alberta, all of our refineries, certain of our lubricants operations, certain of our terminalling and distribution operations, and our Terra Nova FPSO are represented by labour unions or employee associations. Approximately 36% of our employees are members of the Communications, Energy and Paperworkers Union. Any work interruptions involving our employees, contract trades utilized in our projects or operations, or any joint venture facilities operated by another entity could have a material adverse effect on Suncor's business, financial condition, results of operations and cash flow.
Dependence on Oil Sands Business
Our significant capital commitment to further our growth projects and sustain operations at our Oil Sands business may require us to forego investment opportunities in other segments of our operations. The completion of future projects to increase production at our Oil Sands business will further increase our dependence on the Oil Sands business.
Uncertainty of Reserves and Resources Estimates
The reserves and contingent resources estimates included in this AIF represent estimates only. There are numerous uncertainties inherent in estimating quantities and quality of these proved and probable reserves and contingent resources, including many factors beyond our control. In general, estimates of economically recoverable reserves and the future net cash flow from these assets are based upon a number of variable factors and assumptions, such as historical production from the properties, the assumed effect of regulation by governmental agencies, pricing assumptions, the timing and amount of capital expenditures, future royalties, future operating costs, and yield rates for upgraded production of synthetic crude oil from bitumen all of which may vary considerably from actual results. The accuracy of any reserves and resources estimates is a matter of interpretation and judgment and is a function of the quality and quantity of available data, which may have been gathered over time.
Reserves and resources estimates are based upon a geological assessment, including drilling and laboratory tests. Mining reserves and resources estimates also consider production capacity and upgrading yields, mine plans, operating life and regulatory constraints. In Situ reserves and resources estimates are also based upon the testing of core samples and seismic operations, trends of well performance, and demonstrated commercial success of in situ processes. Our actual production, revenues, royalties, taxes, and development and operating expenditures with respect to our reserves will vary from such estimates, and such variances could be material. Production performance subsequent to the date of the estimate may justify revision, either upward or downward, if material.
The reserves evaluations are based in part on the assumed success of activities we intend to undertake in future years. The reserves and estimated cash flow to be derived from the reserves contained in the reserves evaluations will be reduced to the extent that such activities do not achieve the level of success assumed in the reserves evaluations. The reserves evaluations are effective as of a specific effective date and have not been updated, and thus do not reflect changes in our reserves since that date.
For these reasons, estimates of the economically recoverable reserves and resources attributable to any particular group of properties, and classification of such reserves and resources based on the risk of recovery, prepared by different engineers or by the same engineers at different times, may vary.
Need to Replace Conventional Reserves
In our Exploration and Production business, conventional oil and natural gas reserves and future production are highly dependent on the successful discovery or acquisition of additional reserves, without which production rates will decline as reserves are depleted. Decline rates will vary with the nature of the reservoir, the life cycle of the well and other factors, and are not necessarily indicative of future performance. Exploring for, developing and acquiring reserves is highly capital intensive. To the extent the company is unable to generate sufficient capital and/or external sources of capital become limited or unavailable, our ability to make the necessary capital investments to maintain and expand our conventional oil and natural gas reserves could be constrained. In addition, the long-term performance of the Exploration and Production business is dependent on our ability to consistently and competitively find and develop low cost, high quality reserves that can be brought on-stream economically.
64 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
In Situ Recovery and Other Technology Risk
There are risks associated with growth and other capital projects that rely largely or partly on new technologies and the incorporation of such technologies into new or existing operations, particularly as the results of the application of new technologies may differ from simulated or test environments. The success of projects incorporating new technologies, such as in situ technology, cannot be assured.
Current SAGD technologies for in situ recovery of heavy oil and bitumen are energy intensive, requiring significant consumption of natural gas and other fuels in the production of the steam used in the recovery process. The amount of steam required in the production process can also vary and impact costs. The performance of the reservoir can also impact the timing and levels of production using this technology. While SAGD technology is now being used by several producers in the industry, commercial application of this technology is still in the early stages relative to other methods of production and, accordingly, in the absence of an extended operating history, there can be no assurances with respect to the sustainability of SAGD operations.
Energy Trading and Risk Management Activities and the Exposure to Counterparties
The nature of energy trading and risk management activities, which may make use of hedging and derivative financial instruments, creates exposure to significant financial risks, which include, but are not limited to, the following:
In the normal course of business, the company enters into contractual relationships with counterparties in the energy industry and other industries, including counterparties for interest rate, foreign exchange and commodity hedging arrangements. If such counterparties do not fulfil their contractual obligations, the company may suffer losses, may have to proceed on a sole risk basis, may have to forego opportunities or may have to relinquish leases or blocks.
Suncor has adopted a Trading Risk Management Policy (the Trading Policy), which requires all trading activities to occur in the group responsible for trading, so that trading risks can be properly monitored, controlled and reported. The Board has set the trading commodities, trading term limits, value-at-risk limits and stop-loss limits under the Trading Policy. Any changes to the foregoing require Board approval. The Board reviews and monitors Suncor's compliance with the Trading Policy through the Audit Committee, which receives a quarterly report that summarizes Suncor's trading activities and provides an assessment of Suncor's financial exposure to risk from these activities.
To reduce exposure to unfavourable movements in commodity prices, interest rates and foreign exchange rates, the company also periodically enters into contracts involving derivative financial instruments. The terms of these contracts or instruments may limit the benefit of favourable changes in commodity prices, interest rates and currency values and may result in financial or opportunity loss due to delivery commitments, royalty rates and counterparty risks associated with the contracts.
While the company limits its exposure to any one counterparty to a level that management deems to be reasonable, losses due to counterparties failing to fulfil their contractual obligations may have a material adverse effect on Suncor's business, financial condition, results of operations and cash flow.
Control Environment
Based on their evaluation as of December 31, 2011, our chief executive officer and chief financial officer concluded that our disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the United States Securities Exchange Act of 1934 (the Exchange Act)) are effective to ensure that information required to be disclosed by us in reports that we file or submit to Canadian and U.S. securities authorities is recorded, processed, summarized and reported within the time periods specified in Canadian and U.S. securities laws. In addition, as of December 31, 2011, there were no changes in our internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) to 15d-15(f)) that occurred during the year ended December 31, 2011 that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting. We will continue to periodically evaluate our disclosure controls and procedures and internal control over financial reporting and will make any modifications from time-to-time as deemed necessary.
Based on their inherent limitations, disclosure controls and procedures and internal controls over financial reporting may not prevent or detect misstatements, and even those controls determined to be effective can provide only reasonable assurance with respect to financial statement preparation and presentation.
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 65
Dividends
Our payment of future dividends on our common shares will be dependent on, among other things, our financial condition, results of operations, cash flow, the need for funds to finance ongoing operations, debt covenants and other business considerations as the company's Board considers relevant. There can be no assurance that we will continue to pay dividends in the future, at current levels, or at all.
Interest Rate Risk
We are exposed to fluctuations in short-term Canadian and U.S. interest rates as Suncor maintains a portion of its debt capacity in revolving and floating rate bank facilities and commercial paper, and invests surplus cash in short-term debt instruments. We are also exposed to interest rate risk when debt instruments are maturing and require refinancing, or when new debt capital needs to be raised.
Capital Markets
Suncor expects that future capital expenditures will be financed out of cash generated from operations and borrowings. This ability is dependent on, among other factors, commodity prices, the overall state of the capital markets and investor appetite for investments in the energy industry generally and our securities in particular.
The market events and conditions witnessed over the past several years, including disruptions in international credit markets and other financial systems and the deterioration of global economic conditions, have caused significant volatility in commodity prices and increases in the rates at which we are able to borrow funds for our capital programs. The continued uncertainty in the global economic situation means that the company, along with all other oil and gas entities, may continue to face restricted access to capital and increased borrowing costs. To the extent that external sources of capital become limited or unavailable or available on unfavourable terms, our ability to make capital investments and maintain existing properties may be constrained, and, as a result, Suncor's business, financial condition, results of operations and cash flow may be materially adversely affected.
At December 31, 2011, we had approximately $4.4 billion of unused credit available under bank credit facilities. Based on current cash and cash equivalents balances and expected cash from operations, we believe that we have sufficient funds available to fund our planned capital expenditures for 2012. If cash flow from operations is lower than expected, if capital expenditures in 2012 exceed current estimates, or if we incur major unanticipated expenses related to the development or maintenance of our existing assets, Suncor may need to re-evaluate its capital program or seek additional capital. Choosing not to obtain the financing necessary for our capital expenditure plans may result in a delay in the planned development of production from our operations and strand significant capital, while increasing costs to keep projects in safe mode. Choosing to seek additional capital might adversely affect our credit ratings. Either of these events could have a material adverse effect on Suncor's business, financial condition, results of operations and cash flow.
Issuance of Debt and Debt Covenants
From time-to-time, we may finance capital expenditures in whole or in part with debt, which may increase our debt levels above industry standards for oil and gas companies of similar size. Depending on future development plans, we may require additional debt financing that may not be available or, if available, may not be available on favourable terms, including higher interest rates and fees. Neither the company's articles nor its bylaws limit the amount of indebtedness that we may incur; however, we are subject to covenants in our existing bank facilities and seek to avoid an unfavourable cost of debt. The level of our indebtedness, from time-to-time, could impair our ability to obtain additional financing on a timely basis to take advantage of business opportunities that may arise and could negatively affect our credit ratings, which could have a material adverse effect on Suncor's business, financial condition, results of operations and cash flow.
Suncor currently has $5.8 billion in credit facilities, the majority of which matures in 2016, with the remainder maturing in 2013 or on demand. At December 31, 2011, Suncor's total debt was $10.8 billion. We are required to comply with financial and operating covenants under these credit facilities and debt securities. We routinely review the covenants based on actual and forecast results and have the ability to make changes to our development plans, capital structure and/or dividend policy to comply with covenants under the credit facilities. If Suncor does not comply with the covenants under its credit facilities and debt securities, repayment could be required and/or the company's access to capital could be restricted or only be available on unfavourable terms, all of which could have a material adverse effect on Suncor's business, financial condition, results of operations and cash flow.
Suncor's debt instruments are rated by various credit rating agencies. These ratings affect Suncor's ability to gain access to reasonably priced debt financing. If any of Suncor's credit rating agencies downgrade Suncor's debt instruments, it may restrict Suncor's ability to issue debt and may also increase the cost of borrowing, including under existing credit facilities.
Rating agencies regularly evaluate the company and our subsidiaries. Their ratings of our long-term and short-term debt are based on a number of factors, including our financial strength, as well as factors not entirely within our control, including conditions affecting the oil and gas industry generally, and the wider state of the economy. We cannot be assured that one or
66 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
more of our credit ratings will not be downgraded. Our borrowing costs and ability to raise funds are directly impacted by our credit ratings. In addition, credit ratings may be important to customers or counterparties when we compete in certain markets and when we seek to engage in certain transactions, including transactions involving over-the-counter derivatives.
It is our objective to maintain high quality credit ratings appropriate for our business activities. A credit-rating downgrade could potentially limit our access to private and public credit markets and increase the costs of borrowing under existing facilities. A reduction in our credit ratings also could have a significant impact on certain trading revenues, particularly in those businesses where counterparty creditworthiness is critical. It could trigger collateralization requirements related to physical and financial derivative liabilities with certain marketing counterparties and facility construction contracts. The occurrence of any of the foregoing could adversely affect our ability to execute portions of our business strategy and could have a material adverse effect on our liquidity and capital position.
Competition
The global petroleum industry is highly competitive in many aspects, including the exploration for and the development of new sources of supply, the acquisition of crude oil and natural gas interests, and the refining, distribution and marketing of refined petroleum products. We compete in virtually every aspect of our business with other energy companies. The petroleum industry also competes with other industries in supplying energy, fuel and related products to consumers. We believe the primary competition for our crude oil production is other major international oil and natural gas producers and integrated companies.
For Suncor's Oil Sands segment, a number of other companies have entered, or have indicated their intention to enter, the oil sands business and begin producing bitumen and SCO, or expand their existing operations. It is difficult to assess the number, level of production and ultimate timing of all potential new projects or when existing production levels may increase. During recent years, a global focus on the oil sands through increasing industry consolidation that has created competitors with financial capacity has significantly increased the supply of bitumen, SCO and heavy crude oil in the marketplace and increased land values and the number of new oil sands leases available. The impact of this level of activity on regional infrastructure, including pipelines, has placed stress on the availability and cost of all resources required to build and run new and existing oil sands operations.
For Suncor's Refining and Marketing businesses, management expects that fluctuations in demand for refined products, margin volatility and overall marketplace competitiveness will continue. In addition, to the extent that our downstream business unit participates in new product markets, it could be exposed to margin risk and volatility from either cost and/or selling price fluctuations.
Land Claims
First Nations people have claimed Aboriginal title and rights to portions of Western Canada. In addition, First Nations people have filed claims against industry participants relating in part to land claims, which may affect our business. At the present time, we are unable to assess the effect, if any, that these land claims may have on our business.
DIVIDENDS
Suncor's Board of Directors has established a policy of paying dividends on a quarterly basis. We review our dividend policy from time-to-time with regard to our financial position, financing requirements for growth, cash flow and other factors which our Board of Directors considers relevant. The company's Board approved an increase in the quarterly dividend to $0.11 per share from $0.10 per share in the second quarter of 2011. Dividends are paid subject to applicable law, if, as and when declared by the Board. The following table sets forth the amount of dividends we paid per common share to shareholders during the last three years.
Year ended December 31 | 2011 | 2010 | 2009 | ||||
Cash dividends per common share ($) | 0.43 | 0.40 | 0.30 | ||||
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 67
DESCRIPTION OF CAPITAL STRUCTURE
The company's authorized share capital is comprised of an unlimited number of common shares, an unlimited number of preferred shares issuable in series designated as senior preferred shares, and an unlimited number of preferred shares issuable in series designated as junior preferred shares.
As at December 31, 2011, there were 1,558,636,368 common shares issued and outstanding. To the knowledge of the Board of Directors and executive officers of Suncor, no person beneficially owns, or exercises control or direction over, securities carrying 10% or more of the voting rights attached to any class of voting securities of the company. The holders of common shares are entitled to attend all meetings of shareholders and vote at any such meeting on the basis of one vote for each common share held. As no senior preferred shares or junior preferred shares are issued and outstanding, common shareholders are entitled to receive any dividend declared by the company's Board on the common shares and to participate in a distribution of the company's assets among its shareholders for the purpose of winding up its affairs. The holders of the common shares shall be entitled to share equally, share for share, in all distributions of such assets.
Petro-Canada Public Participation Act
The Petro-Canada Public Participation Act requires that the Articles of Suncor include certain restrictions on the ownership and voting of voting shares of the company. The common shares of Suncor are voting shares. No person, together with associates of that person, may subscribe for, have transferred to that person, hold, beneficially own or control otherwise than by way of security only, or vote in the aggregate, voting shares of Suncor to which are attached more than 20% of the votes attached to all outstanding voting shares of Suncor. Additional restrictions include provisions for suspension of voting rights, forfeiture of dividends, prohibitions against share transfer, compulsory sale of shares, and redemption and suspension of other shareholder rights. The company's Board may at any time require holders of, or subscribers for, voting shares, and certain other persons, to furnish statutory declarations as to ownership of voting shares and certain other matters relevant to the enforcement of the restrictions. Suncor is prohibited from accepting any subscription for, and issuing or registering a transfer of, any voting shares if a contravention of the individual ownership restrictions results.
Suncor's Articles, as required by the Petro-Canada Public Participation Act, also include provisions requiring Suncor to maintain its head office in Calgary, Alberta; prohibiting Suncor from selling, transferring or otherwise disposing of all or substantially all of its assets in one transaction, or several related transactions, to any one person or group of associated persons, or to non-residents, other than by way of security only in connection with the financing of Suncor; and requiring Suncor to ensure (and to adopt, from time-to-time, policies describing the manner in which Suncor will fulfil the requirement to ensure) that any member of the public can, in either official language of Canada (English or French), communicate with and obtain available services from Suncor's head office and any other facilities where Suncor determines there is significant demand for communication with, and services from, that facility in that language.
Credit Ratings
The following information regarding the company's credit ratings is provided as it relates to the company's cost of funds and liquidity and indicates whether or not the company's credit ratings have changed. In particular, the company's ability to access unsecured funding markets and to engage in certain collateralized business activities on a cost-effective basis is primarily dependent upon maintaining competitive credit ratings. A lowering of the company's credit rating may also have potentially adverse consequences for the company's funding capacity for growth projects or access to the capital markets, may affect the company's ability, and the cost, to enter into normal course derivative or hedging transactions and may require the company to post additional collateral under certain contracts.
The following table shows the ratings issued by the rating agencies noted therein as of December 31, 2011. The credit ratings are not recommendations to purchase, hold or sell the debt securities inasmuch as such ratings do not comment as to the market price or suitability for a particular investor. Any rating may not remain in effect for any given period of time or may be revised or withdrawn entirely by a rating agency in the future if, in its judgment, circumstances so warrant.
Senior Unsecured |
Outlook | Cdn$ Commercial Paper |
US$ Commercial Paper |
||||||
Standard & Poor's (S&P) | BBB+ | Stable | A-1 (low) | A-2 | |||||
Dominion Bond Rating Service (DBRS) | A (low) | Stable | R-1 (low) | Not rated | |||||
Moody's Investors Service (Moody's) | Baa2 | Positive | Not rated | P-2 | |||||
S&P credit ratings on long-term debt are on a rating scale that ranges from AAA to D, representing the range of such securities rated from highest to lowest quality. A rating of BBB by S&P is the fourth highest of 10 categories and indicates that the obligor had adequate capacity to meet its financial commitments. However, adverse economic conditions or changing circumstances are more likely to lead to a weakened capacity of the obligor to meet its financial commitment on the obligation. The addition
68 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
of a plus (+) or minus (-) designation after the rating indicates the relative standing within a particular rating category. S&P credit ratings on commercial paper are on a short-term debt rating scale that ranges from A-1 (High) to C, representing the range of such securities rated from highest to lowest quality. A rating of A-1 (low) by S&P is the third highest of seven categories, with a (low) designation after the rating indicating a slightly higher susceptibility to the adverse effects of changes in circumstances and economic conditions, although the obligor's capacity to meet its financial commitment on the obligation is satisfactory. Obligations rated A-1 (low) on the Canadian commercial paper rating scale qualify for a rating of A-2 on the S&P global short-term rating scale. A rating of A-2 by S&P means the obligor is somewhat more susceptible to the adverse effects of changes in circumstances and economic conditions than the A-1 rating, but the obligor's capacity to meet its financial commitment is satisfactory.
DBRS credit ratings on long-term debt are on a rating scale that ranges from AAA to D, representing the range of such securities rated from highest to lowest. A rating of A by DBRS is the third highest of 10 categories and is assigned to debt securities considered to be of good credit quality, with the capacity for the payment of financial obligations being substantial, but of a lesser credit quality than an AA rating. Entities in the A category may be vulnerable to future events, but qualifying negative factors are considered manageable. All rating categories other than AAA and D also contain designations for (high) and (low). The absence of either a (high) or (low) designation indicates the rating is in the middle of the category. The assignment of a (high) or (low) designation within a rating category indicates relative standing within that category. DBRS's credit ratings on commercial paper are on a short-term debt rating scale that ranges from R-1 (high) to D, representing the range of such securities rated from highest to lowest quality. A rating of R-1 (low) by DBRS is the third highest of 10 categories and is assigned to debt securities considered to be of good credit quality. The capacity for the payment of short-term financial obligations as they become due is substantial, with overall strength not as favourable as higher rating categories. Entities in this category may be vulnerable to future events, but qualifying negative factors are considered manageable. Certain commercial paper categories are further denoted by (high), (medium) and (low) designations.
Moody's credit ratings are on a long-term debt rating scale that ranges from AAA to C, which represents the range from highest to lowest quality of such securities rated. A rating of Baa by Moody's is the fourth highest of nine categories. Obligations rated Baa are subject to moderate credit risk. They are considered medium grade and, as such, may possess certain speculative characteristics. For certain ratings, Moody's appends numerical modifiers 1, 2 or 3 to each generic rating classification. The modifier 1 indicates that the obligation ranks in the higher end of its generic rating category; the modifier 2 indicates a mid-range ranking; and the modifier 3 indicates a ranking in the lower end of that generic rating category. A rating of P-2 by Moody's for commercial paper is the second highest of four rating categories and indicates a strong ability to repay short-term obligations.
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 69
Our common shares are listed on the TSX in Canada, and on the NYSE in the U.S. The price ranges and the volumes traded on the TSX and NYSE for the year ended December 31, 2011, are as follows:
TSX
Price Range (Cdn$) |
Trading Volume | ||||||
High | Low | (000's) | |||||
2011 | |||||||
January | 41.73 | 36.31 | 86 963 | ||||
February | 47.27 | 39.64 | 113 291 | ||||
March | 47.09 | 39.91 | 114 219 | ||||
April | 44.78 | 40.61 | 78 958 | ||||
May | 44.56 | 37.94 | 97 689 | ||||
June | 40.70 | 36.31 | 88 738 | ||||
July | 39.60 | 36.35 | 64 996 | ||||
August | 36.81 | 28.71 | 152 854 | ||||
September | 31.56 | 25.61 | 130 795 | ||||
October | 33.10 | 23.97 | 124 137 | ||||
November | 33.75 | 28.07 | 110 485 | ||||
December | 31.87 | 27.30 | 98 747 | ||||
NYSE
Price Range (US$) |
Trading Volume | ||||||
High | Low | (000's) | |||||
2011 | |||||||
January | 41.67 | 36.54 | 137 363 | ||||
February | 47.62 | 40.01 | 182 199 | ||||
March | 48.53 | 40.25 | 179 965 | ||||
April | 46.84 | 41.93 | 111 993 | ||||
May | 47.00 | 38.76 | 158 992 | ||||
June | 41.95 | 36.93 | 131 743 | ||||
July | 41.88 | 37.96 | 111 901 | ||||
August | 39.69 | 29.00 | 220 108 | ||||
September | 32.39 | 24.94 | 167 997 | ||||
October | 33.40 | 22.55 | 176 408 | ||||
November | 33.27 | 27.06 | 149 786 | ||||
December | 31.45 | 26.30 | 120 119 | ||||
For information in respect of options to purchase common shares of Suncor and common shares issued upon the exercise of options and pursuant to our dividend reinvestment plan in 2011, see the Share Capital note to the 2011 audited Consolidated Financial Statements, which is incorporated by reference into this AIF.
70 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
DIRECTORS AND EXECUTIVE OFFICERS
Directors
The following individuals are directors of Suncor. The term of each director is from the date of the meeting at which he or she is elected or appointed until the next annual meeting of shareholders or until a successor is elected or appointed. Richard L. George and Brian MacNeill are not standing for re-election at Suncor's 2012 annual general meeting, scheduled to be held on May 1, 2012.
Suncor Directors Name and Jurisdiction of Residence |
Period Served and Independence |
Biography | |||
Mel E. Benson (1)(2) Alberta, Canada |
Director since 2000 Independent |
Mel Benson is president of Mel E. Benson Management Services Inc., an international management consulting firm based in Calgary, Alberta. In 2000, Mr. Benson retired from a major international oil company. Mr. Benson is an owner of Tenex Energy Inc. and a director of Winalta Inc. and Fort McKay Group of Companies, a community trust. He is also a director of Hull Child and Family Services, a non-profit organization. | |||
Dominic D`Alessandro (3)(4) Ontario, Canada |
Director since 2009 Independent |
Dominic D'Alessandro was president and chief executive officer of Manulife Financial Corporation from 1994 to 2009 and is currently a director of CGI Group Inc. and Canadian Imperial Bank of Commerce. For his many business accomplishments, Mr. D'Alessandro was recognized as Canada's Most Respected CEO in 2004 and CEO of the Year in 2002, and was inducted into the Insurance Hall of Fame in 2008. Mr. D'Alessandro is an officer of the Order of Canada and has been appointed as a Commendatore of the Order of the Star of Italy. In 2009, he received the Woodrow Wilson Award for Corporate Citizenship and in 2005 was granted the Horatio Alger Award for community leadership. Mr. D'Alessandro is an FCA, and holds a Bachelor of Science from Concordia University in Montreal. He has also been awarded honorary doctorates from York University, the University of Ottawa, Ryerson University and Concordia University. | |||
John T. Ferguson Alberta, Canada |
Director since 1995 Independent |
John Ferguson is founder and chairman of the board of Princeton Developments Ltd. and Princeton Ventures Ltd. Mr. Ferguson is also a director of Fountain Tire Ltd. and Strategy Summit Ltd. and until March 1, 2012 was a director of the Royal Bank of Canada. In addition, he is a member of the Order of Canada, a board member of the Alberta Bone and Joint Institute, an advisory member of the Canadian Institute for Advanced Research, Honorary Colonel South Alberta Light Horse and chancellor emeritus and chairman emeritus of the University of Alberta. Mr. Ferguson is a fellow of the Alberta Institute of Chartered Accountants and of the Institute of Corporate Directors. | |||
W. Douglas Ford (1)(4) Florida, USA |
Director since 2004 Independent |
W. Douglas Ford was chief executive, refining and marketing for BP p.l.c. from 1998 to 2002 and was responsible for the refining, marketing and transportation network of BP as well as the aviation fuels business, the marine business and BP shipping. Mr. Ford currently serves as a director of USG Corporation and Air Products and Chemicals Inc. He is also a member of the board of trustees of the University of Notre Dame. | |||
Richard L. George Alberta, Canada |
Director since 1991 Non-independent, management |
Richard George is CEO of Suncor Energy Inc. He currently serves as a director of Canadian Pacific Railway and he chaired the 2008 Governor General's Canadian Leadership Conference. Mr. George was named a member of the Order of Canada in 2007. | |||
Paul Haseldonckx (2)(3) Essen, Germany |
Director since 2009 (Petro-Canada 2002 to July 31, 2009) Independent |
Paul Haseldonckx was a director of Petro-Canada and a member of the management board of Veba Oel AG, Germany's largest downstream company, including Aral AG gas stations in Europe. Mr. Haseldonckx represented Veba's interests at the board of the Cerro Negro joint venture, an in situ oil sands development including an upgrader, during the construction and early production phase. Mr. Haseldonckx holds a Master of Science and completed Executive Programs at INSEAD, Fontainebleau and IMD, Lausanne. | |||
John R. Huff (1)(2) Texas, USA |
Director since 1998 Independent |
John Huff is chairman of Oceaneering International Inc., an oilfield services company. He also serves as director of KBR Inc. |
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 71
Jacques Lamarre (1)(2) Quebec, Canada |
Director since 2009 Independent |
Jacques Lamarre is a strategic advisor to the law firm Heenan Blaikie LLP. He was the president and chief executive officer of SNC-Lavalin from 1996 to 2009. Mr. Lamarre is an Officer of the Order of Canada and a founding member and past chair of the Commonwealth Business Council. He is also past chair of the board of directors of the Conference Board of Canada and a founding member of the World Economic Forum's Governors for Engineering & Construction. Currently, he serves as director of the Royal Bank of Canada, PPP Canada Inc. and the Canadian Institute for Advanced Research, and as a member of the Engineering Institute of Canada, Engineers Canada and the Ordre des ingénieurs du Québec. Mr. Lamarre holds a Bachelor of Arts and a Bachelor of Arts and Science in Civil Engineering from Université Laval in Quebec City. He also completed Harvard University's Executive Development Program. In addition, Mr. Lamarre holds honorary doctorates from the University of Waterloo, the University of Moncton and Université Laval. | |||
Brian MacNeill (3)(4) Alberta, Canada |
Director since 2009 (Petro-Canada 1995 to July 31, 2009) Independent |
Brian MacNeill is a Chartered Accountant, a Certified Public Accountant and holds a Bachelor of Commerce. Previously, Mr. MacNeill was a director and chairman of the board of Petro-Canada. He is a director of West Fraser Timber Co. Ltd., Capital Power Corp. and Oilsands Quest Inc. Mr. MacNeill is a member of the Canadian Institute of Chartered Accountants and the Financial Executives Institute. He is also a fellow of the Alberta Institute of Chartered Accountants and of the Institute of Corporate Directors. Mr. MacNeill is also a member of the Order of Canada. | |||
Maureen McCaw (1)(2) Alberta, Canada |
Director since 2009 (Petro-Canada 2004 to July 31, 2009) Independent |
Maureen McCaw was a director of Petro-Canada and is past president (Edmonton) of Leger Marketing, formerly Criterion Research Corp., a company she founded in 1986. Ms. McCaw holds a Bachelor of Arts from the University of Alberta and an Institute of Corporate Directors certification (ICD.D). In addition to being president of Tinnakilly Inc. and a director of the Edmonton International Airport, Women Building Futures, Nature Conservancy of Canada, Alberta chapter, and Royal Alexandra Hospital, she is also managing partner at Prism Ventures. She is a past chair of the Edmonton Chamber of Commerce and serves on a number of Alberta boards and advisory committees. | |||
Michael W. O'Brien (3)(4) Alberta, Canada |
Director since 2002 Independent |
Michael O'Brien served as executive vice president, corporate development, and chief financial officer of Suncor Energy Inc. before retiring in 2002. Mr. O'Brien is lead director of Shaw Communications Inc. In addition, he is past chair of the board of trustees for Nature Conservancy Canada, past chair of the Canadian Petroleum Products Institute and past chair of Canada's Voluntary Challenge for Global Climate Change. | |||
James Simpson (1)(4) Alberta, Canada |
Director since 2009 (Petro-Canada 2004 to July 31, 2009) Independent |
James Simpson was a director of Petro-Canada and is past president of Chevron Canada Resources (oil and gas). He serves as lead director for Canadian Utilities Limited and is on its Corporate Governance, Nomination, Compensation and Succession Committee and Risk Review Committee, as well as being the chairman for the Audit Committee. Mr. Simpson holds a Bachelor of Science and Master of Science, and graduated from the Program for Senior Executives at M.I.T.'s Sloan School of Business. He is also past chairman of the Canadian Association of Petroleum Producers and past vice chairman of the Canadian Association of the World Petroleum Congresses. | |||
Eira M. Thomas (3)(4) British Columbia, Canada |
Director since 2006 Independent |
Eira Thomas is a Canadian geologist with over twenty years of experience in the Canadian diamond business, including her previous roles as vice president of Aber Resources, now Harry Winston Diamond Corp., and as founder and CEO of Stornoway Diamond Corp. Currently, Ms. Thomas is a director of Lucara Diamond Corp. and Strongbow Exploration Inc. She also serves on the board of the Prospectors and Developers Association of Canada. |
72 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
Steven W. Williams Alberta, Canada |
Director since December 2011 Non-independent, management |
Steve Williams has served as the chief operating officer of Suncor Energy Inc. since 2007. He was appointed as President of Suncor Energy Inc. in December of 2011. Mr. Williams is a fellow of the Institute of Chemical Engineers and is a member of the Institute of Directors. He is also co-chair of the Oil Sands Leadership Initiative (OSLI), a member of the CEO Committee of Syncrude Canada Limited, and a member of the Business Advisory Council, School of Business at the University of Alberta. In October of 2010, he was appointed to the Alberta Government Oil and Gas Economics Advisory Council. | |||
Executive Officers
The following individuals are the executive officers of Suncor:
Name | Jurisdiction of Residence | Office | |||
Richard L. George | Alberta, Canada | Chief Executive Officer | |||
Steven W. Williams | Alberta, Canada | President and Chief Operating Officer | |||
Bart W. Demosky | Alberta, Canada | Chief Financial Officer | |||
Eric Axford | Alberta, Canada | Executive Vice President, Business Services | |||
Boris Jackman | Ontario, Canada | Executive Vice President, Refining and Marketing | |||
Mark Little | Alberta, Canada | Executive Vice President, Oil Sands and In Situ | |||
Mike MacSween | Alberta, Canada | Executive Vice President, Major Projects | |||
Steve Reynish | Alberta, Canada | Executive Vice President, Oil Sands Ventures | |||
Paul Gardner | Alberta, Canada | Senior Vice President, Human Resources | |||
Francois Langlois | Alberta, Canada | Senior Vice President, Exploration and Production | |||
Janice Odegaard | Alberta, Canada | Senior Vice President, General Counsel and Corporate Secretary | |||
Kris Smith | Alberta, Canada | Senior Vice President, Supply, Trading and Corporate Development | |||
As at December 31, 2011, the directors and executive officers of Suncor as a group beneficially owned, or controlled or directed, directly or indirectly, common shares of Suncor representing less than 1% of the then outstanding common shares.
Cease Trade Orders, Bankruptcies, Penalties or Sanctions
To the best of our knowledge, having made due inquiry, we confirm that, as at the date hereof, no director or executive officer of Suncor is or has been within the last ten years a director, chief executive officer or chief financial officer of a company that: (a) was the subject of a cease trade or similar order, or an order that denied the relevant issuer access to any exemption under Canadian securities legislation that was in effect for a period of more than 30 consecutive days while the director or officer was acting in that capacity, other than Mr. MacNeill, who is presently a director of Oilsands Quest Inc. (Oilsands Quest), a company that has been subject to a cease trade order of the NYSE Amex since November 2011 for failure to meet certain NYSE Amex continued listing standards; or (b) was subject to a cease trade order or similar order, or an order that denied the relevant company access to any exemption under securities legislation that was in effect for a period of more than 30 consecutive days, that was issued after the director or executive officer ceased to be a director, chief executive officer or chief financial officer and which resulted from an event that occurred while that person was acting in that capacity.
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 73
To the best of our knowledge, having made due inquiry, we confirm that, as at the date hereof, no director or executive officer of Suncor, or any of their respective personal holding companies, nor any shareholders holding a sufficient number of securities to affect materially the control of Suncor: (a) is, or has been within the last ten years, a director or executive officer of any company (including Suncor) that, while that person was acting in that capacity, or within a year of that person ceasing to act in that capacity, became bankrupt, made a proposal under any legislation relating to bankruptcy or insolvency or was subject to or instituted any proceedings, arrangement or compromise with creditors or had a receiver, receiver manager or trustee appointed to hold its assets, other than: (i) Mr. Ford, a director of Suncor who is currently a director of USG Corporation, which was in bankruptcy protection until June 2006 and who was also a director of United Airlines (until February 2006), which was in Chapter 11 bankruptcy protection until February 2006; and (ii) Mr. MacNeill, a director of Suncor who is currently a director of Oilsands Quest, which is currently operating under the protection of the Canada Companies' Creditors Arrangement Act; or (b) has, within the last ten years, become bankrupt, made a proposal under any legislation relating to bankruptcy or insolvency or become subject to or instituted any proceedings, arrangement or compromise with creditors, or had a receiver, receiver manager or trustee appointed to hold the assets of the director, executive officer or shareholder.
No director or executive officer of Suncor has been subject to: (a) any penalties or sanctions imposed by a court relating to securities legislation or by a securities regulatory authority or has entered into a settlement agreement with a securities regulatory authority; or (b) any other penalties or sanctions imposed by a court or regulatory body that would likely be considered important to a reasonable investor in making an investment decision.
AUDIT COMMITTEE INFORMATION
The Audit Committee Mandate is attached as Schedule "A" to this AIF.
Composition of the Audit Committee
The Audit Committee is comprised of Mr. O'Brien (Chairman), Mr. D'Alessandro, Mr. MacNeill, Mr. Haseldonckx and Ms. Thomas. All members are independent and financially literate. The education and expertise of each member is described in the Directors and Executive Officers section of this AIF.
For the purpose of making appointments to the company's Audit Committee, and in addition to the independence requirements, all directors nominated to the Audit Committee must meet the test of financial literacy as determined in the judgment of the Board of Directors. Also, at least one director so nominated must meet the test of financial expert as determined in the judgment of the Board of Directors. The designated financial experts on the Audit Committee are Mr. O'Brien and Mr. D'Alessandro.
Financial Literacy
Financial literacy can be generally defined as the ability to read and understand a balance sheet, an income statement and a cash flow statement. In assessing a potential appointee's level of financial literacy, the Board of Directors must evaluate the totality of the individual's education and experience, including:
74 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
Audit Committee Financial Expert
An "Audit Committee Financial Expert" means a person who, in the judgment of the company's Board of Directors, has the following attributes:
A person shall have acquired the attributes referred to in items (a) through (e) inclusive above through:
Audit Committee Pre-Approval Policies for Non-Audit Services
Our Audit Committee has considered whether the provision of services other than audit services is compatible with maintaining the auditors' independence and has a policy governing the provision of these services. A copy of our policy relating to Audit Committee approval of fees paid to our auditors, in compliance with the Sarbanes-Oxley Act of 2002 and applicable Canadian law, is attached as Schedule "B" to this AIF.
Fees Paid to Auditors
Fees payable to PricewaterhouseCoopers LLP in 2011 and 2010, the nature of which are described below, were as follows:
($ thousands) | 2011 | 2010 | |||
Audit Fees | 6 145 | 4 873 | |||
Audit-Related Fees | 423 | 637 | |||
Tax Fees | 50 | | |||
All Other Fees | 9 | 4 | |||
Total | 6 627 | 5 514 | |||
Audit Fees were paid for professional services rendered by the auditors for the audit of Suncor's annual financial statements, or services provided in connection with statutory and regulatory filings or engagements. Audit-Related Fees were paid for professional services rendered by the auditors for the review of quarterly financial statements and for the preparation of reports on specified procedures as they relate to joint venture audits and attest services not required by statute or regulation. Tax Fees for corporate tax filings and tax planning were paid in a foreign jurisdiction where Suncor has limited activity. All Other Fees
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 75
were subscriptions to auditor-provided and supported tools. The services described for Audit Fees, Audit-Related Fees and Tax Fees and All Other Fees were approved by the Audit Committee pursuant to paragraph (c)(7)(i) of Rule 2-01 of Regulation S-X. See Schedule "B" in this AIF for the company's Policy and Procedures for Pre-Approval of Audit and Non-Audit Services.
LEGAL PROCEEDINGS AND REGULATORY ACTIONS
There are no legal proceedings to which we are or were a party, or of which any of our property is or was the subject since the beginning of the company's most recently completed financial year, nor are there any proceedings known by us to be contemplated, that involve a claim for damages exceeding 10% of our current assets. In addition, there have not been any (a) penalties or sanctions imposed against the company by a court relating to securities legislation or by a securities regulatory authority during our financial year, (b) penalties or sanctions imposed by a court or regulatory body against the company that would likely be considered important to a reasonable investor in making an investment decision, or (c) settlement agreements entered into by the company before a court relating to securities legislation or with a securities regulatory authority during the financial year.
INTEREST OF MANAGEMENT AND OTHERS IN MATERIAL TRANSACTIONS
No director or executive officer, or any associate or affiliate of these persons has, or has had, any material interests, direct or indirect, in any transaction or any proposed transaction that has materially affected or is reasonably expected to materially affect us or any of our affiliates within the three most recently completed financial years or during the current financial year.
TRANSFER AGENT AND REGISTRAR
The transfer agent and registrar for our common shares is Computershare Trust Company of Canada at its principal offices in Calgary, Alberta, Montreal, Quebec, Toronto, Ontario and Vancouver, British Columbia and Computershare Trust Company Inc. in Denver, Colorado.
MATERIAL CONTRACTS
During the year ended December 31, 2011, we have not entered into any contracts, nor are there any contracts still in effect, that are material to our business, other than contracts entered into in the ordinary course of business, and that are not required to be filed by Section 12.2 of National Instrument 51-102 Continuous Disclosure Obligations.
INTERESTS OF EXPERTS
Reserves and resources estimates contained in this AIF are based in part upon reports prepared by GLJ and Sproule, Suncor's independent qualified reserves evaluators. The 2011 audited Consolidated Financial Statements of the company have been audited by PricewaterhouseCoopers LLP, Suncor's auditors. As at the date hereof, none of the partners, employees or consultants of GLJ or Sproule, respectively, as a group, through registered or beneficial interests, directly or indirectly, held or are entitled to receive more than 1% of any class of our outstanding securities, including the securities of our associates and affiliates, and PricewaterhouseCoopers LLP has advised Suncor's Audit Committee that they are independent with respect to Suncor within the meaning of the Rules of Professional Conduct of the Institute of Chartered Accountants of Alberta.
DISCLOSURE PURSUANT TO THE REQUIREMENTS OF THE NEW YORK STOCK EXCHANGE
As a Canadian issuer listed on the NYSE, we are not required to comply with most of the NYSE rules and listing standards and instead may comply with domestic requirements. As a foreign private issuer, we are only required to comply with four of the NYSE rules: (i) have an audit committee that satisfies the requirements of the United States Securities Exchange Act of 1934, as amended; (ii) the Chief Executive Officer must promptly notify the NYSE in writing after an executive officer becomes aware of any material non-compliance with the applicable NYSE rules; (iii) provide a brief description of any significant differences between our corporate governance practices and those followed by U.S. companies listed under the NYSE; and (iv) provide annual and, as required, written affirmations of compliance with applicable NYSE Corporate Governance rules. The company has disclosed in its 2012 management proxy circular, which is available on our website at www.suncor.com, that, in certain instances, it is not required to obtain shareholder approval for material amendments to equity compensation plans and that
76 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
Suncor, while in compliance with the independence requirements of applicable securities laws in Canada (specifically National Instrument 52-110 Audit Committees) and the U.S. (specifically Rule 10A-3 of the Securities Exchange Act of 1934), it has not adopted the director independence standards contained in Section 303A.02 of the NYSE's Listed Company Manual. Except as described herein, the company is in compliance with the NYSE corporate governance standards in all other significant respects.
ADDITIONAL INFORMATION
Additional information, including directors' and officers' remuneration and indebtedness, principal holders of our securities, securities authorized for issuance under equity compensation plans and interests of insiders in material transactions, where applicable, is contained in our most recent management proxy circular for our most recent annual meeting of our shareholders that involved the election of directors. Additional financial information is provided in our 2011 audited Consolidated Financial Statements for our most recently completed financial year and in the MD&A.
Further information about Suncor, filed with Canadian securities commissions and the SEC, including periodic quarterly and annual reports and the AIF/40-F is available online on SEDAR at www.sedar.com and on EDGAR at www.sec.gov. In addition, our Standards of Business Conduct Code is available online at www.suncor.com. Information contained in or otherwise accessible through our website does not form part of this AIF, and is not incorporated into the AIF by reference.
ADVISORY FORWARD-LOOKING INFORMATION
This AIF contains certain forward-looking statements and other information based on information available at the time the statement was made and in light of Suncor's experience and perception of historical trends, including expectations and assumptions concerning the accuracy of reserves and resources estimates, commodity prices and interest and foreign exchange rates, capital efficiencies and cost-savings, applicable royalty rates and tax laws, future production rates, the sufficiency of budgeted capital expenditures in carrying out planned activities, the availability and cost of labour and services, and the receipt, in a timely manner, of regulatory and third-party approvals. In addition, all other statements that address expectations or projections about the future, and other statements and information about Suncor's strategy for growth, expected and future expenditures or investment decisions, commodity prices, costs, schedules, production volumes, operating and financial results, future financing and capital activities, and expected impact of future commitments are forward-looking statements. Some of the forward-looking statements and information may be identified by words like "expects", "anticipates", "estimates", "plans", "scheduled", "intends", "believes", "projects", "indicates", "could", "focus", "vision", "goal", "outlook", "proposed", "target", "objective", "continue" and similar expressions.
Forward-looking statements in this AIF include references to:
Suncor's expectations about production volumes and the performance of its existing assets, including:
The anticipated duration and impact of planned maintenance events, including:
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 77
Suncor's expectations about where future capital expenditures will be directed, the timing for completion of growth and other significant projects, and the results of such projects, including:
78 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
Also:
Forward-looking statements and information are not guarantees of future performance and involve a number of risks and uncertainties, some that are similar to other oil and gas companies and some that are unique to Suncor. Suncor's actual results may differ materially from those expressed or implied by its forward-looking statements, so readers are cautioned not to place undue reliance on them.
The financial and operating performance of the company's reportable operating segments, specifically Oil Sands, Exploration and Production, and Refining and Marketing, may be affected by a number of factors:
Factors that affect our Oil Sands segment include, but are not limited to, volatility in the prices for crude oil and other production, and the related impacts of fluctuating light/heavy and sweet/sour crude oil differentials; changes in the demand for refinery feedstock and diesel fuel, including the possibility that refiners that process our proprietary production will be closed, experience equipment failure or other accidents; our ability to operate facilities reliably in order to meet production targets; the output of newly commissioned facilities, the performance of which may be difficult to predict during initial operations; the possibility that completed maintenance activities may not improve operational performance or the output of related facilities; our dependence on pipeline capacity and other logistical constraints, which may affect our ability to distribute our products to market; our ability to finance growth and sustaining capital expenditures; the availability of bitumen feedstock for upgrading operations, which can be negatively affected by poor ore grade quality, unplanned mine equipment and extraction plant maintenance, tailings storage, in situ reservoir and equipment performance, or the unavailability of third-party bitumen; inflationary pressures on operating costs, including labour, natural gas and other energy sources in oil sands processes; our ability to complete projects, including planned maintenance events, both on time and on budget, which could be impacted by competition from other projects (including other oil sands projects) for goods and services and demands on infrastructure in Fort McMurray and the surrounding area (including housing, roads and schools); risks and uncertainties associated with obtaining regulatory and stakeholder approval for exploration and development activities; changes to royalty and tax legislation and related agreements that could impact our business, such as our current dispute with the Alberta Department of Energy in respect of the Bitumen Valuation Methodology Regulation; the potential for disruptions to operations and construction projects as a result of our relationships with labour unions that represent employees at our facilities; and changes to environmental regulations or legislation.
Factors that affect our Exploration and Production segment include, but are not limited to, volatility in crude oil and natural gas prices; operational risks and uncertainties associated with oil and gas activities, including unexpected formations or pressures, premature declines of reservoirs, fires, blow-outs, equipment failures and other accidents, uncontrollable flows of crude oil, natural gas or well fluids, and pollution and other environmental risks; the possibility that completed maintenance activities may not improve operational performance or the output of related facilities; adverse weather conditions, which could disrupt output from producing assets or impact drilling programs, resulting in increased costs and/or delays in bringing on new production; political, economic and socio-economic risks associated with Suncor's foreign operations, including the unpredictability of operating in Libya and the possibility that operations in Syria may be constrained by civil and political unrest; risks and uncertainties associated with obtaining regulatory and stakeholder approval for exploration and development activities; the potential for disruptions to operations and construction projects as a result of our relationships with labour unions that represent employees at our facilities; and market demand for mineral rights and producing properties, potentially leading to losses on disposition or increased property acquisition costs.
Factors that affect our Refining and Marketing segment include, but are not limited to, fluctuations in demand and supply for refined products that impact the company's margins; market competition, including potential new market entrants; our ability to reliably operate refining and marketing facilities in order to meet production or sales targets; the possibility that completed
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM 79
maintenance activities may not improve operational performance or the output of related facilities; risks and uncertainties affecting construction or planned maintenance schedules, including the availability of labour and other impacts of competing projects drawing on the same resources during the same time period; and the potential for disruptions to operations and construction projects as a result of our relationships with labour unions or employee associations that represent employees at our refineries and distribution facilities.
Additional risks, uncertainties and other factors that could influence financial and operating performance of all of Suncor's operating segments and activities include, but are not limited to, changes in general economic, market and business conditions, such as commodity prices, interest rates and currency exchange rates; fluctuations in supply and demand for Suncor's products; the successful and timely implementation of capital projects, including growth projects and regulatory projects; competitive actions of other companies, including increased competition from other oil and gas companies or from companies that provide alternative sources of energy; labour and material shortages; actions by government authorities, including the imposition of taxes or changes to fees and royalties, and changes in environmental and other regulations; the ability and willingness of parties with whom we have material relationships to perform their obligations to us; the occurrence of unexpected events such as fires, equipment failures and other similar events affecting Suncor or other parties whose operations or assets directly or indirectly affect Suncor; the potential for security breaches of Suncor's information systems by computer hackers or cyberterrorists, and the unavailability or failure of such systems to perform as anticipated as a result of such breaches; our ability to find new oil and gas reserves that can be developed economically; the accuracy of Suncor's reserves, resources and future production estimates; market instability affecting Suncor's ability to borrow in the capital debt markets at acceptable rates; maintaining an optimal debt to cash flow ratio; the success of the company's risk management activities using derivatives and other financial instruments; the cost of compliance with current and future environmental laws; risks and uncertainties associated with closing a transaction for the purchase or sale of an oil and gas property, including estimates of the final consideration to be paid or received, the ability of counterparties to comply with their obligations in a timely manner and the receipt of any required regulatory or other third-party approvals outside of Suncor's control that are customary to transactions of this nature; the accuracy of cost estimates, some of which are provided at the conceptual or other preliminary stage of projects and prior to commencement or conception of the detailed engineering that is needed to reduce the margin of error and increase the level of accuracy; failure to realize anticipated synergies or cost-savings; risks regarding the integration of Suncor and Petro-Canada after the merger; and incorrect assessments of the values of assets acquired and liabilities assumed in the merger with Petro-Canada. The foregoing important factors are not exhaustive.
Many of these risk factors and other assumptions related to Suncor's forward-looking statements and information are discussed in further detail throughout this AIF and in our MD&A. Readers are also referred to the risk factors and assumptions described in other documents that Suncor files from time-to-time with securities regulatory authorities. Copies of these documents are available without charge from Suncor at 150 6th Avenue S.W., Calgary, Alberta, T2P 3E3, by calling 1-800-558-9071, or by email request to info@suncor.com or by referring to SEDAR at www.sedar.com or by referring to EDGAR at www.sec.gov. Information contained in or otherwise accessible through our website does not form a part of this AIF, and is not incorporated into this AIF by reference.
80 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
SCHEDULE "A"
AUDIT COMMITTEE MANDATE
The Audit Committee
The bylaws of Suncor Energy Inc. provide that the Board of Directors may establish Board committees to whom certain duties may be delegated by the Board. The Board has established, among others, the Audit Committee, and has approved this mandate, which sets out the objectives, functions and responsibilities of the Audit Committee.
Objectives
The Audit Committee assists the Board of Directors by:
The Committee does not have decision-making authority, except in the very limited circumstances described herein or where and to the extent that such authority is expressly delegated by the Board of Directors. The Committee conveys its findings and recommendations to the Board of Directors for consideration and, where required, decision by the Board of Directors.
Constitution
The Terms of Reference of Suncor's Board of Directors set out requirements for the composition of Board Committees and the qualifications for committee membership, and specify that the Chair and membership of the committees are determined annually by the Board. As required by Suncor's bylaws, unless otherwise determined by resolution of the Board of Directors, a majority of the members of a committee constitute a quorum for meetings of committees, and, in all other respects, each committee determines its own rules of procedure.
Functions and Responsibilities
The Audit Committee has the following functions and responsibilities:
Internal Controls
External and Internal Auditors
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM A-1
Financial Reporting and other Public Disclosure
Oil and Gas Reserves
A-2 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
Risk Management
Pension Plan
Security
Other Matters
Reporting to the Board
Approved by resolution of the Board of Directors on February 1, 2011.
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM A-3
SCHEDULE "B"
SUNCOR ENERGY INC.
POLICY AND PROCEDURES FOR PRE-APPROVAL
OF AUDIT AND NON-AUDIT SERVICES
Pursuant to the Sarbanes-Oxley Act of 2002 and Multilateral Instrument 52-110, the Securities and Exchange Commission (SEC) and the Ontario Securities Commission respectively have adopted final rules relating to audit committees and auditor independence. These rules require the Audit Committee of Suncor Energy Inc ("Suncor") to be responsible for the appointment, compensation, retention and oversight of the work of its independent auditor. The Audit Committee must also pre-approve any audit and non-audit services performed by the independent auditor or such services must be entered into pursuant to pre-approval policies and procedures established by the Audit Committee pursuant to this policy.
I. STATEMENT OF POLICY
The Audit Committee has adopted this Policy and Procedures for Pre-Approval of Audit and Non-Audit Services (the Policy), which sets forth the procedures and the conditions pursuant to which services proposed to be performed by the independent auditor will be pre-approved. The procedures outlined in this Policy are applicable to all Audit, Audit-Related, Tax Services and All Other Services provided by the independent auditor.
II. RESPONSIBILITY
Responsibility for the implementation of this Policy rests with the Audit Committee. The Audit Committee delegates its responsibility for administration of this policy to management. The Audit Committee shall not delegate its responsibilities to pre-approve services performed by the independent auditor to management.
III. DEFINITIONS
For the purpose of these policies and procedures and any pre-approvals:
Audit-Related Services include:
Non-financial operational audits are not Audit-Related Services.
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM B-1
IV. GENERAL POLICY
The following general policy applies to all services provided by the independent auditor.
B-2 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
V. RESPONSIBILITIES OF EXTERNAL AUDITORS
To support the independence process, the independent auditors will:
In addition, the external auditors will:
VI. DISCLOSURES
Suncor will, as required by applicable law, annually disclose its pre-approval policies and procedures, and will provide the required disclosure concerning the amounts of audit fees, audit-related fees, tax fees and all other fees paid to its outside auditors in its filings with the SEC.
Approved and Accepted April 28, 2004.
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM B-3
Appendix A
Prohibited Non-Audit Services
An external auditor is not independent if, at any point during the audit and professional engagement period, the auditor provides the following non-audit services to an audit client.
Bookkeeping or other services related to the accounting records or financial statements of the audit client. Any service, unless it is reasonable to conclude that the results of these services will not be subject to audit procedures during an audit of Suncor's financial statements, including:
Financial information systems design and implementation. Any service, unless it is reasonable to conclude that the results of these services will not be subject to audit procedures during an audit of Suncor's financial statements, including:
Appraisal or valuation services, fairness opinions or contribution-in-kind reports. Any appraisal service, valuation service or any service involving a fairness opinion or contribution-in-kind report for Suncor, unless it is reasonable to conclude that the results of these services will not be subject to audit procedures during an audit of Suncor's financial statements.
Actuarial services. Any actuarially-oriented advisory service involving the determination of amounts recorded in the financial statements and related accounts for Suncor other than assisting Suncor in understanding the methods, models, assumptions, and inputs used in computing an amount, unless it is reasonable to conclude that the results of these services will not be subject to audit procedures during an audit of Suncor's financial statements.
Internal audit outsourcing services. Any internal audit service that has been outsourced by Suncor that relates to Suncor's internal accounting controls, financial systems or financial statements, unless it is reasonable to conclude that the result of these services will not be subject to audit procedures during an audit of Suncor's financial statements.
Management functions. Acting, temporarily or permanently, as a director, officer, or employee of Suncor, or performing any decision-making, supervisory, or ongoing monitoring function for Suncor.
Human resources. Any of the following:
Broker-dealer, investment adviser or investment banking services. Acting as a broker-dealer (registered or unregistered), promoter, or underwriter, on behalf of Suncor, making investment decisions on behalf of Suncor or otherwise having discretionary authority over Suncor's investments, executing a transaction to buy or sell Suncor's investment, or having custody of Suncor's assets, such as taking temporary possession of securities purchased by Suncor.
Legal services. Providing any service to Suncor that, under circumstances in which the service is provided, could be provided only by someone licensed, admitted, or otherwise qualified to practice law in the jurisdiction in which the service is prohibited.
B-4 SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM
Expert services unrelated to the audit. Providing an expert opinion or other expert service for Suncor, or Suncor's legal representative, for the purpose of advocating Suncor's interest in litigation or in a regulatory or administrative proceeding or investigation. In any litigation or regulatory or administrative proceeding or investigation, an accountant's independence shall not be deemed to be impaired if the accountant provides factual accounts, including testimony, of work performed or explains the positions taken or conclusions reached during the performance of any service provided by the accountant for Suncor.
Appendix B
Pre-Approval Request Form
NATURE OF WORK | ESTIMATED FEES (Cdn $) |
|
Total | ||
Date | Signature |
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM B-5
SCHEDULE "C"
FORM 51-101F2
REPORT ON RESERVES DATA BY
INDEPENDENT QUALIFIED RESERVES
EVALUATOR OR AUDITOR
To the board of directors of Suncor Energy Inc. (the "Company"):
We carried out our evaluation in accordance with standards set out in the Canadian Oil and Gas Evaluation Handbook (the "COGE Handbook") prepared jointly by the Society of Petroleum Evaluation Engineers (Calgary Chapter) and the Canadian Institute of Mining, Metallurgy & Petroleum (Petroleum Society).
Independent Qualified | Description and Preparation Date of |
Location of Reserves (Country or Foreign |
Net Present Value of Future Net Revenues (before income taxes, 10% discount rate-$MM) |
||||||||||
Reserves Evaluator | Evaluation Report | Geographic Area) | Audited | Evaluated | Reviewed | Total | |||||||
GLJ Petroleum Consultants | Oil Sands In-Situ January 12, 2012 |
Canada | | 17 247 | | 17 247 | |||||||
GLJ Petroleum Consultants |
Oil Sands Mining January 12, 2012 |
Canada |
|
31 757 |
|
31 757 |
|||||||
49 004 | |||||||||||||
EXECUTED as to our report referred to above:
GLJ Petroleum Consultants Ltd., Calgary, Alberta, Canada, March 1, 2012
"Caralyn P. Bennett"
Caralyn
P. Bennett, P. Eng.
Vice-President
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM C-1
SCHEDULE "D"
FORM 51-101F2
REPORT ON RESERVES DATA BY
INDEPENDENT QUALIFIED RESERVES
EVALUATOR OR AUDITOR
To the board of directors of Suncor Energy Inc. (the "Company"):
We carried out our evaluation in accordance with standards set out in the Canadian Oil and Gas Evaluation Handbook (the "COGE Handbook") prepared jointly by the Society of Petroleum Evaluation Engineers (Calgary Chapter) and the Canadian Institute of Mining, Metallurgy & Petroleum (Petroleum Society).
Description and | Location of Reserves | Net Present Value of Future Net Revenue (before income taxes, 10% discount rate) ($MM) |
|||||||||||
Independent Qualified | Preparation Date of | (Country or Foreign | |||||||||||
Reserves Evaluator | Evaluation Report | Geographic Area) | Audited | Evaluated | Reviewed | Total | |||||||
Sproule Associates Limited | East Coast Canada February 16, 2012 |
Newfoundland Offshore, Canada | | 7 904 | | 7 904 | |||||||
Sproule Associates Limited |
North America Onshore February 16, 2012 |
Western Canada |
|
2 126 |
|
2 126 |
|||||||
Sproule International Limited |
North Sea February 16, 2012 |
North Sea, United Kingdom |
|
9 026 |
|
9 026 |
|||||||
Sproule International Limited |
Other International February 16, 2012 |
Libya, Syria |
|
6 195 |
|
6 195 |
|||||||
|
25 251 |
|
25 251 |
||||||||||
EXECUTED as to our report referred to above:
Sproule Associates Limited and Sproule International Limited, Calgary, Alberta, Canada, March 1, 2012
"Harry J. Helwerda"
Harry
J. Helwerda, P. Eng., FEC
Executive Vice-President and Director
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM D-1
SCHEDULE "E"
FORM 51-101F3
REPORT OF MANAGEMENT AND DIRECTORS
ON RESERVES DATA AND OTHER INFORMATION
Management of Suncor Energy Inc. (the "Company") are responsible for the preparation and disclosure of information with respect to the Company's oil and gas activities in accordance with securities regulatory requirements. This information includes reserves data which are estimates of proved reserves and probable reserves and related future net revenues as at December 31, 2011, estimated using forecast prices and costs.
Independent qualified reserves evaluators have evaluated the Company's reserves data. The reports of the independent qualified reserves evaluators will be filed with securities regulatory authorities concurrently with this report.
The Audit Committee of the board of directors of the Company has
The Audit Committee of the board of directors has reviewed the Company's procedures for assembling and reporting other information associated with oil and gas activities and has reviewed that information with management. The board of directors has, on the recommendation of the Audit Committee, approved
Because the reserves data are based on judgments regarding future events, actual results will vary and the variations may be material.
"Richard L. George"
RICHARD L. GEORGE
Chief Executive Officer
"Bart W. Demosky"
BART W. DEMOSKY
Chief Financial Officer
"John T. Ferguson"
JOHN T. FERGUSON
Chairman of the Board of Directors
"Michael W. O'Brien"
MICHAEL W. O'BRIEN
Chair of the Audit Committee
March 1, 2012
SUNCOR ENERGY INC. 2012 ANNUAL INFORMATION FORM E-1
Box 2844, 150 - 6th Avenue S.W., Calgary, Alberta, Canada T2P 3E3 tel: (403) 296-6000 fax: (403) 296-3030 info@suncor.com www.suncor.com |
UNDERTAKING AND CONSENT TO SERVICE OF PROCESS
A. Undertaking
Suncor Energy Inc. (the "Registrant") undertakes to make available, in person or by telephone, representatives to respond to inquiries made by the staff of the Securities and Exchange Commission ("SEC"), and to furnish promptly, when requested to do so by the SEC staff, information relating to the securities in relation to which the obligation to file an annual report on Form 40-F arises, or transactions in said securities.
B. Consent to Service of Process
The Registrant has filed previously with the SEC a Form F-X in connection with the Common Shares.
DISCLOSURE CONTROLS AND PROCEDURES AND INTERNAL CONTROL OVER FINANCIAL REPORTING
See pages 79 and 80 of Exhibit 99-1 and page 70 of Exhibit 99-2.
ATTESTATION REPORT OF THE REGISTERED PUBLIC ACCOUNTING FIRM
See pages 81 and 82 of Exhibit 99-1.
AUDIT COMMITTEE FINANCIAL EXPERT
See pages 74 and 75 of Annual Information Form.
See pages 25 and 77 of Annual Information Form.
FEES PAID TO PRINCIPAL ACCOUNTANT
See pages 75 and 76 of Annual Information Form.
AUDIT COMMITTEE PRE-APPROVAL POLICIES
See Schedule "B" of Annual Information Form.
APPROVAL OF NON-AUDIT SERVICES
See Schedule "B" of Annual Information Form.
OFF-BALANCE SHEET ARRANGEMENTS
See page 55 of Exhibit 99-2.
TABULAR DISCLOSURE OF CONTRACTUAL OBLIGATIONS
See page 55 of Exhibit 99-2.
IDENTIFICATION OF THE AUDIT COMMITTEE
See page 74 of Annual Information Form.
Pursuant to the requirements of the Exchange Act, the registrant certifies that it meets all of the requirements for filing on Form 40-F and has duly caused this annual report to be signed on its behalf by the undersigned, thereto duly authorized.
SUNCOR ENERGY INC. | ||||
DATE: March 1, 2012 |
||||
PER: |
/s/ BART W. DEMOSKY Bart W. Demosky Chief Financial Officer |
Exhibit No.
|
Description | ||
---|---|---|---|
99-1 | Audited Consolidated Financial Statements of Suncor Energy Inc. for the fiscal year ended December 31, 2011 | ||
99-2 |
Management's Discussion and Analysis for the fiscal year ended December 31, 2011, dated February 23, 2012 |
||
99-3 |
Consent of PricewaterhouseCoopers LLP |
||
99-4 |
Consent of GLJ Petroleum Consultants Ltd. |
||
99-5 |
Consent of Sproule Associates Limited and Sproule International Limited |
||
99-6 |
Certificate of Chief Executive Officer Pursuant to Exchange Act Rules 13a-14(a) or 15d-14(a) |
||
99-7 |
Certificate of the Chief Financial Officer Pursuant to Exchange Act Rules 13a-14(a) or 15d-14(a) |
||
99-8 |
Certificate of the Chief Executive Officer Pursuant to 18 U.S.C. Section 1350, as Enacted Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 |
||
99-9 |
Certificate of the Chief Financial Officer Pursuant to 18 U.S.C. Section 1350, as Enacted Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 |